Project Name: Just Brew It
Project Proposal: Locate coffee kiosk on vacant site and associated site development
Case Number: PRE2007-00086
Project Address: 3545 Gateway Street
Assessors Map and Tax Lot Number(s): 17-03-15-33, TL 1100
Zoning: Community Commercial (CC)
Overlay District(s): Drinking Water Protection (DWP)
Applicable Refinement Plan: Gateway
Refinement Plan Designation: Community Commercial (CC)
. Metro Plan Designation: Commercial
Pre-Submittal Meeting Date: January 8, 2008
Application Submittal Deadline: July 6, 2008
Associated Applications: N/A
NAME
Moll Markarian
Ga McKenne
Jesse Jones
Jesse Jones
Gilbert Gordon
Dave Puent
PHONE
726-4611
726-4585
736-1036
736-1036
726-2293
726-3668
APPLICANT'S DEVELOPMENT REVIEWTEAM . >, '.'.'
Applicant Owner Applicant's Representative
Harold Morris Jennifer Matthews Revocable Trust Carol Schirmer.
Just Brew It 450 Ful Vue Drive Schirmer & Associates, LLC
3427 Quail Ridge Eugene, OR 97405 375 W. 4th, Suite 201
Euaene. OR 97404 Euaene. OR 97401
PRE.SUBMITTAL REC'O
_v-'1~t~Qtj
Revised 10/25/07
. .
TENTATIVE SITE PLAN REVIEW APPLICATIO~.
PRE-SUBMITTAL CHECKLIST
P.LANNING
o Application fee - discuss the. applicable fees
o Copy of the Site Plan reduced to 8'h"x 11"
Complete Incomplete See Planning
Note(s)
B] C8J 1 8 '/2" x 11" Copy of Site Plan
o Copy of the deed and a preliminary title report issued within the past 30 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property owner is required.
Complete Incomplete See Planning
Note(s)
Gill C8J 2 Deed and Preliminary Title Report
o Brief narrative explaining the purpose of the development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. The narrative should also include the proposed number of employees
and future expansion plans, if known.
Complete Incomplete See Planning
Note(s)
3
Ii01I
~
[gJ
Brief Narrative
o Site Plan
Complete Incomplete See Planning
Note(s)
~
~
EI
lEI
[]
[gJ
5
Prepared by an Oregon Licensed Architect,
Landscape Architect, or Engineer
Proposed buildings: location, dimensions,
size (gross floor area applicable to the
parking requirement for the proposed
use(s)), setbacks from property lines, and
distance between buildings
Location and height of existing or proposed
fences, walls, outdoor equipment, storage,
trash receptacles, and signs
Location, dimensions, and number of typical,
c;ompact, and disabled parking spaces;
including aisles, wheel bumpers, directional
signs, and striping
Dimensions of the development area, as well
as area and percentage of the site proposed
for buildings, structures, parking and
[]
[gJ
4
[gJ
Ii01I
L:J-
PRE.SUBMITTAL REC'D
""'.....,
.- -~- - -", .
Revised 10/25/07
.
>.
l8l
EJ
r;"'1
~
~
r;;;::I
taSI.
~
EJ
6
vehicular areas, sidewalks, patios, and other
impervious surfaces
Observance of solar access requirements as
specified in the applicable zoning district
On-site loading areas and vehicular and
pedestrian circulation
Location, type, and 'number of bicycle
parking spaces
Area and dimensions of all property to be
conveyed, dedicated, or reserved for
common open spaces, recreational areas,
and other similar public and semi-public uses
Location of existing and proposed transit
facilities
7
l8l
EJ
o Phased Development Plan Where applicable, the Site Plan application must include a
phasing plan indicating any proposed phases for development, including the boundaries
and sequencing of each phase. Phasing must progress in a sequence promoting street
connectivity between the various phases of the development and accommodating other
required public improvements, including but not limited to, sanitary sewer, stormwater
management, water, and electricity. The applicant must indicate which phases apply to
the Site Plan application being submitted.
