SPRINGFIELD UTILITY BOARD
WATER SERVICE CE;-.,JTER 202 South 18th Street Springfield, OR 97477-5240 Tel 541,726.2396 Fax 541.747.7348 www.subutil.com
May 5, 2009
t!,) 00
DateReceived:~
Planner: MM
Mark Metzger
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Mark:
SUBJECT: SITE PLAN REVIEW #DRC2009-00014 PURVIS / SPRINGFIELD DIALYSIS
- Tax Map 1'1-03-26-24, Tax Lots 1500 and 1600,304 Q Street
Listed below are our comments for the above referenced development proposal:
I. The proposed development is within the Springfield city limits and will receive water service
from the Springfield Utility Board (SUB). There are currently two %" services serving the two
lots in this development. Since a larger domestic service and fire service are required for this
development, we will have to tap our existing water main that is located in Q Street, which will
require cutting the pavement, all at the owner/developers expense.
2. All new water system facilities and modifications to water system facilities both inside and
adjacent to the proposed development shall be placed in street right-of-way at a location and
depth of bury that meets the standards of the SUB Water Division.
3. All water facility materials shall be to a standard that must meet SUB Water Division
specifications.
4. All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5. Size of waterline and other'facilities, including '.vater meters, must meet the needsofthe.SUB
Water Division and the long-range needs of the City. These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission lines, pumping facilities,
and communication lines.
6. Please ask the developer to contact the SUB Water Division for detailed information on the
materials and construction standards, detailed costs for installing SUB water facilities, and a
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
7. All water meters will be placed in public right-of-way at a location identified by the developer.
Each lot or parcel must have its own water service.
S:\SITEPLAN\304 Q Street site plan tentative 5-4-09.docx
.
.
.'
8, Water service facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to change. Actual charges will be those in
effect at the time water service is requested.
9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes from wells. In every instance, care shall be taken to prevent groundwater contamination.
Contractors/developers/owners shall be responsible for the safe handling and storage of
chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water
runoff contamination.
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396.
10. Backflow prevention devices will be required for this service. Please contact Chuck Davis at
726-2396 prior to installing water service. Chuck can help in the selection of the most
economical device and location. Water service will not be provided until a backflow plan has
been submitted to SUB Water Engineering and approved for installation.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.
sm~ 'ZrL
Rebecca Templin, P.E.
Water Engineering Supervisor - Water Division
RAT:mt
cc: Dr. Mattox Purvis, Springfield Dialysis, LLC, 3355 Riverbend Drive, Suite 200, Springfield,
Oregon 97477
Edward Johnson, Christopher Kidd & Associates, LLC, N48W16550 Libson Road, Menomonee
Falls, Wisconsin, 53051
S:\SITEPLAN\304 Q Street site plan tentative 5-4-09.docx