HomeMy WebLinkAboutPlan, Tentative APPLICANT 5/26/2009
! of 2/ paces
1/
S-~ c- ~o G-\j-~ - O--S
: _ o. _ _- 0 . _. \ _.
.; ~ - ~- _ __ _ _ 'i _.
EXISTING CONDITIONS:
1. ALL DIMENSIONS, SECTIONS, AND DETAILS OF EXISTING
STRUCTURES ARE FROM FIELD DATA AND EXISTING
DRAWINGS (NOTED ON THESE DRAWINGS AS "REF")
AND ARE INCLUDED FOR INFORMATIONAL PURPOSES
ONLY. THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS FOR LAYOUT OF STRUCTURE. PRIOR TO
CONSTRUCTION OR FABRICATION. NOTIFY OWNER AND
ENGINEER-OF -RECORD IMMEDIATELY OF ANY
DISCREP ANCIES.
2. NOTE ANY EXISTING BUILDINGS, FOUNDATIONS OR
UTILITIES (BOTH ABOVE-GROUND OR BELOW-GROUND)
IN CLOSE PROXIMITY TO THE WORK AREA. TAKE ALL
MEASURES NECESSARY TO PROTECT BUILDINGS AND
EQUIPMENT AGAINST SETTLEMENT, DUST, VIBRATION,
WATER, WEATHER, FIRE AND ALL OTHER DAMAGE
DURING CONSTRUCTION OPERATIONS.
3. PERFORM THE WORK IN A MANNER SO AS TO MINIMIZE
INCONVENIENCE TO MILL OPERATIONS. ENSURE THAT
MILL SERVICES REMAIN IN OPERATION AT ALL TIMES
UNLESS OTHERWISE APPROVED BY THE OWNER.
DEMOLITION:
1. CONTRACTOR SHALL SUBMIT A DETAILED WORK PLAN
TO THE OWNER WITH A DESCRIPTION OF SAFETY
PROCEDURE,ITEMSTCfBEREMOVED OR DEMOLISHED,
ITEMS TO BE SALVAGED FOR THE OWNER, PR.OPOSED
METHODS, DUST/.CONTROL, TEMPORARY SUPPORTS,
COORDINATION FOR SHUTOFF OF UTILITIES, AND
COORDINATION WITH THE OWNER'S., CONTINUED
OPERATIONS IN THE PROJECT AREA.
H-PILE DESIGN:
1. GRI HAS PROVIDED GEOTECHNICAL CONSULTATION
REGARDING THE DESIGN AND INSTALLATION OF H-PILES FOR
THE ABOVE REFERENCED PROJECT. SEE GRI PROJECT NO.:
4784
2. ENGINEERING STUDIES. THE AVAILABLE SUBSURFACE
INFORMATION FOR THIS PROJECT ARE PROVIDED IN A JUNE
2006 REPORT BY CH2M, HILL ENTITLED, "TECHNICAL
MEMORANDUM, GEOTECHNICAL DESIGN RECOMMENDATIONS,
WEYERHAEUSER SPRINGFIELD INTAKE FACILITY."
. ALLOWABLE COMPRESSIVE CAPACITY OF 50 TONS IS
DESIRED FOR HP12X53 PILE SECTIONS BASED ON
STRUCTURAL CONSIDERATIONS.
.
. ALTERNATE PIN PILES DESIGN SHALL BE SUBMit t t.D
FOR APPROVAL BY DESIGN ENGINEER.
. PILE SECTION HP 12X53: ASTM A572 GRADE 50
. PILES SHALL BE Fit lED WITH TIP PROTECTION
. THE AVAILABLE EXPLORATORY BORING LOGS INDICATES
THE SITE IS UNDERLAIN BY RELATIVELY DEEP, BRAIDED
DEPOSITS OF ALLUVIAL SILTS, SANDS, GRAVELS, AND
COBBLES. THE H-PILES WILL BE FITTED WITH TIP
PROTECTION FOR ANTICIPATED HARD DRIVING
CONDITIONS IN THE UNDERLYING COARSE MATERIALS
WHICH, AL THOUGH NOT NOTED ON THE BORING LOGS,
MAY CONTAIN SCATTERED BOULDERS.