Complete Incomplete See Planning N/A
Note(s)
[J
r;"'1
t;::J
Phased Development Plan
o Landscape Plan
Complete Incomplete
~ EJ
~ [J
See Planning
Note( s)
~
~
f':4
~
r;"'1
~
~
~
[J
f"71
l:i.jf
r;:dl
~
8
9 & 10
Drawn by a Landscape Architect
Location and dimensions of landscaping and
open space areas to include calculation of
landscape coverage
Screening in accordance with SDC 4.4-110
Written description, including specifications, of
the permanent irrigation system
Location and type of street trees
List in chart form the proposed types of
landscape materials (trees, shrubs, ground
cover). Include in the chart genus, species,
common name, quantity, size, spacing and
method of planting
o Architectural Plan
CorTlplete .Incomplete
See Planning
Note(s)
11
PRE.SUBMITTAl REC'O
~~~.. ~ D'?: :',
- - -.- -
- - :. ..:~
.... --....
Idl Jg]
Revised 1O{25{07
Exterior elevations of all buildings and
.
.
r:;mllI
lib
~
11
structures proposed for the development site,
including height
Conceptual floor plans
o On-Site Lighting Plan
Complete Incomplete See Planning
Note(s)
12
ill
rs&I,"
~
rn1iiiI
t!!t
~
Id3::iI
12
Location, orientation, and maximum height of
exterior light fixtures, both free standing and
attached
Type and extent of shielding, including cut-off
angles and type of illumination, wattage, and
luminous "area
Photometric test report for each light source
rn1iiiI
t=!il
~
12
Planning Notes:
" 1. Provide a copy of the Site Plan reduced to 8 1/2" by 11"
2. Provide a copy of the deed and a preliminary title report issued within the past 30
days documenting ownership and listing all encumbrances. If the applicant is not the
property owner, written permission from the property owner is required. In addition,
the property owner must sign the application form.
3. Provide a brief narrative explaining the purpose of the development, the existin9 use
of the property, and any additional information that may have a bearing in
determining the action to be taken. The narrative should also include the proposed
number of employees and future expansion plans, if known.
4. Indicate if the existing trash enclosure on the site will be used by Just Brew It. IEither
way, provide a detail on Just Brew It's trash enclosure to include screening, covering,
and piping to the sanitary sewer.
S. Indicate number of typical, compact, and disabled parking spaces; including wheel
bumpers, directional signs, and striping. Is parking to be shared with WaMu and if
so, will there be dedicated spots for Just Brew It employees?
6. Indicate vehicular circulation pattern with striping. Also, are there access easements
to benefit WaMu on the north and west side of the property for parking and
circulation? Also, does Just Brew It have easements to benefit it on the driveway on
the northeast side of the property for circulation?
7. Indicate location, type, and number of short- and long-term bicycle parking spaces.
8. The tree in the parking planter on the northeast corner of property has been
removed. Please adjust plans accordingly and indicate if it is to be replanted.
9. List in chart form the proposed types of landscape materials (trees, shrubs, ground
cover). Include in the chart genus, species, common name, quantity, size, spacing
and method of planting. Also, is site work proposed to occur on the adjacent
property to the east? If so, is the landscaping proposed on the adjacent property
included in the landscaping calculations?
10. How will the planter to the east" of the WaMu parking on the west side of the site
be landscaped? Please shade it as landscaping, as well.
.11. . Provide exterior elevations of all buildings and structures proposed for the
! 'development site, including height, as well as conceptual floor plans.
'~2. "Provide the location, orientation, and maximum height of ex,t;w.iP^IIiW1.~..tlxture~
, both free standing and attached. Include the type and extent dt'taT.r_1Vti1 (~IRtl~[)
cut-off angles and type of illumination, wattage, and luminous area,uJ:'r~,!id~ a
Revised 10/25/07 - ..., "
.
.
photometric test report for each light source.
Additional comments not related to the completeness of the application:
. The site is within the one to five year TOTZ for the -Sportsway wellhead, and on-site
stormwater management is proposed. Submit a DWP Overlay District Development
Application or a letter requesting exemption from DWP requirements concurrently
with the complete Site Plan Review submittal. Contact Amy Chinitz, SUB Water
Quality Protection Coordinator, at 744-3745 with any DWP-specific questions.
. Please be aware of the new SDC and application forms.
. "
. ~, ....H\~.t.... \,; j\'
.','.'1
Revised 1O{25{07
PRE.SUBMIlTAl REC'O
~.V\,:--'g"j'Q~}
. .
