HomeMy WebLinkAboutPermit Building 2005-12-29
.,
Status: Issued
225 Fifth Street, Springfield, OR
'. 541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
CITY OF SPRING~lELD .
Building/Combination Permit
PERMIT NO: COM2005-01154
ISSUED: 12/29/2005
APPLIED: 08/25/2005
EXPIRES: 06/29/2006
VALUE: $ 953,176.00
'.'h' SITE ADDRESS: 1190 Mohawk Blvd
; ASSESSOR'S PARCEL NO.: 1703253316400
Springfield TYPE OF
Site Work Only
TYPE OF USE: New
Commercial
PROJECT DESCRIPTION: Pacific Cascade Federal Credit Union
Owner: PACIFIC CASCADE FCU INC
Address: 1075 OAK ST
EUGENE OR 97401
Phone Number: 541-343-6238
I CONTRACTOR INFORMATION'
Contractor Type
Architect
General
Electrical
Mechanical
\, Plumbing
, # of Units:
Primary Occupancy Group:
Secondary Occupancy
Yrimary Construction Type
Secondary Construction
# of Bedrooms:
Contractor
ERIC HALL ARCHITECTS, INC.
MCKENZIE COMMERCIAL CONTRACTOR:45539 07/21/2007
SCOFIELD ELECTRJ..<fTENTION 38702 12/21/2007
COMFORT FLOW follow r : Oregon fawiMquires 06/27/2007
ROBINSON PLU~~~!~~~e~~~:;~r b;:r~~MnnnY'~~'~~, 07/13/2007
1r6'B61l9HN~_I(jN. are set forth
o ::IU. You may obt . ':'~II JAR 952-001_
callirltof~~~m: am copies of the rules blfot Size:
num~el~~~~f, ;:~ (Note:, ~he tel~f),Q~ne Sq Ft 1st Floor:
TmTl?t1l~at~,gOn Uttltty Noti1G.~~ion Sq Ft 2nd Floor:
Water '1"ype1800-332-2344). Gas Sq Ft Basement:
Range Type: Sq Ft Garage/Carport
Energy Path: Path 1 Sq Ft Other:
Sprinkled n/a Occupant Load:
License
Expiration Date
Phone
541-688-5594
541-343-7143
541-686-8612
541-726-0100 ~
541-345-6909
"
,
B
4,120
VB
I DEVELOPMENT INFORMATION I
Front yard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
',1
Overlay Dist:
# Street Trees
Paved Drive Rqd:
% of Lot Coverage:
REQUIRED PARKING
Total:
Handicapped:
Compact:
PUB IRE IF THE WORK
AUTHORlZED UNDER THIS mi&MllgT
COMMENCED OR IS ABANog_m~SlDrainS
ANY 110 DAY'iRlOD. .
. Street
Storm Sewer Available:
Special Instruction:
Notes:
.,.
1 of 6
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2005-01154
ISSUED: 12/29/2005
APPLIED: 08/25/2005
EXPIRES: 06/29/2006
VALUE: $ 953,176.00
I Valuation Description I
Description
Estimate
Estimate
Pavinl!:
Type of Construction
Estimate
Estimate
Use Bid Amount
$ Per Sq Ft
or multiplier
$1.00
$1.00
$1.00
Square Footage
or Bid Amount
120,000.00
781,546.00
51,630.00
Value
Date Calculated
Total Value of Project
$120,000.00
$781,546.00
$51,630.00
$953,176.00
08/30/2005
12/22/2005
12/22/2005
~
Fee Description Amount Paid Date Paid Receipt Number
Plan Review CommlInd/Public $304.30 8/25/05 1200500000000001245
+ 10% Administrative Fee $93.37 9120/05 3200500000000000566
+ 7% State Surcharge $21.21 9/20/05 3200500000000000566
Addressing Assignment $31.00 9120/05 3200500000000000566
Backflow Device $28.00 9/20/05 3200500000000000566
Curbcut - Additional Driveway $80.00 9/20/05 3200500000000000566
Curbcut - Additional Driveway $80.00 9/20/05 3200500000000000566
Curbcut Permit $80.00 9/20/05 3200500000000000566
Curbcut Repair $40.00 9/20/05 3200500000000000566
