HomeMy WebLinkAboutPermit Building 1988-11-16
.. RESIDANTIAL"
APPLICA!'f!8N /PERMIT
225 North 5th Street
SpringfieldJ Oregon 97477
Building Division
726-3753
SPRINGFIELD
5 Co (1I0
/I /C?() ~(f if r (
bCL~
VT=
Job Location:
ABaes30rz Map
Subdivision:
Ol.mer:
City:
QCU\h~~ E,
sHoo D~
Address:
I
I
I
I
I_NP.1"
Addition
Remodel
,-.Iobi le Homa
\l- l~ ~~
Date of Application
ContI'actors
~{/?
Lot/l
fi; / (q
f
~~ .
Phone. CI Va .-~ 1cf(
1Uo !?7/
Zip:
Desc1"':be Iior/(:
--=}
Rece~pt !I
I ~ 777
vatuj4
SeD
Address.
Lisc.11
q)t~
Inl
Genera l
Plumbing
Electrical
Mechanic.::l
ConBtY'Uction
I ) r
L~S~ A~~
r
t~'~ \ ~J
co' d
..,1-gr:e :
Date:
\' II
Ce
I ( -I ~ -Y'(
Expil'CS
Phon~
It iB the responaibility of the permit holder to see that alZ inapections are made at the proper time, that e~ch cddress is l'eadao:e
from the street, and that the permit caI'd is located at the front of the property.
~Bui!ding Lr:vi~io~ approved plan shall l'emain on tha Building Site at all times.
PROCEDURE FOR INSPECTION RSQPEST:CALL 726-3769 (rccorder) state your City designated job mU7:ber, job address, type of in3pecticll
requested ar.d when you will be ready for inspcction, Contractors 01' Owne~s ~e end phone number. Requests received cefore 7:00 ~n
:,'ill be made the same dcy, requests mcde aft~r 7:00 am will be made the next :MJrking day.
Q~ ( 0 3' .?-
Reauired InsDp.ctions
O SITE INSPECTION: To be made after
excavation, but prior to set up of
f01'TTls.
D UNDERSLAB PLUMBING. ELECTRIC,1L &
: MECHANICAL: To be made before any
work is covcred.
o
o
o
o
D
D
D
FOOTING & FOUND,1TION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring ccncreta.
UNDSRGROUND PLUMBING) SElVER. I.fATER}
DRAINAGE: To be made prior to fil-
Ur.g trenc he s .
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
/1001' insulation 01' decking.
POST AND BEAM: To be made prioI' to
installation of flooI' ins~lation or
decking.
ROUGH PLUMBIllG. ELECTRICAL & MECH-
ANICAL: No work is to bc covered
. ur:ti l thcse inspec,tior:s have beer.
made and approve~. '
FIREPLACE: Prior to placir.g facing
m~terials and before framing inspec-
tior:.
FRAMING: Must be requested after
approval of rough plumbing, alectri-
cal & mechanical. AU roofing
bracing 8 chimneys, et~. nr~st be
. completed. tlo work is to be con-
, cealed until thia inspection has
'been made and approved.
YOUI' City Desigr~ted Job Number Is:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made afteI' all insul~tion a~~
, I'equired vapor carriers are in place
but before any lath, gypsum board 01'
wa~~ covering is applied, and before
any insulation is concealed.
~
o
~
D
D
D
o
DRYWALL INSPECTION: To be made
after all drywall is in place,
but prior to any taping.
MASONRY: Steel location, bond
beams, grouting 01' vel'ticcls in
accordance with U.B.C. Section
2415.
WOODSTOVE:
completed.
After installation is
, DEMOLITION OR ;\;OVED BUILDJ.vCS
=:1 Sanitary se'.Jer aapped ~t p:.opcrtij Zir.e
.=:1 Septic tank p~ed and filled with gl'a~eZ
I Final - II'hen above items are completed
~ and when demolition is complete 01' stru~-
ture moved and premises cleaned up.
Mobile Homes
~ Blocking and set-up
~ Plumbing connections s~er alw water
~ Electrical Connection - Blocking, set-u;:;
~ and plumbing connections nr~st be approved
befoI'c requesting electrical inspectio~
~ Accessory Building
I Pinal - Aftar porches, skirting, decks,
~ etc. are complet~d. ..