TENTATIVE SITE PLAN REVIEW APPLICATIOr~
PRE-SUBMITTAL CHECKLIST
Engineer:.Jesse Jones Case#: PRE2007-00086
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete
~
~
li8J
li8J
Incomplete See PW
Note(s)
I'iiW
~.
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing site
features including buildings, curb cuts, trees and
impervious surface areas, clearly indicating what: is
remaining and what is being removed. For existing
structures to remain, also indicate present use, size,
setbacks from property lines, and distance between
buildings
The name, location, dimensions, direction of flow and
top of bank of all watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
The 100-year floodplain and f100dway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map Revision
The Time of Travel Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Development Services Department
Physical features including, but not limited to trees 5"
in diameter or greater when measured 4 '12 feet above
the ground, significant clusters of trees and shrubs,
riparian areas, wetlands, and rock outcroppings
Soil types and water table information as mapped and
specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must be
submitted concurrently if the Soils Survey indicates
the proposed development area has unstable soils
and/or a high water table
1'iiW.
~
li8J
~
li8J
~
ti&15I
li8J
I'iiW
lSf1[
~."
~
~
li8J
~
1"/' .,
Revised 10/25/07
PRE.SUBMITTAL RECID
~w_~.\ .;~-;D~
;- ~ ; ;' " -;' . ;., .,:,; ( ,'" : : , .
,
.
.
o Improvement and Public Utilities Plan must be in compliance with the regulations of
SDC Sections 5.17-100, 4.1-100,4.2-100, and 4.3-100 and must include the following
information:
Complete Incomplete See PW
Note(s)
~
~
~
~ ~
r:n
ti]J.
EJ;~
,,",,;
.:.......
r-a
t:.J
o Grading and Paving Plan
Complete
r;;:A
~
~
~
~
~
~
r:n
EJ
Incomplete See PW
Note(s)
EJ
n
W
~
EJ
EJ
I'0j1
~
1
Prepared by an Oregon licensed Civil Engineer
Location and width of all existing and proposed
easements
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
public facilities
Location and size of ~xisting and proposed utilities on
and adjacent to the site, including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV. Indicate
the proposed connection points
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
Landscape .Architect where plants are proposed as
part of the stormwater management system
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size and location of stormwater management
systems components, including but not limited to:
drain lines, catch basins, dry wells and/or detention
ponds; stormwater quality measures; and natural
drainageways to be retained
Existing and proposed spot elevations and contours
lines. drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Amount of proposed cut and fill
o Stormwater Management System Study - provide four (4) copies of the study with
the completed Storm water Scoping Sheet attached. The plan, calculations, and
documentation must be consistent with the Engineering Design Standards and
Procedures Manual. .
. Complete . Incomplete See PW
Note(s)
~
Revised 10{25{07
l"';1
~
Scoping Sheet and attached St<KRil'Vi:<Imr. Jl<Kl1 l)ilp9!r11'lE\Qt
System Study rK!:.~UDIVIIIII'\I. KI:\" IJ
."V" .g--g1; --
-~-- __d. -
- " ...
- - >'. -
.
.
PW Notes:
1. Provide proposed amount of cut and fill.
Additional comments not related to the completeness of the application:
. The trash enclosure must be covered, hydraulically isolated and drained to the
sanitary sewer.
. Existing catch basins will need to be retrofitted with inserts.
"'t".
PRE.SUBMITTAL REC'O
p~8"'ai. :
" ,
Revised 10/25/07'
. .
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Transportation Engineer: Jon Driscoll Case#: PRE2007-00086
Applicant: Harold Morris
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete
See Transportation
Note(s)
None needed.
Copy of ROW Approach Permit Application
t?E3 ~
o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 A.4.. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic' from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, Metro Plan, and state land use and transportation policies and
objectives.
Complete Incomplete See Transportation
Note(s)
t?E3
[;]
Traffic Impact Study
o Site Plan
Complete Incomplete See Transportation
Note(s)
fS:1
~
Access to streets, alleys, and properties to
be served, including the location and
dimensions of existing and proposed curb
cuts and curb cuts proposed to be closed
t?E3
o Improvement and Public Utilities Plan
Complete Incomplete See Transportation
Note(s)
t?E3
lEl
[;]
r:J
~
Location and type of existing and
proposed street lighting
Location, width, and construction material
of all existing and proposed sidewalks,
sidewalk ramps, pedestrian access ways,
and trails
Location, widths (of paving and right-of-
. way) and names of all existing and
proposed streets, alleys, dedications, or
fS:1
~
t?E3 ',', '. 1.