Encroachment Permit $130.00 9/20/05 3200500000000000566
Fixture $56.00 9/20/05 3200500000000000566
Paving $630.65 9120/05 3200500000000000566
Plan Review Comm/Ind/Public $105.62 9/20/05 3200500000000000566
PW Disc - 2nd Permit (Street) $-30.00 9/20/05 3200500000000000566
PW Disc - 3rd Permit (Street) $-30.00 9/20/05 3200500000000000566
Sanitary Sewer - 1st 50 Feet $45.00 9/20/05 3200500000000000566
Sanitary Sewer Each Addtll00' $14.00 9/20/05 3200500000000000566
Sidewalk Permit + Addtl Sq Ftg $102.40 9/20/05 3200500000000000566
Storm Sewer - 1st 50 Feet $45.00 9/20/05 3200500000000000566
Storm Sewer Each Addtll00' $70.00 9/20/05 3200500000000000566
Water Line - 1st 50 Feet $45.00 9/20/05 3200500000000000566
+ 10% Administrative Fee $5.00 10/21/05 1200500000000001581
+ 7% State Surcharge $3.50 10/21/05 1200500000000001581
Temp Power 200 amps or less $50.00 10/21/05 1200500000000001581
Plan Review CommlIndlPublic $1,461.95 11/21/05 1200500000000001737
Plan Review Fire & Life Safety $899.66 11/21/05 1200500000000001737
-Mechanical Issuance Fee- $10.00 12/29/05 1200500000000001867
+ 10% Administrative Fee $336.66 12/29/05 1200500000000001867
+ 7% State Surcharge $209.17 12/29/05 1200500000000001867
Air Handling Unit Up to 10,000 $16.00 12/29/05 1200500000000001867
Building Permit $2,782.15 12/29/05 1200500000000001867
Fixture $126.00 12/29/05 1200500000000001867
Furnace - up to 100,000 btu $12.00 12/29/05 1200500000000001867
Gas Outlets 1-4 $4.00 12/29/05 1200500000000001867
2 of 6
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Heat Pump
Paving
Plan Review CommlIndlPublic
Plan Review Fire & Life Safety
Vent Fan
Total Amount
$24.00
$378.45
$299.88
$436.80
$24.00
$9,020.77
I Plan Reviews I
Fire Department Review
11/23/2005
Fire Department Review
08/26/2005
Initial Review
Initial Review
LDAP Review
LDAP Review
08/2612005
11/22/2005
09/13/2005
09/27/2005
LDAP Review
09/28/2005
Planninl! Review
11/23/2005
Planninl! Review
Public Works Review
08/26/2005
08/2612005
Public Works Review
11/23/2005
Structural Review
11/22/2005
Structural Review
12/22/2005
12/05/2005
09/01/2005
08/26/2005
11/22/2005
09/28/2005
11/28/2005
08/31/2005
09/28/2005
12/21/2005
12/02/2005
12/22/2005
OK
OK
APP
APP
10
APP
APP
APP
WI
APP
WE
10
3 of 6
CITYOFSPRING111~LD .
Building/Combination Permit
PERMIT NO: COM2005-01154
ISSUED: 12/29/2005
APPLIED: 08/25/2005
EXPIRES: 06/29/2006
VALUE: $ 953,176.00
12/29/05
12/29/05
12/29/05
12/29/05
12/29/05
GRG
GRG
LLH
LLH
VRJ
VRJ
EMM
EMM
SB
SB
JMP
JMP
1200500000000001867
1200500000000001867
1200500000000001867
1200500000000001867
1200500000000001867
See attached fire department plan
review comments
Plans Review: Site work.
COM2005-01154. Refer to DRC
comments for site plan review.
Building and Site Improvements
LDAP submitted 9/22/05 and is
under review.
LDAP is at the front counter and
ready to issue. $1620.00 is due at
issuance and applicant has been
notified.
To be built per approved Final Site
Plan.
