HomeMy WebLinkAboutBuilding Miscellaneous 1982-3-16
Department of
. , '- Pi:' /,~ ,Iii PCuHy.5 t'-"c~vul,.:.:.FO
(It FLOODPLAIN HArl~~E~ErH ('1
Environmental Management/125 East 8th Ave., Eugene, Oregon
687-4357
By H lb
Date
To:
'S - I&> -82-
~ Permit Processing
o Planning
o Pub1 ic Works
Applicant Name -DJ>..\1 II,;)
Address of site I \ t n
SFD AG
Permit No.
773,80
Partition No.
Subdivision No.
.&:.'OD"'\<O L0~~:X::
DEL- pr=e Dg .
(M.]) ADD. COMM.
o
~
[gJ
o
o
Approximate flood hazard study area, extra precautions may be appropriate to
assure that the building site will bB reasonably safe from flooding.
Detail flood hazard study area. Data Source
Mobile homB tie downs required.
Substantial improvement. /
Site in rBgu1atory f100dway chakne1, building prohibitBd unless it is demonstratBd
that the cumulative effect of proposed devB10pmBnt will not incrBase the basB
flood at any point. Contact Floodplain Management for more information.
a..u<<:..
BASE FLOOD ELEVATION + l' = ~~"7.~q I (MSL). Certification at or above
this elevation required as checked below.
OTHER
~
o
~*****************************************************************************************************
- .
~
CERTIFICATION OF ELEVATION
I, MARVuV S. kll vS # , a Registered Professional
L.A ^' D StJ/l. vIS '41'JR- in the State of Oregon, do hereby
certify to Lane County, th~t the following e1Bvation represents a survey
made by me or under my supervision.
ThB foundation elevation (including basement slab) =
The ground elevation that structure will be placed on = 44~ ff;-
The first floor elevation = 44K ~ I (MSL).
The elevation of the top of f1oodproofing =
Other
~
~
3:
'"
'0
-...l
o
D5I
~
o
o
I
'(r~SL). \)
\)J
, (~lSL). .
N
\}l
I (MSL).
RBference Bench Mark No. RR. ~P//.J!,E P{}/..E -dJ3~/-F'-E" 4~/.S6
Location /f?E 5'ov7'"'#, /tJ~ WG'S"- of THE CI1'Nre,eL,A/E
,
n,t:" J/;4.,nEAI B/l.lhc..E J?bAD 6l' //APuESr /aAlE 1I.a1'I-J. sr.')
. .
-f
Signature
Date
01~ -1.
3-/7- Rz..
}/~
/
SEAL
r
;
"
REG I STERE 0
PROFESSIONAL
LAND SURVEYOR
--r>\
I\IC c
Bel>
Original to be certified and returned
Floodplain Management
1st copy with application/inspection
2nd copy to applicant
3rd copy to Floodplain Management
to Lane County
~~..J.)~
- OREGON
JULY 14, 1978
MARVIN S. KRUSH
1643
,
/