HomeMy WebLinkAboutPermit Building 1987-10-30 (4)
/
-4
Rece~pt 'I /0 'ISJ...
.. RESI.TIAL..
APPLICATION/PERMIT
225 North 5th Street
Springfield~ Oregon 97477
Building Division
726-3753 '
v
Job Location:
~ft;r;,o
ASGessors Map #
SPRINGFIELD
()~
(j
471
T= Lot #
.M:.v~ rA1/A/
- ~ . , -, ~ .
8't VL6= ~/J7e 0z;?-7e-.:;:-.
~~eMJ-,() /
Address: d r 0 tJJ t11J:h 1 T /-(
~fnVLfl) f)AOC1~
~ rf
Subdivision: / /Yr.5? ~ 7?L$ ~
OlJner:
City:
J
I "
NmJ
I Addi ticn
I I Remodel
fYl UobiZe Harne ,
,
,(o-{ q~y1,
Date of Applicaticn
Contractors
Jh E W"
Phone:
c
t!
Zip:
D?J;;JJ;-Me-rU mil
Se;:t- Vf
I /7; ff1~
Value II /I (J V
Address
Signed: ju
Date: lo-3o-t7
Lisc.#
Expires
Phone
General ~CLR. cI m f-/~'j-
Plwnbing - d~-S~
I, Electrical S:--1i.A t-e - I JA1. J
I Mechar.ical
I ,Construction Lender
It is the responsibility of the permit holder to see that aZl inspections are made at the' proper time, that each ~6SS is readabZe
f1'Om the street, and that the p61'1Trit cazod is located at the f1'07lt of the property.
"Building Dtvi::ior. approved plan s.haZZ remain on thE Building Sit8 at aZZ times.
PROCEDURE FOR INSPECTION REQPEST:CALL 726-3769 (recorder) state your City designated job number. job add:Joess. type of in3pec~icn
requested and when you will, be ready for inspection. Contractors or Owners name and phone number. Requests received before 7:00 am
wiZZ be made the same day. requests made after 7:00 am wiZZ be made the ne:r:t :x;rkiYI{J day.
, ',.,"'.'. ~1tJ 7q /
' 'Your C1-ty Des1-gr.ated Job Number II):
Reaui~ed TnSDp.cticns
D' SITE INSPECTION: To be made after
excavation. but prior to set up of
, ,forms.
O ' UNDERSLAB PLUMBING. ELECTRICAL &
, MECHANICAL: To be made before any
, work is aovered.
,.." .
fl7I POOTING & POUND,1TION: To be made
I6J after trenches are excavated and
" ,forms are erected. but prior to
pouring concrete.
Ix I' UNDERGROUND PLUMBING~ SEWER. W.1TER.
,DRAINAGE: To be made prior to fiZ-
,lir.g trenches.
0, UNDERFLOOR PLUMBING & MECHANICAL:
.. .' To be made prior to installation of
floor insulation or decking. ,_, , ,
D POST AND BEAM: To be made prior to
:; instaZZation of floor insulation or
, decking.
D ROUGH PLUMBING. ELECTRICAL & MECH-
, ANICAL: No work is to be covered
.,ur.tiZ these inspections have beer.
made and approved. '
I:~ FIREPLACE: Prior to placir.g facing
--.J materials and before framing inspec-
tion.
I-~ PRAMING: Must be requested after
D approval of rough plwnbing. electri-
,cal & mechaniaal. AZZ rOOfing
" bracing &' chimneys. eta. mU.st be
, .: completed. No work is to be con-
",,~,cealed untiZ this inspection has
~.been made and approved.
,.'.---- .
1::=1 PINAL PLUMBING
I =:J FINAL MECHANICAL
i
=:J FINAL ELECTRICAL
o
(2)
I INSULATION/VAPOR BARRIER INSPECTION:
---1 To be made after aZZ insulation ar.d
, ' required vapor barriers are in place
,.: ',but before any lath. gypsum board or
waU covering is applied. and before
.. ' --any insulation is concealed.
DEMOLITION OR ;'.JOVED BUILDINGS
~ Sanitary souer capped at p~opcr~~ line
~ Septic tank p~ed and fille~ with gra~eZ
O DRYWALL INSPECTION: To be made
after aZZ drywaZZ is in place.
but prior to any taping.
I Pinal - fl'hen above items are completed
---1 and when demolition is complete or struo-
ture moved and premises cleaned up.
O MASONRY: Steel location. bond
beams. grouting or verticals in
accordance with U.B.C. Section
2415.
D WOODSTOVE: After installation is
ccmpleted.
Mobile Homes
.... ~ Blocking and Set-up
_ ><1 Plwnbing connections -- sewer and Wa~el'
'\:71 Electrical Connection,- Blocking. set-up
~ and plumbing connections nr~st be approved
before requesting electrical inspec~ion
D
CURB & APPROACH APRON: After forms
are created but prior to pouring
conarete.