Site Work only. Curbcuts,
sidewalks, and encroachment permH
fees added. Submit Encroachment
Permit Application 2-3 days prior to
requirement to work in
Right-of-way or within PUE. LDAP
Required. Applicant notified
9/13/05. DO not issue until LDAP
issued. LDAP at counter ready to
issue.
SDCs added for structure. NOTE:
Less fixtures than Subway + Gas
Station. Less trips than Subway +
Gas Station. Less Sewer Load than
Subway + Gas Station. No SDCs.
Curbcuts and sidewalks already
charged. LDAP already issued.
See attached documents for 7
structural comments faxed to Eric
Hall.
WI. Received Eric Hall's response
to structural comments. Faxed the
energy code forms to Jack Foster.
CITY OF SPRINGFIELD
Building/Combination Permit
Status: Issued PERMIT NO: COM2005-01154
225 Fifth Street, Springfield, OR ISSUED: 12/29/2005
541-726-3753 Phone APPLIED: 08/25/2005
541-726-3676 Fax EXPIRES: 06/29/2006
541-726-3769 Inspection Line VALUE: $ 953,176.00
Structural Review 12/27/2005 12/27/2005 APP JMP Received final internal approval.
Structural Review 08/26/2005 08/29/2005 WE JMP See attached documents for 2
structural comments faxed to Eric
Hall.
Structural Review 08/30/2005 08/30/2005 10 JMP WE. Received phone call from Tod~
at McKenzie Commercial saying
that he will get the Special
Inspection Forms completed and to
me soon. He said there will be no
site lighting at this time and that the
site work does not include any
paving at this time.
Structural Review 09/02/2005 09/02/2005 10 JMP WI. Received Addendum #1
addressing structural comments
with the special inspection forms.
Structural Review 09/13/2005 09/1312005 APP JMP Received final internal approval.
SUB Review 08/26/2005 09/06/2005 APP JF No energy code issues or inspections,
SUB Review 12/27/2005 12/27/2005 APP JF
SUB Review 11/23/2005 12/13/2005 WE JF JMP called Eric Hall to request the
building envelope forms and
worksheets.
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
work day.
Site Inspection: To be made after excavation but prior to setting forms.
Erosion/Grading Inspection: Prior to ground disturbance and after erosion measures are installed.
Roof Sheathing/Nailing: Before covering sheathing with finish material.
Glu-Lam Beams: Inspection Certificate by an approved agency to be provided to City Building Inspector prior to
placement.
Ceiling Grid: After drywall approval but prior to cover.
Hold Downs Installed: Special Inspection performed prior to placement of concrete. Provide report to City
Building Inspector.
Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test
results to City Building Inspector.
Structural Masonry: To be done during construction by a State Certified Special Inspector. Provide results to
City Building Inspector.
Final Fire Department. After all requirements of the Fire Department have been met.
Final Building: After all required inspections have been requested and approved and the building is complete.
Rough Plumbing: Prior to cover and including required testing.
Final Plumbing: When all plumbing work is complete.
4 of 6
_""AI~"~"'LO jiII.. --..... . .... .t......
,WtL.,.,--- "IbL.. i
.'
. ......-,.. ".""'..,...'--- .' ~" .,'.- '
CITY OF SPRINGFIELD '
Building/Combination Permit
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
PERMIT NO: COM2005-01154
ISSUED: 12/29/2005
APPLIED: 08/25/2005
EXPIRES: 06/29/2006
VALUE: $ 953,176.00
Rough Gas: After line is installed and required testing and capped if not attached to an appliance.
Rough Mechanical: Prior to Cover
Final Gas: When all gas work is complete.
Final Mechanical: When all mechanical work is complete.
Rough Electric: Prior to Cover
Final Electric: When all electrical work is complete.
SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection.
SUB Final: After all required energy inspections have been requested and approved.
SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover.
SUB Ceiling Grid: Interior Lighting
SUB Exterior Lighting
Rough Grading: After gravel is in place but prior to placing concrete.
Final Paving: After paving is complete.
Rough Plumbing: Prior to cover and including required testing.
Water Line: Prior to filling trench and including required testing.