D
All pl'oJect cor:ditions, such as the i.nstalZation of street trees, cO::7plet'Z:on of the
required landsccpir:g, etc., must be satisfied before the BUILDING FINAL can be reques t:;:d.
o FINAL PLUMBING
o FINAL ME[;HANICAL
D FINAL ELECTRICAL
o
1jJ/
CURB & APPROACH APRON: Afte:- forms
are erected but' pl'ior to pouring
concrete.
SIDErvALK & DRIl'EWAY: For all con-
crete paving within street l'ight-
of-wcy, to be made after alt exca-
vating complete & form work & sub-
base material in place.
~ENCE: h'hen complete -- Provide
gates 01' movable sections through
P.U.E.
o
. FINAL BUILDING: The Final Building Inspection must be I'equeated after the Final PZwnbing
Electrical, and Mechar:ical Inspectiona have been made and approved.
~ALL MANHOLES AND CLEANOUTS llUST BE ACCESSIB[,E, ADJUST!1E!lT TO BE MADE tiT NO COST TO CI'!'Y P:1!7C 7 of ::
I JOB NO. f3J 03)
SOLAR ACCESS
occupanc'l./ Grou_
LOT TYPE
Zone:
Lot Sq. Ftg.
% of lot Coverag;;
N of Stories
Total Height
I Topography
I
I ITEM SQ. FTG
I Main
Interior
C01'ner
Panhandle
Cul-de-sac
X Value
Garac;e
Carport
AcCeSSOl'll
I S.D.C.
TOTA& VALUE
(va~ue)
1.5 x
Building Pe1'mit
State Surcharge
Total Char-ges
I ITEM
I Fixtures
I Residential (1 bath)
I Sanitary Sewer
.1 Water
FEE
CHARGE
NO.
Plumbing.Pe1'17;it I
State Surcha1'ge I
Total Char(lCS I *
) ITEM I NO. I FEE CHARGE
Res. Sa. fto.
Naw/Extend Circuits
Temporary Se1'Vice
I
Ele::trical Permit I
State Sur::harqe I
Total Charr:;es I ~
ITEM NO. FEE CHARGE
Furnace PTU'S
Exhaus t Hood I
Vent Fan I
Woodsto;;e 1\
I
Permit Issuance
I
I t5 . <YO
I .75
1)'5 ;75
Me::hanical Pe1'mi t
State Surcha1'oe
Total Charoes
-- ENCROACHMENT
Se~~rity Deposit
Storage
Maintenance
I
I
I I *
Permit
Total Charqes
lCUrbcut
! Sidcwa lk
,
I
I I
I i
I I
I I
\S,7S-1~
I Fen::e
[Electrical
I .
i Mobi le Home
Label
~
I
,TOTAL AMOUNT DUE: ~
. -,J- ~
REQ.-
L- C 0 G~
e
I I
I
Access. I
I
Type/Cor:st:
Bedrooms:
Enerrrll Sources
Heat
Water !lea tel'
Range
Fireplace
Woodstove
I Lot Faces -
I
I P.&.
NOl'th
T./iDe
Setbacks
House r.arage
East
South
If.fest
I
I I
Fees
Building Value & Permit
This permit is granted on the exPyess condition that the said construction
shall, in aZl respects, conform to the Ordinance adopted by the City of
Springfield, incZuding the Zoning Ordinance, regulating the construction
and use of building!;, and may be:auspended or revoked at cr..y time upon vio-
lation of an!! pl':Jvi;;iona of aaid Ol'dinances. ;
~
~
Iplan Check Fee:
jcate Paid:
I Recaipt II:
I Signed:
Plumbing Permit
No person ahall construct, instalZ, alter 01' ch2nge cny new or existing
plwnbing or drainage syste~ in whole or in part, unless such pe1'son is the
legal possessor of a valid plumber's license, except that a per-son may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
"
Electrical
Perm it
Where State Law requires th~t the electrical work be done by an Electrical
Contractor, the electrical portion of this pe1'mit shall not be valid until
the label has been signed by the Electrical Contractor.
Mechanical Perm~t
"'~y
~
I.
,
i
Plan Excminer
vate
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all ir.for-mation hereon is true and correct, and I
further certify that any ar.d aZZ work pe1'for:ned shaZZ be do:-ze in accor-
dance with the Ordinances of the City of Springfield, and th;; L~~8 of the
State of Oregon pe1'taining to the work described herein, and that NO OCC~-
PANCY wilZ be made of any structure without permission of the Building Di-
vision. I further certify that o:-zly contractors and e:l1ployees who are in
ca~pliance with ORS 701.055 will be used on this project
,~
/I-/Io-P?
0a~
Signed
Date