HomeMy WebLinkAboutPermit Electrical 1994-8-24
','
I,
/
}....
.
e
SPRINGFIELD
Tho following project as submitted has the following
zoning, and does not requiro specific land use
225 FIFTH STREET approval. l-~ ELECTRICAL PERMIT APPLICATION
SPRINGFIELD, OREGON 97477 Zoning q~/2- 5 ~
~~~i~gIO~2~~~'~T: 7&e~s37(Jl'2f1,q'f' City Job Number . L
_ Authorized Signature {l f'i\. 3. COMPLETE FEE SCHEDULE BELOV
1. LOCATION Qf INSTALLATION
S-1 ~ \ I)/h<;~ ~/3 2... A. New Residential-Single or
. ( Multi-Family per dwelling unit.
LEGAL DESCRIPTION Service Included:
/7(/2.. "1 LTP,;> tC)/3/TO
--
.' JOB DESCRIPTION
/:YJ / #. r-/?nr~
r ,
Items
Cost
Sum
Permits are non-transferable and expire
if work is not started within 180 days
of issuance or if. work is suspenaed for
180 day~.
2. CONTRACTOR INSTALLATION ONLY
~. Electrical Contractor ~~~~~
Address
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Manuf'd Home or
Modular Dwelling
Service or Feeder
$ 85.00
$ 15.00
t..--, $ 40.00 ' 'flJpo
B. Services or Feeders
Installation, Alterations
or Relocation:
City
Phone
200 amps or,less
201 amps to 400 amps
401 amps to 600 amps
601 amps to 1000 amps
Over 1000 amps/volts
Reconnect Only
$ 50.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
Supervisor License Number
Expiration Date
C. Temporary Services or Feeders
Installation, Alteration or Relocation
Constr Contr. Number
200 amps or less
201 amps to 400 amps
Signature of Supervising Electrician Over 401 to 600 amps
. . Over 600 amps or 1000 volts
7'-';><:-. \ ... D. Branch Circui ts
Owners NameS'~7Roo ~~hl/LA ~ +1' ./---'~ #~ /~ --
r ~ New, Alteration or Extension Per Panel
Address .? 3 ,:) AI c / /W('7~7b:2 ~z
City~{ Phone 7)"2.g4;</
(
Expiration Date
$ 40.00
$ 55.00
$ 80.00
see "B"
above
OVNER INSTALLATION
One Circuit
Each Additional
Circuit or with Service
or Feeder Permit
$ 35.00
$
2.00
>-f L.___ ~//~ ~
-" ...' ~ /
-------------------,-------------------
DATE: B.2~... '9 Y .
RECEIPT #: /~/~
RECEIVED BY: ~.;'~7-'
E. Miscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation $ 40.00
Sign/Outline Lighting $ 40.00
Limited Energy/Res . $ 20.00
Limited Energy/Comm $ 36.00
5. SUBTOTAL OF ABOVE d/J ~(J
5% State Surcharge ( "2..O?D
3% Administrative Fee 1,'2.0
TOTAL d 2 2.0
( -,
The installation is being made on
property I own which is not intended
for sale, lease or rent.
Ovners Signature:
,.
,i
.
e
Permit#: 9~/2~
Address: ~y~ L//9-./?7-'"#/f:<
, - - -..
Issued by: ~ 4.A-":M' ...,
..-- ~ -
Date: S'<~"7'y
,
Statement: Information Notice to Property Owners
About Construction Responsibilities
Note: Oregon Law, ORS 701.055(4), requires residential construction permit appli-
cants who are not registered with the Construction Contractors Board to sign the
following statement before a building permit can be issued. This statement is required
for residential building, electrical, mechanical, and plumbing permits. Licensed
architect and engineer applicants, exempt from registration under ORS 701.010(7),
need not submit this statement. This statement will be filed with the permit.
Fill in the appropriate blanks and initial boxes 1 and 2, and either box 3A or 3B:
lKJ
U
1. I own, reside in, or will reside in the completed structure.
2. I understand that I must register as a construction contractor if the structure is sold or offered for sale
before or upon completion.
u
3A. My 'general contractor is
(Name) Contractor regis. #
I will instruct my general contractor that all subcontractors who work on the structure must be
registered with the Construction Contractors Board.
