Loading...
HomeMy WebLinkAboutPermit Building 2006-5-23 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2005-01685 ISSUED: OS/23/2006 APPLIED: 12/02/2005 EXPIRES: 11/23/2006 VALUE: $ 5,107,804.00 SITE ADDRESS: 2211 Laura St ASSESSOR'S PARCEL NO.: 1703271101100 Springfield TYPE OF WORK: Apartment Building , u\O TYP&(Op:lU8E'~ New Commercial 0\\ v- \.),\\\,., Assisted living and alzheimer's care facilio/':eC\ gO" ~ \o{l..'(\ ,,\'3-\\ e O~e e se Cl" ,.~00 . ~'(\ _ '^~ ~('JJ0 ~,v' "cO Vl 0\""- ~':;)~ D'l ,.,. _\,\"\\0 . o.o-y,y; \'(\ose ~ :\\ O~ e ~0\e'Phone Number: 541-686-1119 f\.\ \~, ~eS '0 ~e~' X\~00g 0\ '\\"\ :\\o"e r ~" ~0 Ce" '\ () ~ \eS eW? ' 0'(\ \o\\~.,,..?.:(\o"_ f\a'\-()~.,;,\" co~o" >\\,e ~'n\\X\C'O-\'\ "\0\'\" 0':>", d U" 1\"'-"" '~\\.':I' '\ 'I'" _,,9.. oJ,"",^" ,-< \: 'I \\\ ~f).{); J' I CflNTE,A:G'fO.R J)N'FO~M}\TlQ~'1 \)uoJ ~\\"g" 0' \'(\'0 ,- \,'OVv C (\\'Oe' \ "W' \S License '(\u <;,e 114163 20919 3944 60958 PROJECT DESCRIPTION: Owner: Address: BA YBERRY COMMONS LLC 30 EAST BROADWAY, #160 EUGENE OR 97410 Contractor Type General Electrical Mechanical Plumbing Expiration Date OS/24/2006 02/20/2010 05/31/2007 07/23/2009 Phone 503-775-1962 503-678-1355 503-363-2334 360-687-3983 Contractor BURTON WALTER BEAR ELECTRIC INC JET HEATING INC TAPANI PLUMBING INC # of Units: Primary Occupancy Group: Secondary Occupancy Group: Primary Construction Type Secondary Construction Type: # of Bedrooms: It SR-l VA VB Frontyard Setback: Side 1 Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: Street Improvements: Storm Sewer Available: Special Instruction: Notes: BUILDING INFORMATION I # of Stories: 2 Lot Size: Height of Structure 35.00 Sq Ft 1st Floor: Type of Heat: Gas Sq Ft 2nd FI8.~: Water Type: Gas s~~~e~ Range Type: Gas ~\?..~qrF ~~itarport Energy Path: . t' . K-l\!h:.'1', ~<ilf; IJ.U~ sprinkle<!\~1Idi~" w...\\ S\\~'f\ \\\\~~'\5~i Load: \' F ~~~ - \ \~\)'t. . ~ l'>\~ I DEVELOPMEN~~M-!1f~j';)~. "r...' t,\'l"'::{ "''' c()\'~\ Q\) \)~ Overlay Dist:C>.W{ \ u # Street Trees' Rqd: Paved Drive Rqd: % of Lot Coverage: 29,393 17,294 418 REQUIRED PARKING Total: Handicapped: Compact: I PUBLIC IMPROVEMENTS I Sidewalk Type: Downspouts/Drains: Pal:?:e 1 of7 Status Issued CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2005-01685 ISSUED: OS/23/2006 APPLIED: 12/02/2005 EXPIRES: 11/23/2006 VALUE: $ 5,107,804.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line .1 Valuation Description I A.C. - Com mer Conv. Hospitals Pavin2: Sprinkler Svs AC - Commercial V I-Hour Use Bid Amount Sprinkler System $ Per Sq Ft or multiplier $4.10 $97.00 $1.00 $3.00 Square Footage or Bid Amount . 47,001.00 47,001.00 215,000.00 47,001.00 Value Date Calculated Description Type of Construction Total Value of Project $192,704.10 $4,559,097.00 $215,000.00 $141,003.00 $5,107,804.10 12/02/2005 12/02/2005 04/24/2006 12/02/2005 ~ Fee Description Amount Paid Date Paid Receipt Number Plan Review Comm/Ind/Public $10,492.89 12/2/05 2200500000000001655 Plan Review Fire & Life Safety $6,457.16 12/2/05 2200500000000001655 + 10% Administrative Fee $5.00 5/22/06 1200600000000000686 + 8% State Surcharge $4.00 5/22/06 1200600000000000686 Temp Power 200 amps or less $50.00 5/22/06 1200600000000000686 -Mechanical Issuance Fee- $10.00 5/23/06 2200600000000000642 + 10% Administrative Fee $2,281.93 5/23/06 2200600000000000642 + 8% State Surcharge $1,750.39 5/23/06 2200600000000000642 Air Handling Unit Up to 10,000 $184.00 5/23/06 2200600000000000642 Appliance Not Listed $549.00 5/23/06 2200600000000000642 Appliance Vent $18.00 5/23/06 2200600000000000642 Backflow Device $28.00 5/23/06 2200600000000000642 Building Permit $16,142.90 5/23/06 2200600000000000642 Curbcut - Additional Driveway $80.00 5/23/06 2200600000000000642 Curbcut Permit $80.00 5/23/06 2200600000000000642 Dryer Vent $12.00 5/23/06 2200600000000000642 Encroachment Permit $130.00 5/23/06 2200600000000000642 Exhaust Hoods $18.00 5/23/06 2200600000000000642 Fixture $3,976.00 5/23/06 2200600000000000642 Furnace - up to 100,000 btu $144.00 5/23/06 2200600000000000642 Gas Outlets 1-4 $4.00 5/23/06 2200600000000000642 Gas Outlets 4+ $13.00 5/23/06 