Loading...
HomeMy WebLinkAboutPermit Building 1998-3-27 (2) f.. Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 980272 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 5145 DAISY ST Assessors Map #: 17023334 Lot: Block: Tax Lot #: 04616 Subdivision: Owner: LEONARD HAMON Address: 5145 DAISY STREET Phone #: City/State/Zip: SPRINGFIELD, OREGON 97478 Describe Work: MANUFACTURED HOME NEW Const. Contractor Contractor # Expires Phone General: JL BEAN 0080044 03/05/00 942-9082 78156 MOSBY CREEK COTTAGE GROVE OR Plumbing: RS PLUMBING 0038435 01/11/98 852-7050 Electrical: DIXON ELECTRIC 0066894 33736 MARTIN RD CRESWELL OR 974260~ j ).. t1~. OFFICE USE __ .~) r,~~ LAND USE: l1~O-fV~ ~~ ~.. # OF BLDGS: 1 ZONING COD.t: ~. ~~ ~)> OCCY GROUP: R3 # OF BDRMS :~~~4J ~ '% HEAT SOURCE: FE RANGE: E {90A~ ~ ~~ SQ FOOTAGE: 1296 ~L. a ~~ 4,,- To request an inspection, call the 24 hour reco~~~~t~~6~69. ~a -f<2 ~..o <<- ~ All inspections requested before 7:00 a.m. will be ~ade~~~~~2rking day, inspections requested after 7:00 a.m. will be made the fo~wI~ wif:2l.< day. <?~ ~~ ~;f- REQUIRED INSPECTIONS ___ V~ O~ FOOTING - After trenches are excavated. SLAB - To be made after all inslab building service equipment, conduit piping, and other equipment items are in place but prior to concrete MANUF HOME/MOBILE HOME SET UP - When all blocking is complete. MANUF. HOME/MOBILE HOME ELECTRICAL - When blocking, setup, and plumbing inspections have been approved and home is connected to panel MANUF. HOME/MOBILE HOME PLUMBING - After home has been connected to water and sewer. FINAL SET UP - After all required inspections are approved and porches skirting, decks, venting, house numbers, etc. have been installed. 07/18/98 895-2440 QUAD AREA: 3RSC # OF UNITS: 1 CONSTR. TYPE: WATER HEATER: VN E Total Height: 15 Solar Approved: Y Lot Type: INTERIOR , Item Main Garage FTG/PERIM FOUNDATION Total Value BUILDING PERMIT --- Square Feet x $/Square Feet = Value 42,000.00 0.00 5,000.00 47,000.00 Building Permit Fee Surcharge/Admin 50.50 4.05 TOTAL FEE (A) 54.55 Job Number: 980272 Page 2 --- PLUMBING PERMIT --- Item Mobile Home Fee 15.00 Plumbing Permit Surcharge/Admin 15.00 1. 20 TOTAL CHARGE (C) 16.20 --- MISCELLANEOUS PERMITS --- Mobile Home State Issuance Surcharge/Admin CITY SYS DEVEL CHG 105.00 20.00 8.40 98.41 TOTAL MISCELLANEOUS PERMITS (E) 231.81 (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and E combined) 302.56 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: 32.83 Date Paid: 03/05/98 Received By: LORNE PLEGER Plans Reviewed By: LISA HOPPER Date: 03/11/98 Building Site Reviewed By: LISA HOPPER Receipt Number: 29008 --- ADDITIONAL COMMENTS --- DRIVEWAY REQUIRED TO BE PAVED 2 STREET TREES REQUIRED By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that, the permit card is located at the front of the property, and the approved set of plans will rema' on the site at all times during construction. {3~ ::J - 2'? - 'lg si7re Date Job Number: 980272 Receipt Number: DATION --- _ _ 1r11~i.~ ~'1rflt ~ ~O'<\ .fJO ~\[XL! Date Paid: Amount Received: Received By: Page 3 SP.FIELD MANUFACTURED HOME LAND USE AGREEMENT 225 FIFTH STREET SPRINGFIELD, OR 97477 (541) 726-3753 FAX (541) 726-3689 DEVELOPMENT SERVICES DEPARTMENT As required by the City of Springfield Development Code, I agree that with the a proval of the attached permits, one of the following manufactur~ l).o1!les will be placed at Springfield, Oregon, City Job Number Y 'fl) 91 ~ . V' Type I Manufactured Home. A multi-sectional (double wide or wider) unit with an enclosed floor area of not less than 1,000 square feet, that