Sanitary Sewer Line: Prior to filling trench and including required testing.
Storm Sewer Line: Prior to filling trench.
Final Plumbing: When all plumbing work is complete.
Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection.
Curbcut - Close & Repair: After forms are erected but prior to placement of concrete.
Sidewalk - Setback: After forms are erected but prior to placement of concrete.
Curbcut - Standard: After forms are erected but prior to placement of concrete.
Curbcut - Second: After forms are erected but prior to placement of concrete.
Curbcut - Overwidth: After forms are erected but prior to placement of concrete.
Temporary Electric: Approval required prior to Utility Company energizing pole.
Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or
foundation inspection.
Footing: After trenches are excavated.
Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in
place but prior to concrete.
Shear Wall Nailing: Before covering sheathing with finish materials.
Framing Inspection: Prior to cover and after all rough in inspections have been approved.
Wall Insulation: Prior to cover.
Ceiling Insulation: Prior to cover.
5 of 6
_':-S..~"",,,.I.m.D ~.. .............'.. ." .1..,'
.WIr'. ,." ,~Ii-...... ,
'," I
,
, ,
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
CITY OF SPRING~lELD I
Building/Combination Permit
PERMIT NO: COM2005-01154
ISSUED: 12/29/2005
APPLIED: 08/25/2005
EXPIRES: 06/2912006
VALUE: $ 953,176.00
Roofing: Prior to installing any roof covering.
Masonry:
Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to
City Building Inspector.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein,
and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division,
: Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used
on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from
the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site
at.al~~mes durin{fn~.. ruction.
<' r--~h \--.'\V(?/I-. I ~ ..~9...0 ~
Owner 0; Con;actors Signatu.Q Date
6 of 6
225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
S~:G.,;D ~.. ..
WiL. .
;y of Springfield Official Receipt
uevelopment Services Department
Public Works Department
Job/Journal Number
COM2005-01154
COM2005-01154
COM2005-01154
COM2005-01154
COM2005-01154
" COM2005-01154
COM2005-01154
C:OM2005-01154
COM2005-01154
C9M2005-01154
Cl2>M2005-01154
COM2005-01154
COM2005-01154
Payments:
Type of Payment
Check
:1.
~ I
I :L
:1
:\
.~
:\
:i
"
."-
A
:~
".'.,
12/29/2005
RECEIPT #:
1200500000000001867
Date: 12/29/2005
Description
Furnace - up to 100,000 btu
Air Handling Unit Up to 10,000
Vent Fan
Gas Outlets 1-4
Heat Pump
-Mechanical Issuance Fee-
Fixture
Paving
Building Permit
Plan Review Comm/Ind/Public
Plan Review Fire & Life Safety
+ 7% State Surcharge
+ 10% Administrative Fee
Paid By
PACIFIC CASCADE FCU
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
djb 180720 In Person
Payment Total:
I of I
10:46:04AM
Amount Due
12.00
16.00
24.00
4.00
24.00
10.00
126.00
378.45
2,782.15
299.88
436.80
209.17
336.66
$4,659.11
Amount Paid
$4,659.11
$4,659.11
~itY orSpri"~fi~ld
Comrr.tl~:~~ S'i~..f!!:~~ Di~~::c,;1
225 .Fifth S,reet .
Springfield. OR 97471
.Teleptlone: (541) 126-3!S9
Frix: (54J) 72~~3689 _
Special Inspection And Testing
, .: ' . ~ :. ';. , .' .
To appficants of' proje~ls requidf1lg ;~peci~l i~-spdctiQn bT lj::sti,ng as per Sc.ction i 7Q L5 of Ihl: Ofegon StiuclVril Special\)' Co~e~ P'e~3e re,!,iewJ~e lnformati<;ln bel~w; When
y~u,
~ave fiJ1i3fu:t:(, ackn~wledge an ~nders,andin~ of t~~ inro~aliol1 by s!gning belo",. and retUrn 'this fqrnl 10 the City. '.':.::': ' :
~EtOftE ArERI\"~rr C~N, B~ ISSl./ED: Th~ o~ner of own~r'srel1re:ienlative.on till~ advi~e dftqe resp,onsible projeci Ef'!gineer ot Afc~hect, shall compl~te, sign, and $u~mh
t~ the q:it}i fQt review al1dapl>rOiyallni~ rorm' compJeled C!n bOI~ In,e front a~d ba,*. : ,':' .. ...:. . " ,: :
The O'fner alld Geqeral Contractor, where applicable; slt1l1J 81541 ackn!Jwled~e the following cC?rLdiliQns applicab~e to Spe~ial Inspection tlndlorTeSling.