2200600000000000642 Paving $939.40 5/23/06 2200600000000000642 Plan Review Comm/Ind/Public $454.18 5/23/06 2200600000000000642 Plan Review Fire & Life Safety $279.50 5/23/06 2200600000000000642 PW Disc - 2nd Permit (Street) $-30.00 5/23/06 2200600000000000642 PW Disc - 3rd Permit (Street) $-30.00 5/23/06 2200600000000000642 Sanitary Sewer - Ist 50 Feet $45.00 5/23/06 2200600000000000642 Sanitary Sewer - Improvement $119.02 5/23/06 2200600000000000642 Sanitary Sewer - Improvement $10,000.00 5/23/06 2200600000000000642 Sidewalk Permit + Addtl Sq Ftg $101.60 5/23/06 2200600000000000642 Storm Sewer - 1st 50 Feet $45.00 5/23/06 2200600000000000642 Storm Sewer Each Addtll00' $308.00 5/23/06 2200600000000000642 Pa2:e 2 of 7 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Vent Fan Water Line - Ist 50 Feet Total Amount Paid Fire Department Review Initial Review LDAP Review LDAP Review LDAP Review LDAP Review Planninl! Review Public Works Review Public Works Review 12/05/2005 12/05/2005 12/22/2005 03/07/2006 05/04/2006 05/04/2006 12/05/2005 12/05/2005 05/04/2006 $348.00 $45.00 $55,054.97 I Plan Reviews I 03/15/2006 12/05/2005 12/22/2005 03/07/2006 05/04/2006 05/04/2005 12/22/2005 05/04/2006 OK APP 10 10 OK APP APP WE APP Pal!e 3 of 7 CITY OF SPRINGFIELD. Building/Combination Permit PERMIT NO: COM2005-01685 ISSUED: OS/23/2006 APPLIED: 12/02/2005 EXPIRES: 11/23/2006 VALUE: $ 5,107,804.00 5/23/06 5/23/06 2200600000000000642 2200600000000000642 GRG See attached document for Fire Department Plans Review comments. SKG VRJ Sent applicant LDAP application. Applicant is aware of the LDAP requirement and will be submitting plans in the future. LDAP plans submitted by Bayberry Commons 3-3-2006 and are under review. LDAP ISSUED LDAP permit has been issued 5-4-2006 Site Plan Review DRC2005-00065 in review process. Linda Pauly is planner. development Agreement received LDAP must be issued before this permit. Public Improvement Project approval and Encroachment permit application required before doing any work in the Public Utility Easements or the Right-of-way. SIdewalk and curbcut permits added. SDCs added. LDAP ISSUED. Still need encroachment permit application, and PIP application for work in right-of-way or in Public Utility Easements. VRJ BRC VRJ EMM SB SB CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2005-01685 225 Fifth Street, Springfield, OR ISSUED: OS/23/2006 541-726-3753 Phone APPLIED: 12/02/2005 541-726-3676 Fax EXPIRES: 11/23/2006 541-726-3769 Inspection Line VALUE: $ 5,107,804.00 Revised Plan Review - Fir 02/22/2006 03/15/2006 OK GRG Plans Review: Revised submittal for an assisted living and Alzheimers facility. Job #COM2005-01685. Occupancy Classifications: 1-1/SR-l: A-2 (dining area); F-l (kitchen, electrical and mechanical rooms); B. Construction Type: V -A-sprinklered. Building square footages: 1st floor-29,393 sq. ft.; 2nd floor-17,294 sq. ft.; Total-47,001 sq. ft. Revised Plan Sheet CS shows SE stairway in rated enclosure. Plan Sheet A8.1 added showing door schedules. Violation abated on first plans review of initial submittal. Refer to first plans review for inspection and review. Revised Plan Review - Pia 02/22/2006 WI Waiting for final site plan approval and DA. Revised Plan Review - Pu 02/22/2006 03/14/2006 WE SB Revised plan.SDCs changed slightly. Still hold for LDAP Revised Plan Review - Str 02/22/2006 02/22/2006 10 JMP Burt Walter delivered 4 sets of revised drawings and Tony Koach's responses including some energy code forms. Revised Plan Review - SU 02/22/2006 04/24/2006 APP JF Structural Review 12/05/2005 12/15/2005 WE JMP See attached documents for 17 structural comments faxed to Tony Koach. Structural Review 12/16/2005 12/16/2005 10 JMP WE. See attached document for mechanical count verification faxed to Don Olheiser. Structural Review 12/16/2005 12/16/2005 10 JMP WE. Tony Koach called to discuss all 17 comments and to request an electronic copy of the letter which 1 em ailed to him. Structural Review 12/21/2005 12/21/2005 10 JMP Received fax from Marcy Huxtable with counts of mechanical equipment. Left a voice mail for her requesting missing information. Structural Review 12/22/2005 12/22/2005 10 JMP WE. Received Marcy's count of 2 dryer vents, and Aaron's count of 3 gas water heaters and 17 gas connections. Structural Review 05/04/2006 05/04/2006 APP JMP Received final internal approvals. Pal!e 4 of 7 CITY OF SPRINGFIELD - Status Issued Building/Combination Permit PERMIT NO: COM2005-01685 ISSUED: OS/23/2006 APPLIED: 12/02/2005 EXPIRES: 11/23/2006 VALUE: $ 5,107,804.