HomeMy WebLinkAboutPermit Electrical 1999-3-9 (2)
.
eNGFIELD ,,,,,,
The tolloWin
lOnlng, and ~proJect as SUbmitted
approval, oes not require spe ha,s the fOllOWing
. Cl Ie land use
225 FIFTH STREET ZOning_ L [) L
SPRINGFIELD, OREGijNe97h77 '
INSPECTION REQUES'tihon1iJ's37b~ ~;J '7
OFFICE: 726-3759 Ignalure
o
J~~JllYffWDstLA(f!A
[f)rY6~~f~ION ~() \CY)
~J?B~(lL- t! ~
~its are non-transferable and expire
if work is not started within 180 days
of issuance or if work is suspended for
180 days.
Expiration Da,te
The installation is being made on
property I own which is not intended
for sale, lease or rent.
Owners Signature:
-----~--------------------------------
DATE:-5 -'1-0 '1
RECEIPT It: n.J.70'K.U
RECEIVED BY: f), rY1!1..r .//1..11.. rf 0
ELECTRICAL PERMIq~L530N
City Job Number I ~
-
QQMPLETE FEE SCHEDULE BELOY
A. New Residential-Single or
Multi-Family per dwelling uni t.
Service Included:
It ems Cost Sum
1000 sq. ft. or less I $ 85.00 pP
Each additional 500
sq. ft or portion 4 liD
thereof $ 15.00
Each Manuf'd Home, or
Modular 'Dwelling
Service or Feeder ,$ 40.00
200 amps' 'or less
201 amps to 400 amps
Over 401 to 600 amps
Over 600 amps or 1000
volts
2. CONTRACTOR INSTALLATION ONLY B. Services or Feeders
. ~I ~- Installation, Alterations
Electrical contractor-4lJ~ S L tClfl.(L---or Relocation:
Address ~ I'T- , 200 amps or less
,r- \ C " I ~ 201 amps to 400 amps
City 't'~\flttL Phone~~-1S1~ 401 amps to. 600 amps
601 amps to 1000 amps
SupeL'visor License Number ;J3:J1- 5 Over 1000 amps/volts
/, Reconnect Only
Expiration Date 10/_0(
c. Temporary Services or Feeders
constr Contr. Number /O'Z "S I b Installation, Alteration or Relocation
/0/1'1
D. Branch Circuits
$ 50.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
$ 40.00
$ 55.00
$ 80.00
see "B"
above
.'
New, Alteration or Extension Per Panel
One Circuit
Each Additional
Circuit or with Service
or Feeder Permit
$ 35.00
$ 2.00
E. Miscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation $ 40.00
Sign/Outline Lighting $ 40.00
Limited Energy/Res $ 20.00
Limited Energy/comm $ 36.00
5. SUBTOTAL OF ABOVE H~ pO
5% State Surcharge ') ~
3% Administrative Fee ~: .
TOTAL ISCP. (~ )