HomeMy WebLinkAboutPermit Fence 1989-8-17 (2)
.. RES I D E.N T I A L . . SPRINGFlEL.D
,',,' APPLICA'l.fa/PERMIT
225 North 5th Street
Springfield~ Oregon 97477
Building Division
726-3753
Job Location:
~Lt uD
DcU~l1
.....;
Asoesoors Map H'
Subdivision:
Q.mer:
Address:
"
0U[cJD
c;pfd .
City:
- I
I vi Nm,]
I Addition
I Remodel
I nobile Home
Rcce~pt ,II
ILj~)1
~ r. :tf '~D
Taz Lot n
Deocribe 1.'01'1<:
,.--
r-tAnU---
~btwu- m~mCLfly}1Cvrl
~ *1~ Phone: 141/ ?~3t)
, Zip: q7 LJ7 f
rrI7~~1
/\d8ress
?'5D' r2--
'~isc. UBldrs Board
Date of Application
Contractors
: General
IPlumbing
IHechanical
El,ectrical
SUDerv:i;'Sin~Jnec t r ~c ia n
Value
,
-
Sigr.ed:
Date:
,IJA;;/?, -;f"1
I
Re~.
Expin~s
Phnnp
It is the responoibil~ty of ths permit holder to see that all inapections are made at the proper timl':, that each .:ddress is readab~e
from'ths street, and that the permit card is located at the front of the property.
4Buitding Divicion approved plan shall remain on the Building Sit:;; at all times.
.
PROCEDURE POR INSPECTION REQUEST:CALL 726-3769 (pecorderJ state your City designated job nw::ber, job addPess, type of inspec:iclI
requested ar.d w.l:en,you LJill be ready for inspection, Contractors or OI.mers ncme and phone number. Requests received befcre 7:00 ar.r
r..'ill be made the same day, requests made after 7: 00 am LJi II be made the next :JOrking day.
, ,,'" Y~r 'City Deoigr.ated Job Number 10: 'lQ()g671
Reouired Inspections
O SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
. 0, UNDERSLAB PWMBING. ELECTRICAL &
, MECHANICAL: To be made before any
work is covered.
D
FOOTING & POUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
UNDERGROUND PLUMBING. SEWER. w'1TER,
DRAINAGE: To be made prior to fi'L-
lir.g trenches.
D, UNDERPLOOR PLU~mING & MECHANICAL.:
, To be made prior to inotallation of
floor insulation or decking.
O POST AND BEAM: To be made prior to
installation of floor insulation or
deckirIG.
O ROUGlI PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to bc covered
,ur.tiL these inspections have beer.
made and approved. '
D FIREPLACE: Prior to placir.g facing
materiaLs and before framing inspec-
tion.
D
D
PRAMINr.: Must be requeoted after
approval of rough plwrbing, electri-
cal & mechanical. All roofing
bracing ~ chimneys, etc. must be
:' completed. No work is to be con-
",cealed until thio, inspection has
. bee.n made and approved.
,-
-,-
O INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulati:m ar'..d
." , required vapor barriers are in place
. ',;' "but before any lath, gypsum board or
: ,'LXlH covering is appUed, Cl71d before
.. ',' any insulation is concealed.
I DRYWALL INSPECTION: To be made
.--l after all dPywall is in place,
but prior to any taping.
0, MASONRY: Steel location, bond
beamo, grouting or verticals in
accordance LJith U.B.C. Section
2415.
O WOODSTOVE: After installation is
ccmpleted.
D
CURB & APPROACH APRON: Afte:- forms
are ereoted but prior to pouring
COMrete.
DEMOLITION OR !,:OVED BUILDINCS
=:J Sanit;ary seuer oapped at p~opCJrty lir.e
=:J Septia tank p:mtpcd and filZe~ with :1ra~eL
I Pinal. - lo/hen above items are compLeted
~ ar.d when demolition is complete or struc-
ture moved and pr~3es cleaned up.
Mobile Hemes
~ Blocking and Set-~p
~ Plumbing connections -- scwer and wa~er
~ Electrical Connection - Blocking, set-up
~ and plumbing connectiono nr~st te approved
, before requesting elec~rical inspec~io~
~ Acoessory Building
~, . ,
I Final - After p~rches, skirting, decks,
~ etc. are completed.