OR
~ 3B. I will be my own general contractor.
If I hire subcontractors, I will hire only subcontractors registered with the Construction Contractors
Board. If I change my mind and hire a general contractor, I will contract with a contractor who is
registered with the CCB and will immediately notify the office issuing this b.uilding permit of the
name of the contractor.
I hereby certify that the above information is correct and that I have read and do understand the Information
Notice to Property Owners about Construction Responsibilities on the reverse side of this form.
{l~,~~ ~ /l
(Signature of permit applicant)
q- 2?-7~
(Date)
(White copy to issuing agency permit file,
pink copy to applicant)
....
.
.
"
",
TI[(i)~@fi"malft~@fiil 'U\fl(QJ~~~~ ~@ '[Pfi"(Q)IP~ult1f OW[(i)~fi"$
. '. ~lo)(Q)M~ 'ZC(Q)[(i)$~fi"M~ft~(Q)[(i) ~~$IP(Q)[(i)$~lo)~~~~~~$
~.... ...- ~" .~.. '" .-..... .:...... .....~ '"". .
"
"
..:. Note.: This Information Noti~e to' Property Owners about Construction Responsibilities
... ...', . '.. ,
was developed by the Construction-Cqntractors Board in accordance with ORS 70I.055(5).
If you are acting as your own contractor to construct a new home or make-a substantial improvement to an existing structure,
you can prevent many problems by being aware of ~he following responsibilities and areas of concern.
!EM IP'IL(QJV!EIRlIRl!E5)IP'(QJ[i\I]S~ 18l~ UT~!ES:.
If you hire persons not registered with the Construction Contractors Board to do labor in constructing or assisting in the
construction or improvement of a residential structure, you will, in most instances, be mled to be an employer and the people
you hire will be employees. As the employer, you must comply with the following: ,
Oregmll. 's WJiallnllnolldDll1I.g aax llaw: As an employer, you must withhold income taxes from employee wages at the time employees
are paid. You will be liable for the tax payments even if you don't actually withhold the tax from your employees. For more
information, call the Oregon Dep1. of Revenue at 945-8091.
Ull1l.emJPilloymell1l.a nll1l.summce 1I:ax: As an employer, you are required to pay a tax for unemployment insurance purposes on the
wages of all employees. For more information, call the Oregon Employment Division at the Department of Human Resources
at 378-3524.
Workers' comJPiell1l.saanmll. Dll1I.SUnrall1l.ce: As an employer, you are subject to the Oregon Workers' Compensation Law, and must
obtain workers' compensation insurance for your employees. If you fail to obtain workers' compensation insurance, you may
be subject to penalties and will be liable for all claim costs if one of your employees is injured on the job. For more information,
call the Workers' Compensation Division at the Department of Consumer and Business Services at 945-7888.
u.s. ][ll1I.aerHllall lRevemJle SerVlice: As an employer, you must withhold federal income tax from employees' wages. You will be
liable for the tax payment even if you didn't actually withhold the tax. For more information, call the Internal Revenue Service
at 1-800-829-1040:
OTlHIlE1Rl IRlIESIP'OlNlS~I8l~lLnr~lES AlNlfC>> AIRlIEAS OIF COlNlC!EIRl[i\l]:
Code COmJPillDaHllce: As the permit holder for this project, you are responsible for resolving any failure to meet code requirements
that may be brought to your attention through inspections.
lLfi~1l>DnJiay aHlld JPill'OJPieray damage DHllsuram;e: Contact your insurance agent to see if you have adequate insurance coverage for
accidents and omissions such as falling tools, paint overspray, water damage from pipe punctures, fire, or work that must be
re-done.
nme ao sUllJlllerVlise emJPinoyees: Make sure you have sufficient time to supervise your employees.
IExpemse: Make sure you have the expertise to act as your own general contracto,r, to coordinate the work of rough-:in and finish
trades, and to notify building officials at the appropriate times so they can perform the required inspections.
,
If you have additional questions, write or call the Construction Contractors Board (PO Box 14l40,Salem,.OR 97309-5052,
503/378-4621). The Board is located at 700 Summer S1. NE Suite 300, in Salem.
prop-own,pm4
1/94