Loading...
HomeMy WebLinkAboutMiscellaneous Correspondence 2010-8-13 Devco ~', ~'b2~ G.Mo.uA~ ~-za..6-0\r::JB/l- engin,eering inc. o 245 NE Conifer P.O. Box 1211 Corvallis, OR 97339 (541) 757-8991 Fax: (541) 757-9885 August 13, 2010 Mr. Bryan Richardson Electrical Inspector Springfield Community Services Division City of Springfield 225 Fifth Street Springfield OR 97477 SUBJECT: Hilton Garden Inn - Electrical Drawings Supplemental Information Dear Mr. Richardson:. Please incorporate the following revisions, additions, and/or clarifications to the plan set dated 4 August 2010. 1. Panels "2A", "2B", "3A", and "3B" are to be located in the south east wing, not the north end room as indicated. 2. Panel "1 P" is to be located in the Electrical Room, adjacent to Panel "1 H". 3. The feeder from the generator and the MDP Breaker "E" to the transfer switch and from the transfer switch to Panel "E" is to be (1) 1" c., (3) #3 XHHW Cu., (1) #8 XHHW Cu. ground. 4. The ground conductor is to be removed from Feeder #1, per NEC 250. 142-(A)(1). We hope this is of assistance to you in resolving this issue. If you have any questions, please do not hesitate to call me. Sincerely, f~ d WelxA Patricia J. Weber, PE Electrical Engineer 10-502 brichardson 08-13-1 a.doc '. ,-," .,. ,.... '. ',' "' '., ;. ':., ," ;. ,.,,'