HomeMy WebLinkAboutPermit Building 1986-3-3 (3)
. ... ~.'.."',""i:':'':'"'." '....( ~l::t. ':;,:'. ~'.... ',,;,-.If ./O"!..:... ....;..\~ :'::~"':"'. ~:.:...:.~..','..i~";"~",,";o,"""','."""':';:".::':~:'.r"_~': _. . ~ '._
.. .' ';" , ,,-;,-:. '. :' - '., :..~l~..;.,..,.,: ~;".""-.: ':":., .' . '.' ..
" " . ........
.. RESIO "."TIAl"
APPLICATION/PERMIT
225 North 5th'Street
SpringfieZd~ Oregon 97477
BuiZding Division
726-3753
~.: I
SPRINGFIELD
Job Location: S to ((J ()
tJ~
I
~a()
Asaesaors Map /I
Taz Lot /I
Subdivision: ~.i/I1./N
, - - - -
/..Dr
OI.mer: /]1 ( &.. (l/
Address: ....'5 fc. ((':I D
~o/ ~~B/~..~~
Zt:SCA' /
(J. ,.V\.," U Lo,ej ~.araW
o tLLLJ.'1
(j
Ci t':J :
I
I
I I
1)(:1
""",
Addi tien
Remodel
:,fobi le Boma
, Date of Applicatien--2 --27'" S t;:, ,
Contractors
General
Plumbing
Electrical.
Mechar.ic:.:l
Constl'Uction Lender
~~/C~
Pr.one:
?tfJ-l((J~ g
fI< IiAuf~ J
", d '
Receipt # r3 V (~ O.Sq
; '\
. ~-./I /1"')
.. .... f \
,. \' ,..,. ,/ i
'.' \. y......_'-i ,'" ,
1').1 -,'I ',.Y'
rt/-tJL
Zip:
.":f)i;J:lz ~
'W~
valfr 31 C/SD
Address
tI01t.e..tJ -
Lisc.1I
Sigr.ed:
Date:
CP-
:3-~-f50
Expires
Phone
It is the responDibility of ths permit holder. to see that all iMpections are made at t;he proper timt>, that each :;dd:ress is readaD~e
from the street, and that the pernrit card is 'Located at the front of the property.
4Bui!ding [)ivicior: approved plan shall l'emain on thE Building Sit:;; at all times.
PROCEDURE POR INSPECTION REQPEST:CALL 726-3769 (recorder) state your City designated job nzo1:ber. job adCress, type of inspec';icn
requested a~.d when you wiZl be ready for inspection,' Contractors or Owners name and phone number. Requests received before 7:00 ~
:..'ill,be made the same day, requests made after 7:00 am will be made the next :JOrking day.
Reoui'f'p.d Tnm;JP.(!tions
D SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
O UNDERSLAB PLUMBING, ELECTRICAL &
'I1ECHANICAL: To be made before any
work is covered.
o
POOTING & POUND,iTION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring cencret~.
01 ' UNDERGROUND PLUMBING} SEWER. W.1TER,
DRAINAGE: To be made prior to fil-
,Zir.g trenches.
O UNDERFLOOR PLUMBING & MECHANICAL:
, To be made prior to installation of
floor insulation or decking. .,.,. , ,
o
POST AND BEAM: To be made prior to
installation of floor insulation or
deaki1lfi .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be cOL'ered
,ur.tiL these inspections have beer.
made and approved. '
FIREPLACE: Prior to pZc.cir.g facing
materiaZs and before framing inspec-
tion.
D P~1ING: Must be requested aft;er
approval of rough plumbing. electri-
cal & mechanical. All roofing
bracing & chimneys, etc. 'm~st be
," completed. No work is to be con-
. ,,~,cealed until thiD inspection, has
~b6~n made and approved.
D
D
',-
Your City Desigr.ated-.Job Number Ia:
--, INSULATION/VAPOR BARRIER INSPECTION:
---1 To be made after all insulation ~.d
, required vapor barriers are in place
" ' but before any lath. gypsum beard or
uxzZ-Z covering is appZied. and before
. any insulation is concealed.
D DRYWALL INSPECTION: To be made
, after all drywall is in place.
, but prior to any taping.
O MASONRY: Steel location. bond
beams. grout;ing or verticals in
accordanae with U.B.C. Section
2415.
D WOODSTOVE: After installation is
completed.' .
D
:0
CURB & APPROACH APRON:' After forms
are ereoted but prior to pouring
concrete.
SIDEWALK & DRIlTEWAY: POl' all con-
crete paving within street right-
pf-way, to be made after all exca-
vating complete & form work & sub-
, base material in plaoe.
y 0 0 f~ i
DEUOLITION OR :~:QVE!J BUILDIilGS
:=J Sani t;ary S6'..Jer oapped ~t pr:.opc:rt':i line
:==J Septic tank p~ed and fiZZed with gra~eZ
I Pinal - '>'hen above ite:ns are co,71pleted
~ and when demolition is complete 01' strua-
ture moved and premises cleaned up.