. ESTIMATE PILE EMBEDMENT DEPTHS ON THE ORDER OF
60 TO 65 FT WOULD BE REQUIRED TO PROVIDE THE
DESIRED ALLOWABLE COMPRESSIVE CAPACITY OF .90
TONS BASED ON STATIC ANALYSES AND UNIT VALUES
OF SKIN FRICTION AND END BEARING IN THE
UNDERLYING SOILS. ACTUAL DRIVING RESISTANCE OF
H-PILES INTO COARSELY GRADED ALLUVIAL DEPOSITS
CAN BE ERRATIC AND DIFFICULT TO PREDICT.
CONSEQUENTLY, A CONTINGENCY SHALL BE PROVIDED
FOR ACTUAL PILE LENGTHS TO CORRESPOND TO A
RANGE OF EMBEDMENT DEPTHS FROM 40 TO 80 FT.
. THE CAp.ACITY SHALL BE ESTABLISHED BASED ON THE
OBSERVED DRIVING RESISTANCE OF INDIVIDUAL PILES
AT THE TIME OF INSTALLATION. USE AN .AIR OR
DIESEL IMP ACT HAMMER DEVELOPING A MINIMUM RATED
ENERGY OF 32,000 FT......LBS TO INSTALL THE PILES.
PILE CAPACITY SHALL BE DETERMINED IN THE FIELD
BASED ON THE DRIVING RESISTANCE OBSERVED DURING
INSTALLATION OR SUBSEQUENTLY RE-STRIKING THE
PILES AFTER WAITING 24 HOURS AND USING A
COMMONLY ACCEPTED PILE DRIVING FORMULA SUCH AS
THE MODIFIED GATES EQUATION.
. GI:.O II:.CHNICAL I:.NGINI:.I:.K I- KOM GKISHALL UBSI:.KVI:.
PILE INSTALLATION TO MAINTAIN PILE DRIVING LOGS
AND ASSIST IN DEVELOPING TERMINAL DRIVING
RESISTANCE AND PENETRATION CRITERIA.
. A SUBMITTAL OF THE CONTRACTOR'S PROPOSED
EQUIPMENT, MATERIALS, AND METHODS FOR INSTALLING
THE PILES SHOULD BE PROVIDED IN ADVANCE OF THE
INSTALLATION FOR OUR REVIEW.
DESIGN CODES:
1. INTERNATIONAL BUILDING CODE - LATEST EDITION
2. AMERICAN WELDING SOCIETY (AWS) STRUCTURAL
WELDING CODE, AWS 01.1 - LATEST EDITION.
DESIGN LOADS:
1. LIVE LOADS:
HYDRO-STATIC: 14'-6" ABOVE BOTTOM OF WET
WELL WHEN CHAMBER IS EMPTY.
SOIL COMPACTION.
2. COMPACTION REQUIREMENTS: 98%
CONCRETE:
1. CONFORM WITH THE FOLLOWING ADDITIONAL CODES AND
SPECIFICATIONS:
A. BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, ACt 318 - LATEST EDITION.
B. SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS, ACI 301 - LATEST EDITION.
2. MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS: f' c =
4000 PSI
3. SLUM'P RANGE = 3" - 5" (BEFORE ADDITION OF HIGH
RANGE WATER REDUCER)
4. MAXIMUM WATER TO CEMENTITIOUS MATERIALS RATIO -
0.45
5. MAXIMUM AGGREGATE SIZE = 3/4" EXCEPT AT
FOOTINGS USE 1 1/2" MAXIMUM AGGREGATE.
6. ALL CEMENT SHALL BE PORTLAND CEMENT
CONFORMING TO ASTM C150, TYPE f/II. FL YASH
SHALL CONFORM TO ASTM C618, TYPE C OR F.
7. ALL AGGREGATE SHALL CONFORM TO ASTM C33.
AGGREGATE SHALL BE CHECKED FOR ALKALI-SILICA
REACTIVE CONSTITUENTS USING A PETROGRAPHIC
EXAMINATION PER ASTM C295. IF SILICA MATERIAL IS
FOUND, THEN TEST PER ASTM C1260, AND IF
NECESSARY ASTM C1293.