: ',' . ::', I ; ." .,: .' : .:';:' '.:, ..
\, Cl:!n ltac!or h responsible fpr profer no,i~catj~11 forthe h\$peclion br Testin, of il~m$lis~ed. .' '
2. Te~lil1g laboratory s~..11 ta~e appropriale sample~ ll~d lranspon ~hem (~their: laborato~ for prqper evah.iatipn or ~esiin~.
· ~o~ie~ or illlla~o~toty r~POrls and insp~clipns are tri bese~1 !O lhe Gity by the res,ling Agency. , ' .
3. Sp~ciit II~sriecl ion A~crlC)' is to spblnit names ahd ~uaHfi~alion, of' o~.sile ~peda! [nspectcirs ~o the CitY rqr ~PPfo"a\.
4. Sp~ci~1 J~lspec~orSh~1I pro,!,ide in~p~cci~n ~eport$IOlhd' b~ilding omcirl of ~'I ihsp:ecrioo. adiv~tieS. ' _. .
5. Ct>nlr'aclof i~ r~ponsible tc? revicY>' the PLY lIpprbvC!d plans rbr ~dditiol"al in~pet:li~n 6r t~slingrequiremenu that inay be nOled.
BEF91~ A CERTI~lqA TEOF PCC~PAN~YWlL~ BE ISSlJ'E~: 1hd S;.:dtlllnspec~ion Ase~cysball ~ubmi! t~ th~ B~ilding Qffi~ia[ a $latemennMt a!1 items r~quirihg i
il1sp~c!i~n have tiee~ MfiI!ed, an~ repo~e~ af'!d ""ere tQ th~ best ofthein~,pectOi"5 k:nQVfI~d8e. in conformaJ)ce with ~he :apPl'ove~ plans. specjfic~lions an.d applica~le workinan$~ip
provisio'ns. Thos~ items nOlteSled ahdlbr Inspected shall ~e rlote'~ H. the 9tatemtnt.' The repOrt is II> be submitted to the qty prior no' a request for f..r, al inspe~li6i1s: .
" , .' "
ACKl'lOWLRDGMENTS
R::; ',i! '
. ~. . II ',.
; ~~J<3 '.;"'j'.;iUl-VV'( S
, . ~~\-..v '_ 'e_,,--..;...' .....
OWf\~r Name (Printed)
~):, : i :
~~~~i!t~~~a~i~~Jt:~;...J~L
~~1'l~:tii~C;ih ~if ,~krilt~i.ovgaifirm ;frirtl<<lij
1\:.l1';lll~'''~'''''_~r,lI' . ' :
rr=:f': ,~~ '" .:,.-"
-1t;:J:- .b:li"f~JJ~#~~h1~f
'rtJ,.~ \..8;;15Ii<l'~'7 Nl~ tl'rl'fllliA) .
,
C,oMZ.~4~ ~~{t9t 1~/(dd
:BuildiIlg Pc'm.il II ' " .' :.' "D~~', ,
t'Av(Ft6 tA~DJ:!. .'"
fl:-pe~Al.o qC:',EP\T u~ION f/t()AAWK lktEN.le,\1NIAt.~-
:Jroject . ~.:~~~
111t?'Mt'H-AWK
, !