NobiLe Hemes
~ Bloaking and .set-up
~ Plumbing connections -- s&Wer and wat;er
~ Electrical Connection - Blocking, set-up
~ and plumbing connections m'~st be approved
, before requesting eleat;rioal inspect;ion
~ ~:;;~a;,rng
'\?(Final - Aft;;r porches,
,L:j etc. are completed.
skirting, decks,
D PENCE: When compl~te -- Provide'
gates 01' movable sections through
P.U.E. '
o
D
.
'-
AlL, project conditions, such as the instaZlation of st;reet trees, co~letion of the
required landsaapir.g, etc., must be satisfied before the BUILDING PINAL can be requested.
D FINAL PLUMBIllG
o FINAL !:fECHANICAL
[J FINAL ELECTRICAL
[J
o
FINAL BUILDING: The Pinal Building Inspection must be requested after the Pinal Plumbing
ElectricaZ. and Mechanical Inspections have been made and approved.
4ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!rEflT TO BE MADE AT NO COST TO CITY I P~ge l' of 2
Page 2
, SOLAR .ESS RE~.-
OCC:UPancll Gl'OU":.~."J .M
WT TYPE Lot Faces -
Setbacks
House Caraqe
I
I
I
f
I
I
I
I;.s:oa
j
I
~~8. 2S
I,JOB NO.X'hO I.).t(
I Zone: &zl:S ~ PG/P
, I
Lot Sq. Ptg.
S of lot Caverag~
# of Stories
Total Height
I
I Topography
j
I ITEM SQ. FTG
I Main
I Garaae
I Carvort
I Accessoru
x
I
S.D.C.
TOTAL VALUE
(value)
1.5 x '
Building Permit
State Surch.:a'ge
Total Cha,....ges
I ITEM I NO.
~~:...__. ~~.
I Residential (1 bath) I I
Sanitary Sewer II
Wate1' I
FEE
Plumbing Pemi t
State Surcr.arge
Total Charoes
ITEM
NO. I
I
I
I
I
FEE
Res. Sa. fta.
I New/Extend Circ:uits
I ~\. 'l' ". '''ilI Service
jfaJ.l~ uP
Electrical Permit
State Surcharqe
Total Charces,
I ITEM
I Furnace ETU' S
I E:::ha:ust Hood
I Vent Pan
Woodstove
I NG. t
I I
I I
I I
I I
I I
FEE
Permit Issuance
Mechanic::zl Permit
State Surcharoe
Total CharaefJ
-- ENCROACHMENT --
SeC'.Aritl.( Deposit
I Storage
I Maintenanae
I Permit
Total Charaes
,
I Curbc:ut;
I Sidewalk
IFenae
I Electrical Label
I Mobile Home. V i?t s8( ~
TOTAL AMOUNT DUE: 4
Interio1'
Corner '
Panhandle
Cul-de-sac
Value
,
1'201.25" ' 4
CHARGE
'Z~. .6
I
I
I
I
I
I
~.OO f
'2 .3D I
72..Bol *
2~. 6t?
I 5". ~~
~O~
I
I
I
I
I
I
I
I
CHARGE
l~~
.
/s:~
~ 0. Of>
/.210
3/.~1f> I *
CHARGE I,
I
I
I
I
I
I
I
I
I
I
I
l
I
I
I
I,
.
L-COG~
,
TypeICor.st:
Bedrooms:
I I EnerGu SO:lrces
I : ,'feat
Water Yp.rzter
I Range o-
j Fireplace
I Woodztove
I I
TUDe
P.L.
N01'th
Access.
East
South
West
-- Fees
I
I
I,
Building Value & Permi.t I
This permit is granted on the express condition that the said.constl'Uction t
shall, in all respects, conform to the Ordinance ::zdopted by the City of I
Springfield, including t;he Zoning' C1'dinance, regulating the construction ,
and uae of buildings, and m::zy be suapended or revoked at any time upon vio-i
Zation of any provisions of said Ordinances. I
14
IPlan Check Pee:
IDate Paid:
IRecdpt II:
I Signed:
Plumbing Permit
No person ahall construct, instal!, alter or change any new or e=isting
plumbing 01' drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except tr4t a pe~son may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
E I ac t r i c a I Per m i t
Where State LClhJ requires tr4t the electrical work be done by an Eleatrical
Contracto1', the electrical portion of t;his permit shall not be valid until
the Zabel has been signed by the Electrical ~ontractor.
Mechanical Permit
*
r-
4'f"-a~~ -.,I'~y~
"l'l Examiner
, ~- ~-g~
~
I HAVE CAREFULLY EXAMINED the completed application fo1' permit, and do
hereby certify that all info:'mation hereon is true and c01'rect, and I
further certify that any ar.d all work performed shall be done in acc:or-
dance with the Ordinances of the City of SpringficZd, and'.th,;; Lcr,,;s of the
4 State of Oregon p:;;rtaining to the work described herein, and t;hat NO OCCU-
PANCY will be made of any structure without parmission of the BuiZding Di-
vision. I further certify that only contractors'ar~ e~loyees who are in
compliance with ORS 701.055 will be used on this project
,
~.t}~ ~/;Vf-
2.1~ /~6
. Date I I
Signad
4