8. CONCRETE SHALL CONTAIN AN AIR ENTRAINING
ADMIXTURE, CONFORMING TO ASTM. C260. AIR
ENTRAINMENT SHALL BE 4% - 6%.
9. CALCIUM CHLORIDE OR ANY ADMIXTURE CONTAINING
CHLORIDE IONS SHALL NOT BE USED.
10. WHEN CONCRETING IN COLD WEATHER, CONFORM TO
ACI 306.1, "ST ANDARD SPECIFICATION FOR COLD
WEATHER CONCRETING".
11. WHEN CONCRETING IN HOT WEATHER, FOLLOW
RECOMMENDATIONS OF ACI 305, "HOTWEA THER
CONCRETING".
12. FOUR I t.ST CYLINDERS SHALL. BE MADE FOR EVERY
100 CY OF CONCRETE POURED. THEY SHALL BE
TESTED IN ACCORDANCE WITH ASTM C39 BY A
TESTING LAB APPOIN Il::.O BY THE O,WNER.
13. EMBEDDED METAL, SHALL BE 304 STAINLESS STEEL
14. REINFORCING BARS SHALL CONFORM TO ASTM A 706,
. GRADE 60, DEFORMED.
15. CONSTRUCTION JOINTS:
A. PROVIIJI:. ONLY WHI:.I-<I:. ~H:OWN, UNLI:.~~ ,WI-< I I ,II:.N
AUTHORIZATION IS OBTAINED FROM THE OWNER.
B. LEAVE A ROUGH FINISH WITH 1/4" AMPLITUDE.
C. CLEAN AND REMOVE LAITANCE, THEN DAMPEN FOR
AT LEAST 12 HOURS BEFORE PLACING NEXT POUR.
16. PROVIDE 3/4" BY 3/4" CHAMFER AT EXPOSED
CORNERS.
17. CON.CRETE FINISH:
A. CONCRETE TO. RECEI,V[ GROUT OR CONCRETE:
ROUGH FINISH WITH 1/4" AMPLITUDE.
B. ALL OTHERS: SMOOtH FORM' FINISH (FILL AIR
BUBBLES AND INDENTATIONS) OR TROWELLED
FINISH, EXCEPT TOP OF WET WELL (SEE PLAN).
18. PROVIDE MOIST CURING FOR SEVEN DAYS.
19. PROVIDE THE FOLLOWING CONCRETE COVER AT
REINFORCING STEEL UNLESS OTHERWISE SHOWN:
A. FORMED SURFACES: 2"
B. ELEVATED SLABS (TOP AND BOTTOM): 1 1/2" FOR
#4 AND #5 BARS 2" FOR #6 - #11 BARS
C. .CONCRETE CAST AGAINST EARTH: 3"
21. DO NOT WELD. REINFORCING STEEL EXCEPT WHERE
SPECIFICALL Y CALLED OUT. REPLACE REINFORCING
S I t.EL WHEN AN ARC ISCREA TED BETWEEN IT AND A
WELDING ELEC.TRODE.
22. LAP SPLICES: SPLICE 50% MAXIMUM OF REINFORCING
STEEL AT ANY LOCATION UNLESS OTHERWISE SHOWN.
STAGGER ALTERNATING BAR SPLICES BY ONE SPLICE
LENGTH MINIMUM. USE CLASS B TENSION LAP SPLICES
UNLESS OTHERWISE SHOWN. FOR LAP SPLICE
LENGTHS, SEE THE" It.NSION DEVELOPMENT AND LAP
SPLICE LENGTH" TABLES AT THE END OF THESE
STRUCTURAL NOTES.
23. FORMWORK SHALL REMAIN IN PLACE UNTIL CONCRETE
HAS ATTAINED SUFFICIENT S I r<ENGTH TO ADEQUATELY
SUPPORT ITS OWN WEIGHT TOGETHER WITH
CONSTRUCTION lOADS LIKELY TO BE IMPOSED ON IT.