ProJed A~dress
. I
jJl)-i/~
, ,Owher SignatlJre
lIIl'
"~:? ~:\;.<~! ~\ ~; (, , /
rYJ' L- r", '. . . '>1...... t"~"h. \ \),1 }r"v
It Cn<:,I\z" ~,l,,',-('\(n,.t.. i Ii; i Ct,,-, J-f~1 (./;:';'-): :,c'f<..A....,~;~"f,., (/'
G1;::-c~hU~doi firm Nar:\~ (l'rihted) .' Gener~l CO~lrt,cicir Sigl\atJre
J!r~:I~J~~lli ~;~J:N:~f~
Sj1l~llj~(~ " . : M~IJ1.
~ ~-
'-....,\ ~,~~ ~ 'X~/~ \ '
. BUTianrg V((lchirmm~ (Printed):
_fJr-t/J~r-'_'~.'- "
'feumg l~lt#~ s~tlUli"XJ:
'X\, '- _
J~uild!Ji!'offici~l. Signature
t V(ailfOiced~, CUJti~; GrNl mti Midon';
1'.Q.iwtlie.J · ~NGT<UC ' : fl .~
1 '1 . I
'. '. ,t( .
: I,
I.: . ~ .
i.
, .
, ,
.1
-f
.... ...."';
: f-: .
Jl.'t~~ft~l..,r*~CtJ:.c)"d~: . .'
: :. ~~.!~ r Posr.!~ t: trt'-:r~ I
I L - r
I
!
'- :r
, . \
Cfa.Ut..
1-
j':
I
! -
\.. - ,
) ~M.f)!'E (.~m~1;.;
, L.~f~~
. to~ v~f~ lireii
tuioriNc;:: , ,;
.:', .: ljn~l~ilIl1 ~l.Illl~iqjOrn..Valoe"
:- .' ~ T4::sf 1~S't.tini .
'.
"
, ., .' ,.
, !. "
sP!k1AiL. ~tcrI~~ ~T&STHNG ~RE~
~ .' . -. : > . . . . .
'~Ufe reu o.r~ p~c .
':RefM:i1(;~Tlhl' . . . :
.~ :)~:\V..i.!t.Ii.m&I1t.crCct1.~:
(l~Ii.1>~=l?eal :. "
Cosi~~~b r1&OllM1Pm:" - .
..__ '-'<....:..i;i,.,...j '..It ,J ,.,
~l''-:J~...... ~. ' '.'.'
"~'C~~kS' .....-
. ~rie~ ~kil~~) ,
: com;,.eg~ Test"
-:G~P~E.x~A1;AtJdN.~~ :
:}/ . ~~IC ~f.I," 1~ ~bJO: IPS:
. ? '-"" iiliabl db fuw ~ --r, -
, ' ..".p Filii ~teanCnI .iDJIi;-.;~" ,~;..",.....lS
\A'" Sol I Duisiti .:: ' .
.' ,
I.. ! I
ST.atJa""~:~Tk~i .: .
~ ~S:it~l~~~r~:
lJlIuai- -'- ' - 0 _' $llbp . 'fidd
u.:_....S:lrm~. :. Sa.'"", .: F~
o'5P , . G_ ~Ir,' '.
~ A12S' . - N X'_F
I M'w, N :( ~F
~1'~\ ~ ~dmt: L!1.~ . "
J\Ci.~ Sit2J 'fi1~ciisi.8 i:uPeclioo
~~D. .sIIiEII~1 :c~Dciui: ~
Me Ill. h~ld~ilIl1~. K:iii:lC. :
CoII~ iJ~a1 wcl~f ~spe~
MI1Ip~IIl:fim~~ r~ :
SlI~~W(jGg:
. : Shw- \-OiJ1 Dai.:lilllfi: ~ \i.olii
~r ~a1I mf:WJ.lI . -'.
~: ~~~~:~~ :TIC psi
$i.n\plcUlj tell ~t& :
~brii:1I.4lJOwt'~g or- .sticel ~~~
:A~'\lr.eg"e l~
-ae.~ci;nt Te!lS '
Tu'd>cir. Ten., ,.
Mil( ~;... .
. Rnl~lai ~i\.eal
: la5ts1:fll~ ~ .
Can~1e 8ilt1:bioi>;:
Can~e,Pia~~ ~
. 1c.'lfQlilliolJdiJIsliuljo-Q,
,!'~~tS. .