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line SUB Review 12/06/2005 12/19/2005 WE JF See comment 5 in the attached structural comments requesting energy code information. To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. ~eolliredJnsnections I Site Inspection: To be made after excavation but prior to setting forms. Erosion/Grading Inspection: Prior to ground disturbance and after erosion measures are installed. Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or foundation inspection. Footing: After trenches are excavated. Foundation: After forms are erected but prior to concrete placement. Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in place but prior to concrete. Shear Wall Nailing: Before covering sheathing with finish materials. Framing Inspection: Prior to cover and after all rough in inspections have been approved. Wall Insulation: Prior to cover. Ceiling Insulation: Prior to cover. Roofing: Prior to installing any roof covering. Firewall: Located and constructed according to plans. Masonry: Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to City Building Inspector. Structural Concrete: In excess of 2500 psi. To be done during construction by a State Certified Inspector. Provide results to City Buiding Inspector Roof Sheathing/Nailing: Before covering sheathing with finish material. Glu-Lam Beams: Inspection Certificate by an approved agency to be provided to City Building Inspector prior to placement. Ceiling Grid: After drywall approval but prior to cover. Hold Downs Installed: Special Inspection performed prior to placement of concrete. Provide report to City Building Inspector. Epoxy Anchors: To be done by Certified Spcial Inspector. Provide Inspection results to City Building Inspector. Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test results to City Building Inspector. Pa2e 5 of7 CITY OF SPRINGFIELD. Building/Combination Permit Status Issued PERMIT NO: COM2005-01685 ISSUED: OS/23/2006 APPLIED: 12/0212005 EXPIRES: 11/23/2006 VALUE: $ 5,107,804.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Fire Department Sprinkler System: Prior to cover. Hydro pressure test, fire line flow test. Fire Department Underground Sprinkler System: Prior to cover. Hydro pressure test, fire line flow test. Fire Department Alarm System: Fire Department Alarm System Acceptance Inspection. This inspection must be requested and approved prior to requesting any occupancy approval. Fire Department Water Supply. Inspection to assure water supply is available on site for construction. This inspection is required prior to any combustible construction. Fire Department Access. Inspection to assure access is available to site for construction project. This inspection is required prior to any combustible construction. Final Fire Department. After all requirements of the Fire Department have been met. Final Building: After all Conditions have been completed as required on Development Agreement. Final Building: After all required inspections have been requested and approved and the building is complete. Rough Grading: After gravel is in place but prior to placing concrete. Final Paving: After paving is complete. SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection. SUB Final: After all required energy inspections have been requested and approved. Underslab Plumbing: Prior to filling the trench and including required testing. Rough Plumbing: Prior to cover and including required testing. Shower Pan. Prior to covering and including required testing. Water Line: Prior to filling trench and including required testing. Sanitary Sewer Line: Prior to filling trench and including required testing. Storm Sewer Line: Prior to filling trench. Grease Trap: Prior to Cover. Final Plumbing: When all plumbing work is complete. Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection. SUB Plumbing: Following City Rough Plumbing inspection approval and prior to cover. Underfloor Gas: After line is installed and required testing and capped if not attached to an appliance. Underslab Gas: After line is installed and required testing and capped if not attached to an appliance. Rough Gas: After line is installed and required testing and capped if not attached to an appliance. Gas Service: After line is installed and line has been connected to a minimum of one appliance including required testing. Presure test done at this point. Rough Mechanical: Prior to Cover Final Gas: When all gas work is complete. Final Mechanical: When all mechanical work is complete. SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover. Pal!:e 6 of 7 CITY OF SPRINGFIELD C Status Iss u ed Building/Combination Permit PERMIT NO: COM2005-01685 ISSUED: OS/23/2006 APPLIED: 12/02/2005 EXPIRES: 11/23/2006 VALUE: $ 5,107,804.00 225 Fifth Street, Springfield, OR 541- 726-3 7 53 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Rough Electric: Prior to Cover Electric Service: Approval required prior to utility company energizing service. Final Electric: When all electrical work is complete. SUB Ceiling Grid: Interior Lighting SUB Exterior Lighting Curbcut - Standard: After forms are erected but prior to placement of concrete. Curbcut - Second: After forms are erected but prior to placement of concrete. Sidewalk - Setback: After forms are erected but prior to placement of concrete. Temporary Electric: Approval required prior to Utility Company energizing pole. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made ofany structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times dUfi~ -:>h,0C;; Owner o~ntnf?t~;rs Signature Date. I' Pal.!.e 7 of7 City of Springfield Community Services Division 225 Fifth Street Springfield, OR 97477 Te~ephone: (541) 726-3759 Fax: (541) 726-3689 C!>~~s ..O("eS- Building Permit # ~,,'(~~~~'""t C~MO~S. Project Title "l,...'L t \ ~cJ tz.~ &-t-e 5-. "C Project Address 5 - ~ - "Z.J::>ob Date t.. Special Inspection and Testing To applicants of projects requiring special inspection or testing as per Section 1704 of the Oregon Structural Specialty Code. Please review the information below. When you have finished, acknowledge an understanding of the information by signing below, and return this form to the City. BEFORE A PERMIT CAN BE ISSUED: The owner or owner's representative, on the advice of the responsible Project Engineer or Architect, shall complete, sign, and submit to the City for review and approval this form completed on both the front and back. The owner and General Contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection and/or Testing. 1, Contractor is responsible for proper notification for the Inspection or Testing of items listed. 2. Testing laboratory shall take appropriate samples and transport them to their laboratory for proper evaluation or testing. . Copies of all laboratory reports and inspections are to be sent to the City by the Testing Agency. 3. Special Inspection Agency is to submit names and qualifications of on-site Special Inspectors to the City for approval. 4. Special Inspector shall provide inspection reports to the building official of all inspection activities. 5. Contractor is responsible to review the City approved plans for additional inspection or testing requirements that may be noted, BEFORE A CERJ II'lCATE OF OCCUPANCY WILL BE ISSUED: The Special Inspection Agency shall submit to the Building Official a statement that all items requiring inspection have been fulfilled and reported and were to the best of the inspector's knowledge, in conformance with the approved plans, specifications and applicable workmanship provisions, Those items not tested and/or inspected shall be noted in the statement. The report is to be submitted to the City prior to a request for final inspections. ACKNOWLEDGEMENTS PeI"J~;f ~~c/e-, Qwner Name ~rinted) j\tvlli;)(.J1 (\ U>f\{.