WA TERSTOPS:
1. PVC WA TERSTOPS SHALL BE GREEN STREAK STYLE
#703 (6" x 3/16" SERRATED WITH CENTER BULB), OR
EQUAL AS APPROVED BY OWNER.
2. THERMOPLASTIC ELASTOMERIC RUBBER (TPER)
WA TERSTOPS SHALL BE WESTEC TPE-R STYLE #619 .
(6" x 3/16" RIBBED WITH. CENTER BULB) BY WESTEC
BARRIER. TECHNOLOGIES, INC., OR EQUAL AS APPROVED
BY OWNER.
3. USE MANUFACTURER'S STANDARD CORNER AND TEE
FABRICATIONS AT INTERSECTIONS. ONLY STRAIGHT
BUTT JOINT SPLICES ARE TO BE MADE IN THE FIELD.
HEAT SEAL SPLICES PER MANUFACTURER'S
RECOMMENDATIONS.
GROUT:
1. PRECISION NON-SHRINK CEMENT GROUT EQUIPMENT
BASE PLATES: MASTERFLOW928 GROUT BY CHEMREX
INC. OR EQUAL APPROVED BY OWNER.
STRUCTURAL AND MISCELLANEOUS STEEL:
1. ALL STRUCTURAL STEEL WORK SHALL BE IN
ACCORDANCE WITH THEAISC "SPECJFICA TION FOR
STRUCTURAL. STEEL BUILIDINGS" (AISC 360-05) AND
AISC "CODE OF STAND.ARD PRACTICE FOR STEEL
BUILDINGS AND BRIDGES" (AISC 303-05). IN SEISMIC
DESIGN CAJt.GORIES D, E AND F, THE PROVISIONS OF
AISC ,~41-05, "SEISMIC PROVISIONS FOR STRUCTURAL
STEEL BUILDINGS, INCLUDING SUPPLEMENT No.1",
SHALL ALSO APPL~
2. PLATE AND BARS SHALL BE A304 STAINLESS STEEL,
.EXCEPT WHERE NOTED OTHERWISE ON DESIGN
DRAWINGS.
3. S-SHAPES, CHANNELS AND ANGLES SHALL CONFORM
TO 304 STAINLESS STEEL
4. RECTANGULAR OR SQUARE HSS SECTIONS SHALL BE
304 STAINLESS STEEL.
5. CONNECTIONBOl TSSHALL BE 3/4" DIAMETER 304
STAINLESS S I t.EL
6. FILLET WELDS SHALL BE INSPEC It.D BY VISUAL
INSPECTION.
7. ALL FULL PENETRATION WELDS SHALL BE INSPECTED
BY ULTRASONIC MEANS.
CAD DWG - DO NOT EDIT MANUALLY
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: OB70B-IP-009-P1
~01JV'-
A ISSUED FOR PERMIT
19MA.YOO owe
NO.
REVISION
DATE BY
3R =8 - EARSfTHORNTON
ENGINEERING CONSULTANTS, Ltd.
21268 Hwy 99E, P.O. 370, Aurora, OR 97002 Ph:(503) 678-2434
Fax:(503) 678-5683
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
GENERAL NOTES
SCALE: N.T~S. DATE DWG. NO.
DRAWN BY: owe 12MAR09
CHECKED: D 022091P
APPROVED: SHEET#001
CUENT INTERNATIONAL PAPER
tl\4SGJ MILL WATER SUPPLY
. ~j(rNrICr 801 42ND ST, SPRINGFIELD, OREGON, 97478
REV.
A
REV. DATE
2- of zl tn~e.S
CAD
HH:MMAM
PLOT XX/XX/XX
.... DO NOT EDIT MANUALL Y CAD NO: 02209-IP-002-A
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
REV.
S
BY. DAlE
1 -20 DATE DWG. NO..
o 022091P
~ SHEET 002
WENT INTERNATIONAL PAPER
D\B:N Mu.. WATER SUPPLY
801 42ND ST. SPRINGFIELD. 97478
02209-1P-002-A
:
CX)
""'"
36" f/J HOPE 36" f/J STEEL
.. :;:
ASTM 03350 SDR 32.5 ASTM 572 GRADE 50
or--
r-...
