Loading...
HomeMy WebLinkAboutPermit Miscellaneous 1986-5-27 . . SETIl,\CKS A~D OTHER CO:>OITIO:;5 OF APPROVAL MUST BE STRICTLY OBSERVED. VIOLATION CA:.l RESULT IN REVQ_ C;"7IO:-J OF 'iHIS t'ERMIT, CITAnO:l U~D~R PROVISID:.lS Or- LANE cou::n"s INfR-;.CTI0N QRDI::....NCE, AND/OR OTHER REMEDIES ALLOWED BY LAW. . WHEN READY FOR I:-JSPECTION, CAL!. 687-4065. A MININU)! OF AT LEAST 24 "OU~S t\DVA1,CE :NOTICE FOR INSPEC- TI0:; KcQ~~STS ~U~T BE GIVEN. Have the 10110wiog information ready: permit nu~ber, job address, type of inspection, when it will be ready. your name and phone number, and any special directions to si"te. BUILDING DIVISION: REQUIRED I~SPECTIONS: 1. Foundation Inspection: To be made after trenches are excavated and forms erected and when all rnaterla~s lor the loundation are delivered on the job. Where concrete from a central mixing plant (commonly termed ~transit mixed~) is to be used, materials need not be on the job. 2. Concrete Slab or Under-Floor Inspection: To be made after all in-slab or under-floor building serV1~e equIpment, conault, ~lp1ng accessories, and other ancillary equipment items are in place but before,any concrete is poured or floor sheathing installed, including the subfloor. ~raming & Insulation Inspections: To be made after the roof, all framing, fire blocking, and raC1ng are 1n p1ace ~ a11 pipes, fireplaces, chimneys, and vents are complete and all rough electrical and plumbing are approved. All wall insulation and vapor barrier are in place. 3. 4. Lath and/or Gypsum Board Inspection: To be made after all lathing and gypsum board, ;.nterior ana-extcrIOr, IS 1n place but before any plastering is applied and before gypsum board joints and fasteners are taped and finished. 5. Final Inspection: To be made-after the building.is co~plete and before~occ~pancy. APPROVAL REQUIRED. No work shall be done on any part of the building or structure beyond the point indicated in each successive inspection without first obtaining the approval of the building official. Such approval shall be given only after an inspection shall have- been made of each successive step in the construction as indicated by each of the inspections required. NOTE: All building permits require inspections for the work authorized, such as but not limit~d to: A. Block Wall: To be made after reinforcing is in place, but before any grout is poured. This InSpectIOn is required for each bond beam pour. There will be no approval until the plumbing and electrical inspections have been made and approved. B. Wood Stove: To be made after completion of masonry (if applicable) and when installation is compl~ Installation shall be in accordance with an approved, nationally recognized testing agency and the manufacturer's installation instructions. C. Mobile Home: An inspection is required after the mobile home is connected to an approved sewer-or septic system for setback requirements, blocking, footing connection, tiedowns, skirting, and plumbing connections. 1. Footings and piers to comply with State foundation requirements for mobile homes or as recommended by the manufacturer. 2. Mobile home minimu~ finish floor elevation shall be certified when required by a flood- plain management letter. 3. Nobile home ticdowns, when required, and skirting shall be installed and ready for inspec- tion within at least 30 days after occupancy. Tiedowns and skirting shall be installed per enclosure. D. swimmin9 Pool: Below grade when steel is in place and before concrete is poured. Above grade woen pool-r&-installed. APPROVED PLA~S MUST BE ON THE JOB SITE AT ALL TIMES DURI~G WORKING HOURS. THIS PERMIT WILL EXPIRE If WORK DOES NOT BEGIN WITHIN 180 DAYS, OR If WORK IS SUSPENDED OR ABANDONED FOR MORE THAN 180 DAYS. SUSPENSION OR REVOCATION I1AY OCCUR IF THIS PERMIT WAS ISSUED ON THE BASIS OF INCOMPLETE OR ERRONEOUS INFORMATION. ANYONE PROCEEDING PAST THE POI liT or REQUIRED INSPECTIONS WILL DO SO AT THEIR OWN RISK. SUBSURfACE ~ ALTERNATIVE ~ DISPOSAL SYSTEMS: 1. Permits shall be effective for one year from the date of issuance. 2. Upon completing the construction for which a permit has been issued, the permit holder shall notify the Lane County Depnrtment of Planning and community Development by submitting the installation record form. The Department shall inspect the construction to determine if it complies with the rules contained in this division. If the construction does comply with such rules, the Department shall issue a certificate of satisfactory completion to the permit, holder. If the construction does not comply with such rules, the Department shall notify the permit holder and shall require satisfactory completion before issuing the certific~te. Failure to meet the requirements for satisfactory completion within a reasonable time constitutes a vio- la:ion of ORS 454.605 to 454.745 anu this rule. Setbacks - Subsurface From: Sewage Disoosal Septic ~ 10' 10' 5' 50" Drainfield 10' 10' 10' 100' Interior property lines Edge of road riqht-of-way Buildinq foundation Wells, other water sources . ".