D
-
All project conditions, ouch as the instaLLation of street trees, co"~pLotion of tne
required landscapir.g, etc., must be satisfied before the BUILDINC PINAL can be raquestad.
D FINAL PLUMBINC
D FINAL MECHANICAL
o FINAL ELECTRICAL
o
o
O SIDEWALK & DRIVEWAY: POl' all con-
crete paving within street right-
pf-wcy, to be made after all exca-
vating complete & form work & sub-
, base material in plaae.
rr-l ~ K~e~'~omplete -- Provide'
~ gates or movable sections through
P.U.E.
D
,'-
FINAL BUILDING: 2'he Pinal Building Inspection must be requeoted alter the PinaL PLumbing
Electrical, and Mechanical Inspectiono have been made and approved.
"ALL MANlICLES AND CLEANOUTS ~IUST DF. ACCESSrBLE, AD.TUSTffENT TO DE n1DE AT NO COST TO CJ'!'Y ! Pa~7c I of 2
SOLAR A~ESS
Occuvancy G1'OIA.
LOT TYPE
Interior
Cornel'
Panhandle
Cul-de-sac
JOB NO.
Zone:
Lot Sq. Ftg.
S of lot COIJerage
.f o{Stories
Total Height
Topography
IJTEN
1 Main
I Garaae
'I CarpOl't
I AccessorII
SQ.FTG
S.D.C.
TOTAL VALUE
(val.ue)
1.5 :c
Building Permit
State Surcharge
Total Cluzrges
x
ITEM
Fi:r:tures
IResidential (1 bath)
I Sanitary Sewer
I Water
I
I NO. I PEE
Plumbing Permi t
State Surcharge
Total Charges
I ITJ::'M
I Rell. Sa. fta.
New/EXtend Circuits
NO.
Temporary Service
Eleotrical Permit
State Surcluzrqe
, Total Charges
IT5M
NO.
Furnace l!TU' S
I EX,haus t Hood
I Vent Pan
I Woodstove
Permit Issuance
Neohanica l Permi t
Stato Surcharae
Total C1uzraIJIJ
I
I
IsecUrity Deposit
I Storage'
I Maintena~e
I Parmi t
-- ENCROACHMENT --
Total Chamos
I Curbcut;
I Sidewalk
I fence
I Electrical Label
I Mobi Le Home
I
I
I......."". r ..1""""" .....,""_.
Value
CHARGE
FEE CHARGE
FEE
I
I'
I
. Cl/ARGE
I
I
I
6,00
r;::::, , n ()
"
REQ.-
L-COG-!,t
.'
Bedrooms:
Type/Cor.st:
_ I Lot Faces -
I
I P.L.
1N01' th
East
South
'Went
I Enerql/ Sources
I iiea t
Access. I Water !loa tel'
I Range
I I Fireplace
I Woodstor:e
, I
TI(l"e
Setbacks
l/ouae Garage
Pees
Building V~lue & Permit
Thin permit in granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted liy the City of
Springfield, including the Zoning erdinance, regulati'1g the construotion
and use of buildings, and may be suapended or revoked at any time upon vio-
lation of any provisions of said Ordinances.
4
4
Plan Check Fee:
Date Paid:
Recdpt II:
Signed:
I
I-
I
I
Plumbing Permit
No person oluzll construct, install, alter or change any new cr ezisting
plumbing or drainage system in whole 01' in part, ur.less such pernon is the
legal possessor o{ a valid plumber's license, except that a person may do
plumbing work to property which is owned, lease~ or operated by the appli-
cant.
r
I
I 4
r
Electrical Permi t
Where State Law requires that the electrical work be dOne by all Electrical
Contractor, the electrical portion of this permit shall root be valid until
the label has.been signed by the Electrical Contractor.
I
I
4
'\
Mechanical Permit
4
l'1-an E:cam1.ner
lJat;e
j
I HAVE CAREPULLY EXAMINED the completed application {or permit, and do
hereby certify that all information hereon is tl'Ue and correct, and I
further certify that any ar.d all work performed shaH be cume in accor-
dance with the Ordinances of the City of Springfield, and the UT~s of tho
4 State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that o:1ly contraotors and e:l1pz.,yecs wl:o are in
compliance with ORS 701.055 will be used on this projcct I
I/'
13~~~L';)~
j Signad
I .
C<....
~-{ 7-?J
Date