I
..
or--
.. (i'20"f/J DISCHARGE
'-
_ n
(0
or--
""'"
t")
~
1"'"
....
~
/~~
<0
~, li'.20" l& DISCHARGE & (.
" L36"l& FORCED MAIN C )
~-
N
. . , .1
Co
~-
~
'~ (i' 20" (/J DISCHARGE
i...
. .
,j
'0
I
i-r>
,
Ii
N
I
Co
:
~
I
ro
~
-,
N
I
(0
, ,
""
b
I
i-r>
.-:
31' _6"
27' _6"
Vc 6"
.~-_L
....
.-:
....
6' -10"
12'-8"
.-:
.....
.:.a. ;:1/: .
'. .
. .
.~. . ~
. .': .0 ~'.
44 . ,.' '"
'. ': . . .~
.. .:~ ~:
: .. .
'I-. :.,,~ '.
. ....
:.. ~/' ::.&
.4 .
L~
/
,,-- '7
.... :r '~r!!II'
. . ..
II' A
:. . ...
. . '1 '.,. <!.
. '.';' ~.. . .
. . ...
. ..
....... . ~.
. ~ 7,.s".
. . . . ~
...
4 ~'::. '
.. .. ...
; . .... .:. .
.: ......
. . <I
~. .' ..... b
. . .
/" "
:"'. . : '.r",
. . .
, A:. . ..':r
~. A ....
. ..,
. 1>... :
'.
4 : :,...
"'. ..: ~...
i ". .
.........
w
.....
<(
C>
W
lL.
Z(I)
~~
: .-'
0<(
N>
2'-4 1/2"<:~
\
'"
..........
(I)
w
>
a::......J
w<(
l1...>
<(~
3:0
.. w
b:r:
NU
<:~
:I:
(.)
(j')
o
t-=
a::
w
>
(:)J
(I)
0..
::2
::>
0..
(::.IJ
Ww
9:.....
0...<(
-eC>
: W
0.0
<0_
-'
s;~
~3=
<:)J
5'-6 1/4"
3' -2"
..
.... .-:
SUMP PLAN
DETAIL (1\
SCALE: 1/4"=1'-0" ~
5' _5"
.-:
27' _6"
...
14';.....10"
.-:
...
6"
____f2
6' -10"
.' ",. a 11 . '.. .: '. 4. .' .'.. '" .:-. 4+.. . .~. ." . ~ . 4 ."'. .. Ail : ~ 4 !-..
" . . A: ~ . . .~ ~ '. .. A!~"'~ . A.. A 41 .1.....4 .~,A. ... . . " ". '. ..... ",& 4.' '" . ....
, ~.:. ::. ."'.... ~: .': ..~.: 4.~..}:...4. .:.:'.:. ...~:.. ~:........ . ~'.' '. '.i :~."'.. ': '" iA4. .... ':.1.. .. ,. . . . '" ... . . '" . .
. . _'. . .. - 4' '.' --:- >.":. ". 4~::"":::: 4. 'i:;' '.~. .i. './~: .:': '.~ :.~. ,;: 4 :'. '.:.~ ; '::.-' ~ .,'::.", :" .~.: 4. ';''';'/.; :... :.~.~ ::. ~~
:. :~'~;j SLOPE.. \ ' .. / Lf ,~"'.~. .
i.~.'.~:~: ~))......(1. e_..~ - SLOPE i:\~~~
. : :~'.~ .. ~ > . '.'~. . ""
I "'i-- ::: ;',/'..;'
\ . . /.
/' -..,
("...... ... '.. ~\-
f "'t --
. /:~
~)~t(~~~ A- - SLOPE
SLOPE __ I.~"". ..... :. .:A.~ ~. ~" )'.~
. J . ...~ '" . .... . '. I
~~ L. ';; ~. .~~. ....~ ~~ .~: :: ~~. .:~;::~ ~':. :.~'~' }.~'Y" ..:~r', ~~ a~ .:~ ?... ~: ~ . ::~. ~~~. ~ ::.: .t..: ;:. ~~. :(~. : ~:.. '.'(~. .~A .
r .:. :.'
