Loading...
HomeMy WebLinkAboutComments SUB 5/6/2009 .. . . SPRINGFIELD UTILITY BOARD WATER SERVICE CE;-.,JTER 202 South 18th Street Springfield, OR 97477-5240 Tel 541,726.2396 Fax 541.747.7348 www.subutil.com May 5, 2009 t!,) 00 DateReceived:~ Planner: MM Mark Metzger City of Springfield 225 N. 5th Street Springfield, OR 97477 Dear Mark: SUBJECT: SITE PLAN REVIEW #DRC2009-00014 PURVIS / SPRINGFIELD DIALYSIS - Tax Map 1'1-03-26-24, Tax Lots 1500 and 1600,304 Q Street Listed below are our comments for the above referenced development proposal: I. The proposed development is within the Springfield city limits and will receive water service from the Springfield Utility Board (SUB). There are currently two %" services serving the two lots in this development. Since a larger domestic service and fire service are required for this development, we will have to tap our existing water main that is located in Q Street, which will require cutting the pavement, all at the owner/developers expense. 2. All new water system facilities and modifications to water system facilities both inside and adjacent to the proposed development shall be placed in street right-of-way at a location and depth of bury that meets the standards of the SUB Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. All workmanship shall be performed to meet or exceed SUB Water Division construction standards. 5. Size of waterline and other'facilities, including '.vater meters, must meet the needsofthe.SUB Water Division and the long-range needs of the City. These needs include, but are not limited to, meter location and access, sizes of water distribution and transmission lines, pumping facilities, and communication lines. 6. Please ask the developer to contact the SUB Water Division for detailed information on the materials and construction standards, detailed costs for installing SUB water facilities, and a schedule of construction. Construction expenses may be reduced with good planning of required water facilities, good timing of facilities installation, and joint trench opportunities. 7. All water meters will be placed in public right-of-way at a location identified by the developer. Each lot or parcel must have its own water service. S:\SITEPLAN\304 Q Street site plan tentative 5-4-09.docx . . .' 8, Water service facilities will be installed upon collection of development charges. Development policies and charges identified in this letter are subject to change. Actual charges will be those in effect at the time water service is requested. 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from wells. In every instance, care shall be taken to prevent groundwater contamination. Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. 10. Backflow prevention devices will be required for this service. Please contact Chuck Davis at 726-2396 prior to installing water service. Chuck can help in the selection of the most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. sm~ 'ZrL Rebecca Templin, P.E. Water Engineering Supervisor - Water Division RAT:mt cc: Dr. Mattox Purvis, Springfield Dialysis, LLC, 3355 Riverbend Drive, Suite 200, Springfield, Oregon 97477 Edward Johnson, Christopher Kidd & Associates, LLC, N48W16550 Libson Road, Menomonee Falls, Wisconsin, 53051 S:\SITEPLAN\304 Q Street site plan tentative 5-4-09.docx Date Received: 5/t. ,If) r Planner: MM