D SIDEWALK & DRIVEWAY: POI' aZZ con-
, crete paving within street right-
.of-way. to be made after aZZ exca-
vating complete & form work & sub-
, base material in place.
.Xl Accesso1"d Building
'gfPinal - Aftar porches.
etc. are completed.
"
skirting. decks.
D
PENCE: r.'hen complete Provide--
gates or movable sections through
P.U.E.
~
o
All project conditions. I)uch as the installation of street trees. c~~letion of the
required landscaping. etc.. must be satisfied before the BUILDING PINAL can be requested.
PINAL BUILDING: The Final Building Inspection mUst be requeated af~er the Pinal Plumbing
Electrical. and Mechanical Inspections have been made and approved.
~ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE. ADJUST/reNT TO. BE ~MDE AT NO cost TO CITY Page 1 of 2
JOB No.~0 0 I)q (
I Zone: jYJ~/POZ/
Lot Sq. P'tg.
~ of lot Coverag~
# of Stories
Total Height
Topography
SOL A R A ~ C E S S R E Q.-
Occupancy G~t:..'~ if,c.{JE .pm
LOT TYPE Lot Paces -
I
I ITEM SQ. FTG I X
IMair/~h"~;-~~)
I Car~e '
I Carport ';;? 8$
I Accessorl/ ,'-::S- "2..;
I r~r/lYc;,.sf4cc~~S.
I TOTAL VAWE
I Ival.ueJ
S.D.C. 1.5 x
Building Permit
State Surcharge
Total Cha....ges
lITEM
I.FimtnW9S -#t?P/1~
Residential (1 bath) I
II
II
I
NO.
Sanitary Sewer
Water
Plumbing Perrr:i t
State Surcr.arge
Total Charqes
ITEM
NO.
Res. Sa. fta.
I New/Extend Circuits
I ~"P'.""':J Service
I ~/:f ~p
III
III
Eleatrical Permit
, ' State Suraha:rge
Total CharCjes
lITEM
NO.
Furnace ETU' S
E:z:haust Hood
Vent Pan
I floodstove
I
Permit Issuance
Meahanical Permit
State Surcha:rqe
Total Charaes
-- ENCROACHMENT --
Security Deposit
Storage
Maintenanae
Parmi t
Total Charges
PEE
FEE
FEE
Curbcut
I Sidewalk
I Penae
I Electrical Label
I Mobile Home ~z;'~ W IZJ:IC
I ~-?~
I
TOTAL AMOUNT DUE: ~
I
" I HAVE CAREPULLY EXAMINED the completed application for permit. and do
'I' hereby certify that, all information hereon is true and correct, and I
further certify that any ar.d aZZ work performed shaZZ be done in accor-
{dance with the Ordinances of the city of Springfield. and the L~~s of the
~ State of Oregon pertaining to the work described herein. and that NO OCCU-
PANCY wiZZ be made of any structure without permission of the Building Di-
vision. I further certify that only contractors ar.d e~ployees who are in
ca~pliance with ORB 701.05S will be used on this project
Interior
Corner
Panhandle
Cul-de-sac
Value
7~~""
I
I
/~.~l
&~~1.
I /'7a ~
/?.-~ I
. fGJZ!> I
/9... 3~ I ~
CHARGE
~5;:0C>
:4:::? f -e>
/'5: --- c..-
I
I ~~r--t)
I -:2-~
,11Y2.-sc:> I ~
CHARGE I
I
I
I /5. c:rt:>
liS: .-&>
I 50r ~
/.$61
5/~ SO I ~
CHARCE I,
I
I
I
I
I
I
I
I
I
I
I
tl 27~..5/
~;s-:~f
/.?S- r
t'age G
Type/Cor.8t:
.
L -CO G~
Setbacks
P.L. House Carage Access.
North
East
South
West
Bedrooms:
Enerqy Sources
Heat
Water Heater
Range
Fireplace
Woodstove
TUDe
-- Fees
Building Val,ue & Permit
This permit is granted'on' the express condition that the' said construction
shall. in all respects. conform to the Ordinance adopted by the City of
Springfield. incZuding the Zoning Ordinance. regulating the construation
and use of buildings. and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordir~nces.
~
Plan Check Pee: I./. =:?~
Date Paid: I b/3b /b"l
Receipt #: ,16 </ C;;-L...-
I Signed: p ~
Plumbing Permit
No person shall construct. instalZ. aZter or change any new or existing
plumbing or drainage system in whoZe or in part. unless such person is the
legal possessor of a valid plumber's license. except that a person may do
plumbing work to property which is owned. leased or operated by the appli-
cant.
...'
Electrical Permit
Where State Law requires tr~t the electricaZ work be done by an Eleatrical
Contractor. the electrical portion of this permit shall not be valid until
the Zabel has been signed by the Electrical Contractor.
Mechanical Permit
~
a
p~ xaminer
~
/(:;?~2~~
uate
~