(1. I ~(1lll::rr Engineer or Architect Firm (Printed) c:.^~00N ~STJN~ Testing Laboratory Name (Printed) Bw-\-ro\ \00. \.+w- (r)~~~~ ~ tJ(1'~ Gen. Contractor Firm Name (Printed) General Contractor Signature - ~)AME I\.s, TE;l1l\Ju Ll\1\ ~ Soecial Ins~etieil. .1) 8~ Name (Printed) ~ ~~. f\~~ ~~ \ Testing Laboratory Rep. Signature Butld~fficial Name (Printed) David P. Holt P.E. --- :~r~^Y~~ Building Official Signature ,. Reinforced Concrete, Gunite, Grout and Mortar: Concrete Gunite Grout Mortar .,. V _ \ V' t;t;1: - S \J fl.,AIJ J , ^' " S V V' ~ 11' " f/ S € f! . S DfZ..11'rN tl\Jlt S. PrecastJPre-stressed Concrete: Piles Post-Tens Pre-Tens Cladding SMOKE CONTROL: Leakage testing Control Verification ROO~G: V Insulation inslallation/R-Value* 1/ Test strips/seams SPECIAL INSPECTION AND TESTING SCHEDULE ". Aggregate Test of Mix Design Reinforcing Test Mix Design-Weighmaster Cert. * Reinforcing, Placement Continuous Batch Plant Inspect. Inspect Placing Cast Samples Samples (Pickup/Delivered) Compression Test* GRADING, EXCAVATION, AND Fll..L t/ Acceptance tests * PSF S ~ s Pe:t-6 I Oil , . ,..,. V Establish final grade VI' Fill placement inspection/continuous . V Soil Density , STRUCTURAL STEEL/WELDING: Sample and test (list specific members below) Shop material identification (mill cert) Weld inspection "" Shop Ultrasonic inspection Shop High Strength Bolting Shop A325 N A490 N Metal deck welding inspection Reinforcing Steel welding inspection Reinforcing steel mill certificate Metal stud welding inspection Concrete insert welding inspection Moment resisting steel frames " V' Field Field Field _F F Al!,l!,rel!,ate Tests Reinforcing Tests Tendon Test Mix Designs* Reinforcing Placement Insert Placement Concrete Batching Concrete Placement Installation Inspection Cast Samples Pick-up Samples Compression Tests x X V" FIREPROOFING: STRUCTURAL WOOD: V" Shear wall nailing inspection V Shear wall anchors f/ Inspection of Glu-Iam fab.. T/C psi ~~ C;Pe;t6 V Inspection of truss joist fab. t/ _ Sample and test components V' Fabrication welding.of steel accessories ,Placement inspection ,Density tests ,Thickness tests ,Inspect batching MASONRY 1J~: tOIAJ +7D'M!. ~I).JW ,1ltUGr7(~;L- Special inspection stresses used., f'm, f'g Preliminary acceptance tests (masonry units, wall prim) Subsequent tests (mortar, grout, field wall prisms) Placement mspection of units, and reinforcement Masonry, mortar, grout, and reinforcing steel certificates , ADDITIONAL INSRUCTIONS, OlHER TEST, & INSPECTIONS: Form CompletedbylO~'i ~~ Date "'/17/01. *PROVIDE STRENGTH REQUIRED BY ARCJllIECT OR ENGINEER OR CONTRACT DOCUMENT LOCATION OF VALVES 225 Fifth Street . I ' 4"- Springfield, Oregon 97477 541-726-3759 Phone r , of Springfield Official Receipt ...."velopment Services Department Public Works Department Job/Journal Number COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 COM2005-0 1685 Payments: Type of Payment Check cReceint 1 RECEIPT #: 2200600000000000642 Date: OS/23/2006 Description Fixture Sanitary Sewer - 1 st 50 Feet Water Line - 1 st 50 Feet Storm Sewer - 1st 50 Feet Storm Sewer Each Addtl 100' Backflow Device Furnace - up to 100,000 btu Air Handling Unit Up to 10,000 Vent Fan Exhaust Hoods Appliance Not Listed ~Mechanical Issuance Fee~ Sidewalk Permit + Addtl Sq Ftg Curbcut Permit Encroachment Permit Curbcut - Additional Driveway PW Disc - 2nd Permit (Street) PW Disc - 3rd Permit (Street) Sanitary Sewer - Improvement Appliance Vent Dryer Vent Gas Outlets 1-4 Gas Outlets 4+ Building Permit Paving Plan Review CommllndlPublic Plan Review Fire & Life Safety + 8% State Surcharge + 10% Administrative Fee Sanitary Sewer - Improvement Paid By BA YBERRY COMMONS, LLC Item Total: Check Number Authorization Received By Batch Number Number How Received djb 2003 In Person Payment Total: Page 1 of 1 11 :02:51 AM Amount Due 3,976,00 45,00 45.00 45,00 308.00 28,00 144.00 184.00 348,00 18,00 549,00 10,00 ] 01.60 80,00 130,00 80,00 (30,00) (30.00) 10,000,00 18,00 12,00 4,00 13,00 16,142,90 939.40 454,18 279,50 1,750.39 2,281.93 119,02 $38,045.92 Amount Paid $38,045,92 $38,045.92 5/23/2006