PRE.SUBMI1TAL REC'O
~~~,~ "6;oY.:
-\ ow __"""
Revised 10/25/07
".--.,
.
.
I'M'I
~
~rn""
ii1ii1,'~'
7'7'"
other right-of-ways within or adjacent to
the proposed development, includin9
ownership and maintenance status, if
applicable
Location of existing and required tral'fic
control devices
Transportation Notes:
1. Clearly depict in separate map all the easements.
2.
Additional comments not related to the completeness of the application:
.
PRE.SUBMITTAL RFC'n
'!-~~m
Revised 1O{25{07
. .
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Deputy Fire Marshal: Gilbert Gordon
Case #: PRE2007-00086
FIRE
o Site Plan
Complete Incomplete See Fire
Note(s)
r8J
o
On-site vehicular circulation
o Improvement and Public Utilities Plan
Complete Incomplete See Fire
Note(s)
r8J
CI
. Location of existing and required fire hydrants and
similar public facilities
Fire Notes:
1.
Additional comments not related to the completeness of the application:
No additional comments
,,'
PRE.~~~MITfAL REC'D
:-.:-1-.g;.Ol.,
Revised 9/24/07
.
< \ . '1
.
PRE.SUBMITTAlREC'D
..,....1' .-
.... .
- --- - -...;
---"- -. 1 . . . ~
. .
ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR
PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable Not
Applicable
~ ~
EEj ~
~ ~
~ ~
~ ~
~ ~
1iJ ~
~ ~
~ ~.
~ ~
Revised 10/25/07
'..
Where a multi-family development is proposed, any additional
materials to demonstrate compliance with SDC 3.2-240
Riparian Area Protection Report for properties located within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
tributaries of WQLW
A Geotechnical Report prepared by an engineer must be submitted
concurrently if there are unstable soils and/or a high water table
present
Where the development area is within an overlay district, address
the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC 5.19-100 .
A wetland delineation approved by the Oregon Division of State
Lands must be submitted concurrently where there is a wetland on
the property
Any required federal or state permit must be submitted
concurrently or evidence the permit application has been submitted
for review
Where any grading, filling or excavating is proposed with the
development, a Land and Drainage Alteration permit must be
submitted prior to development
Where applicable, any Discretionary Use or Variance as specified in
SDC 5.9-100 and 5.21-100
An Annexation application, as specified in SDC 5.7-100, where a
development is proposed outside of the city limits but within the
City's urban service area and can be serviced by sanitary sewer
PRE.SUBMllTAl RECIO.
:~~\'-4j Q-~_~
.
.
THIS APPLICATION IS:
D COMPLETE FOR PROCESSING
~ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
~() ~~
City Planner
,/g(oS
Date
This is not a decision on your application. Springfield Development Code Section SA-
. 105 and Oregon Revised Statutes 227.178 reqLiire the City take final action on a limiteclland
use decision within 120 days after the application is deemed complete. The 120-day
. processing period for this application begins when all the missing information is submitted or
when you request that the City proceed without the information. You must indicate by either
signing this form or by submitting a written response to the City within seven days of the
date of this form asserting your intentions regarding the provision of the missing information.
If you indicate herein or in your written response that the missing information will be
submitted, then you have 180 days from the date the application was submitted for Pre-
Submittal Review to provide the City with the missing information. If you refuse to submit
the missing information, then upon receipt of the full application packet and processing fee,
the City will deem the application complete for purposes of starting the 120-day clock and
begin processing the application. No new information may be submitted after the start of
the 120-day period unless accompanied by a request for an extension of the 120-day
processing time. Upon receipt of a request for extension, the City may extend the 120-day
period for a reasonable period of time. The City may also require additional fees if the new
information is submitted after the Notification to Surrounding Property Owners is sent out
and a second notification is required or if the new information substantially affects the
application proposal and additional review is required.
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the lBO-day timeline.
-;I~~/,td~
Owner! Applicant's Signature
1- y - oJ'