. ..U~"S~ :
C~~G T,.su"
~PBO$~~: ~ 1
:~'nIi.!w-~
"~~~
't~~i ~~
~NJIY; - .' .
_~. ~. ~e;GI,lrisp. tC~ sntlSs~ ~..~ r~ l..~ f. 'g
~ ~~~~li(aia{~~W\~pru~)
: ~. t6$.elf_eatl~(l:Qoileu. glQW. fi~ waJ1 prisri-s) .-
~'- )~~m~"t i~~ll.(,r~sl ~.I1:iIJl.ki~E~e~ I .
~ .&..~~r.~.Willih.llilIO~~~&~~~lfir.:alts
.'
kjoo.~Of~DWtI.'C1rt~WJ, GlmR l'E~J eft ~~PIE~S;
D&t;:
. i
i j '. . ; . .
FDml CDn1pI~d trr--'
. _ I.
I : "j ; I . ~ : ;
f~oyw& siiucN~ Ri;Q~ u'i ABQn&drQR~~ dK Co..\nu.&rDotu~n D,dcAdJ~ Of VALVa .-
.. '1 . . _
ATI ACHMENT A
CITY 01 .NGFIELD SYSTEMS DEVELOPMENT CHARGE"
JOURNAL OR JOB NUMBER C0M2005-0 1154
NAME OR COMPANY: Pacific Cascade Federal Credit Union
LOCATION: 1190 Mohawk Blvd
MAP & TAX LOT NUMBER: 1703 25 33 16400
DEVELOPMENT TYPE: Site Work for new Credit Union
NEW DEVELOPED AREA (S.F.): 4,132.00
4.00
1,150.00
17,203
EXISTING DEVELOPED AREA (S.F.):
TOTAL IMPERVIOUS SURFACE (S.F.):
1. STORM DRAINAGE
ITE:
1000
ITE:
LOT SIZE (S.F.):
IMPERVIOUS SQ. FT.
(2,665)
Minus 24,000 s.C. existing impervious
x
$ 0.323 PER SF
TOTAL STORM DRAINAGE SDC:
x $ 19.07 PER DFU
$ 44.14
TOTAL LOCAL WASTEWATER SDC:' $
Approved Traffic Study alleges 99.11 trips per day per 1000 s.f.
2 SANITARY SEWER-CITY
A REIMBURSEMENT COST:
NUMBER OF DFU's
B. IMPROVEMENT COST:
NUMBER OF DFU's
(SEE REVERSE SIDE)
-6
-6
3. TRANSPORTATION
x $ 25.07 PER DFU
.SHEET
912
944
933
26400
BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
4.13 x 99.11 x $ 19.09 PER TRlP x NTF $7,816.52 1
B. IMPROVEMENT COST:
4.13 x 99.11 x $ 84.19 PER TRIP x NTF $34,478.09 1
EXISTING $ 103.28
A. REIMBURSEMENT COST:
-4.00 x 168.56 x $ 19.09 PER TRlP x 0.5 NTF ($6,434.58)1
B. IMPROVEMENT COST:
-4.00 x 168.56 x $ 84.19 PER TRlP x 0.5 NTF ($28,382.46) 1
EXISTING $ 103.28
A. REIMBURSEMENT COST:
-1.15 x 151.2 x $ 19.09 PER TRIP x 0.5 NTF ($1,659.42)1
B. IMPROVEMENT COST:
-1.15 x 151.2 x $ 84.19 PER TRIP x 0.5 NTF ($7,319.56)1
Credits due for Gas Station and SUBWAY
Hold for second Building Permit
4. SANITARY SEWER - MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 4.13
B. IMPROVEMENT COST:
NUMBER OF FEU's 4.13
EXISTING:
A. REIMBURSEMENT COST:
NUMBER OF FEU's -1.00
B. IMPROVEMENT COST:
NUMBER OF FEU's -1.00
EXISTING:
A. REIMBURSEMENT COST:
NUMBER OF FEU's -1.15
B. IMPROVEMENT COST:
NUMBER OF FEU's -1.15
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
COM2005-Q1154,PCFCU, 1190 Mohawk.xls
TOTAL TRANSPORTATION REIMBURSEMENT SDC:
TOTAL TRANSPORTATION IMPROVEMENT SDC:
TOTAL TRANSPORTATION SDC:I
$0.00 I
x $51.56 PER FEU $213.06 1
x $543.91 PER FEU $2,247.43 1
x $84.38 PER FEU ($84.38)1
X $890.D3 PER FEU ($890.03)1
X $856.69 PER FEU ($985.19)1
X $7,471.08 PER FEU ($8,591.74)1
$0.00
TOTAL MWMC REIMBURSEMENT FEE: ($856.51)
TOTAL MWMC IMPROVEMENT FEE: ($7,234.35)
MWMC ADMINISTRATIVE FEE: $0.00
: 3:
5. ADMTNISTRA TIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE)
steveli\- W. "B-eClIA.t;\r-tj "B-Clr-III-eS
SDC COORDINATOR
COM2005-0 1154, PCFCU, 1190 Mohawk.xls
TOTAL MWMC SDC:'
$0.00 I
$0.00 I
SUBTOTAL (ADD ITEMS 1,2,3, & 4)
$
12/20/2005
DATE
x 5% , $0.00
TOTAL TRANSPORTATION ADMINISTRATION FEE: $
TOTAL SEWER ADMINISTRATION FEE: $
TOTAL SDC CHARGES
$0.00 I
1 JULY 2004
DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE
NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = DRAINAGE FIXTURE UNITS
(NOTE: FOR REMODELS, CALCULA TE ONLY THE NET AuUIIIONAL FlXTURES)
Pacific Cascade Federal Credit Union
FIXTURE lYPE
BATHTUB
DRINKING FOUNT AlN
FLOOR DRAIN
INTERCEPTORS FOR GREASE/OIUSOLIDS/ETC.
INTERCEPTORS FOR SANDI AUTO W ASH/ETC.
LAUNDRY TUB
CLOTHES WASHER/MOP SINK
CLOTHES WASHER - 3 OR MORE (EA)
MOBILE HOME PARK TRAP (I PER TRAILER)
RECEPTOR FOR REFRlGERA TORJW A TER ST A T10N/ETC.
RECEPTOR FOR COMMERCIAL SINKJ DISHW ASHER/ETC.
SHOWER, SINGLE STALL
SHOWER, GANG (NUMBER OF HEADS)
SINK: COMMERCIAL, RESIDENTIAL KITCHEN
SINK: COMMERCIAL BAR
SINK: WASH BASIN/DOUBLE LAVATORY
SINK: SINGLELAVATORY/RESIDENTIALBAR
URINAL, STALUWALL
TOILET, PUBLIC INSTALLATION
TOILET, PRNATE INSTALLATION
MISCELLANEOUS:
NUMBER OF EDU'S*
FIXTURES
NEW OLD
UNIT
EQUIVALENT
3
1
3
3
6
2
3
6
12
1
3
2
2
3
2
2
1
5
6
3
5
2 2
2 2
TOTAL DRAINAGE FIXTURE UNITS=
'EDU (Equivalent Dwelling Unit) is a discharge equivalent to a single family dwelling (20 DFU) set at 167 gallons per day
DRAINAGE
FIXTURE
UNITS
o
o
-12
o
o
o
3
o
o
o
3
o
o
o
o
o
o
o
o
o
o
o
o
-6
CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARATEL Y
YEAR
ANNEXED
1979 or before
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
RATE PER $1,000
ASSESSED VALUE
$5.29
$5.19
$5.12
$4.98
$4.80
$4.63
$4.40
$4.07
$3.67
$3.22
$2.73
$2.25
$1.80
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE
IMPROVEMENT (IF AFTER ANNEXATION DATE)
COM2005-01154, PCFCU, 1190 Mohawk.xls
YEAR
ANNEXED
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
RATE PER $1,000
ASSESSED VALUE
x
X
CREDIT TOTAL
$0.00
$0.00
$0.00
1 JULY 2004