has a nominal roof pitch of 3 feet in height for each 12 feet in width, that has no bare metal siding or roofing, and that has been certified by the manufacturer to have an exterior thermal envelope meeting performance standards which reduce heat loss to levels ,equivalent to the performance standards required of single family dwellings constructed under the State Specialty Codes. Type II Manufactured Home. A unit of not less than 12 feet in width with an enclosed floor area of not less than 500 square feet, that has a nominal roof pitch of2 feet in height for each 12 feet in width and that has no bare metal siding or roofmg. The manufactured home shall be placed on an excavated and back-filled foundation not to exceed 6 percent slope within 10 feet of the perimeter enclosure. The perimeter foundation wall surrounding the home shall be constructed of stone, brick or other masonry materials, and with no more than 24 inches of the enclosing material exposed above grade. I further agree to meet all land use and City Code requirements of the above mentioned parcel within 60 days of the date of issuance of the manufactured home set up permit. These requirements may include, but are not limited to the items listed below. Specific land use requirements regarding your parcel are noted on your approved set up plans and/or permit and your partition approval if applicable: . Street Trees . Paving Driveway . Minimum 32 square foot storage structure . Completion of partition approval . Removal of any existing structures as noted on your partition approval . Signing and recording of any required partition, easement, improvement agreements, etc. . Final lot grading , . City Sidewalk and curbcut installation . Any outside agency approval as required Le., Division of State Land approval. By my signature below, I agree to complete the above mentioned land use requirements. s;gnaZ5 ...ee.- /ontractor Signature Date .3- 'J. '7 -q r' Date . JOB NO. . qeo 2.77- ... ATTACHMENT A I CITY OF SP~NGFIELD SYS~EMS DEVELO MENT CHARGE WORKSHEET NAME OR COMPANY: I.-~ ONAIZ./) JIA /'1,cA- LOCATION: 5/ 45"DA. I~ '/. 5'/ DEVELOPMENT TYPE: f((f!;,IJu.c~ H.I-I, BUILDING SIZE: LOT SIZE so. Ft. N6'-..J 0'-0 1. STORM DRAINftGE (;?7)f4~) - G.4Y<<-') = - +&sr- IMPERVIOUS SO. FT. -e X $0.226 PER SQ. FT. $ 0 2. SANITARY SEWER-CITY ( 0""1.."" I ~<'fO __ CS'/t.. APPI 7n~IVA (... NO. OF PFU'S 2- X $46.86 PER PFU $ q <:., 77- (See Reverse Side) 3. TRANSPORTATION 'NO OF UNITS X TRIP RATE X COST PER TRIP X X $472.49 $ o X X $472.49 $ X X $472.49 $ 4. SANITARY SEWER-MWMC NO. OF FEU'S . X PER FEU + $10 MWMC/ADM FEE $ ~ MWMC CREDIT IF APPLICABLE (SEE REVERSE) $ TOTAL-MWMC SDC $ SUBTOTAL (ADD ITEMS 1.2.3 & 4) $ Cj3,72- 5. ADMINISTRATIVE FEES BASE CHARGE (SUBTOTAL ABOVE) X .05 " $ -4,~q l)L Date: 3-Jl-9~ SDC Coordinator TOTAL SDC $ 98,4/ .', .. .,'\. I VIIL. VI"'. I vl-'\LvUL.1-'\ IIUI\! II-\DLl::. Number at New Fixtures X Unit Equivalent == Fixture Units . (NOTE: Fo~ remodels, calculate on.e NET additional fixtureS). ' . . NUMBER OF UNIT FIXTURE FIXTURE TYPE NEW FIXTUR~S EQUIVALENT UNITS Bathtu b........... . . . . ... . .. .. . . . . . .... . . . . . . . . . . . . . .... . . ...... . .. . . . . . . ... .. Drinking. Fountain.. ........................... ........................ Floor Drain...... ...... ................................. ............ ........ Interceptors For Grease/Oil/Solids/Etc................. Interceptors For Sand/Auto WashiEtc.................. Laundry Tub/Clotheswasher................ ..... .............. Clotheswasher - 3 Or More..................................... Mobile Home Park Trap (1 Per Trailer).................. Receptor For Refrigerator/Water Station/Etc........ Receptor For Commercial Sink/Dishwasher/Etc.. Shower, Single Stall................................................. Sho wer. G a n g.. . .. .. . .. .. . . . . . . . .. . . . . . . .. . .. . .. . . . .. .. . . . .... .. . . .. ... Sink: Bar, Commercial, Residential Kitchen........................ Urinal, Stall/Wall....................................................... Wash BasiniLavatory, Single..........,... .................... Toilet, Pubiic Installation........................................ Toilet,. Private..... ............:............... ......... ............. Miscellaneous: , I 2 1 2 3 6 2 6 6 1 3 2 l/Head 2 2 1 6 4 TOTAL FiXTURE UNITS . ""2.... -::2-- CREDIT CALCULATION TABLE: Based on assessed value. If improvements occurred after annexation date in table, calculate credits separates. Year Annexed Rate per $1,000 Assessed Value Year Annexed Rate per $1,000 Assessed Value I; 1979 or before 1980 ' 1981 1982 1983- 1984 1985 1986 $3.97 3.89 3.83 3.70 3.55 3.39 3.20 2.91 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 $2.56 2.17 1.73 1.31 0.92 0.74 0.61 0.45 0.31 0.17 Credit for Parcel or Land Only If Applicable X $ (Rate X Assessed Value) X $ . (Rate X Assessed Value) Improvement (if after annexation date) CREDIT TOTAL _ $ RUNOFF COEFFICIENTS FOR STORM DRAINAGE (For Estimating Purposes Only) Fiesidemi.,I...;....................... 0.4 Commerical... ...................... 0.9 Industrial............................ 05 Governmental...... .... ............ 0.5 IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT . SP.FIELD DEVELOPMENT SERVICES DEPARTMENT. \\, \~~b ~t~~(1~ 225 FIFTH STREET SPRINGFIELD, OR 97477 (541) 726-3753 FAX (541) 726-3689 To Manufactured Home Lending Institute: On February 14, 1997, our office sent a letter to the local Manufactured Home Dealers and Installers clarifying some misunderstandings that have occurred recently in the placement of manufactured homes in the City of Springfield. The confusion has occurred regarding the completion of a project when a manufactured home is placed on a private lot. Although the State of Oregon does not require a Certificate of Occupancy from the local jurisdiction prior to the resident moving in, a number of other issues and requirements are associated with theproject. An example would be land use requirements. The City of Springfield Development Code requires that when a manufactured home is placed on an individual tax lot, the.driveway shall be paved if the property abuts an improved street. This is not a requirement for the home, but it is a requirement for the land. The number and type of requirements may vary for each lot. A number of Lending Institutes have phoned us recently requesting information on particular sites which have been issued a permit for the installation of a manufactured home. Due to the number of calls, we will be providing site and home information to, you at the time the permit for placement of the manufactured home is issued. Our hopes are that this will assist you in the completion of your process. Attached is a permit which was recently issued. The applicant has listed you as the Lending Institute. This is mailed to you for information only and requires no action on your part. I will continue to mail this letter . with the applications for a while until both you and I are comfortable with the new process. If you have any questions, please feel free to phone me at 726-3790. Sincerely, ~ Lisa Hopper ~ Building Safety Coordinator CITY JOB NUMBER: ~ ~D '2 7