. >4 .
'",. .",
'. : 4'. .
SLOPE
....
..... - ..
. .. .
. "~.: :
o' .& ~ ..,
. .4
.. .,"",,! ... to... ..
A ': !,C N
'. . """',
.... .: or--
.' . ."
.~. .: t")
:"":.' I
'.:: ~f'.', N
a. ..:.:. . b
A ,."
.._.. .. .."" 1ii
SLOPE
<i.: :
4' .
.. ..
" . ..,
.. :..
-
.
"... 41
.., ~
.&. .'
.... ...
. A ".f .'"
SLOPE
..
.. ......
. .
~'.: ::..:. ~
. 4"
" .' '" . .
. '.
!' . .
:. ,:..... ":
,.::' ",'.. ~.
:,'4 '"
" . .:'... or-
'A '.~
: c' 0
~. ;....
. ., ... '
.,4'
.... '
.:.
SUMP 80 I 10M PLAN
~~~~~~'=1'-Oh ~
.....
i i
,
, l
N
"
or--
A
(0
or--
"
. t")
'0.
or--C>
IZ
.. 0..
t")0
.. .....
t")
I
N
"~"
<0
I
;r ;r 'i
I
N ,i
N
.
N
"
N
Jl"
or-
b. .~
or-- C> I
I g: ..
i-r>o~
;r
I
N
N
t")
I
N
'"
~
~ n
N
"
"
or--
Oci
~z
J.. 0..
~o
,
or-
I
..
or-
11
,
"""'-
~
i I
,
END IEXIST PIPE
(FIELD VERIFY)
I.E. 456.61'
CUT EXIST. PIPE &
WELD ALL AROUND
TO NEW.
-
,g
0-
=00
10
i-r> I"
"N
'~ ><
, .ci
jz
0..
bO
10
i-r> I"
're...
~x
.ci
~ Z
0..
o 0
..........
~3' MANHOLE
~
f:.3' MANHOLE
~
I
(0
~
,1
, S007
~3' MA OLE
,
il
'0
I
to
5' -1 O~
fi",
~7
.-:
...
9' -9 5/8"
3/4"f/JDAYTON SUPERIOR T-1
SINGLE PICKUP INSERT /. NEENAH R--1578
TYP OF (4) PER PANEL . .. . MANHOL.E FRAME w/UD
.. TYP. OF (5)
/
/,..."."'"0000000".."'0"'.0"..0.""'0'"00.0........0.""
j
o
o
o
o
(I)
C)
Z
::::) ,
Lr..
~I
LLI
.....J
~
Z
<(
::?E
~
B
o
~i~
o
f)
o
o
C>
::>
....l
C>
Z
F
lL.
:::::i
<:......
<.D
:::>
-1
<D
Z
F
lL.
::J
C::lJ
:'~'-8
l/tt 2'-10",
;.. . - .1
8' -4"
REMOVABLE PANEL
8' -7 1.1/16"
OPENING
31'-6"
3/4"
, 1(,li<.--rrP:
j
..... ! ......-
--
-~ .....
liD PLAN
DI:: I AIL
SCALE: 1/4"=1'-0"
(2'\
~
...1'"''''''''''''''1''' il
i-r> ......J
..I ~
~UFTfN<l lUG N r ~. t.
::" "w
t") t")-,
I roCD
,~UFnNG LUG ~l -:, ~
t") W
I a:::
~l
i-r> ......J
I w
~LlFTlNG LUG....N11 ~
1::: .. : C>
i-r> en w .q- Z
I I ......J ..I Z
..mow
~LlFTlNG LUG N~ <0 g N ~
::L ::2
t") W
I a:::
I ):~
I'-'-/'\..-. ~UF1NG LUG ~, · ~
~Cl<'/ · I ~~
<-t. r~. J <Xl In
-../r.1. '0,C~~ . /~UFTING LUG.~ .a:....~ ~
,,~~ ~ ~ Q:
~.\..~a~ ~J/L
./
1 '
'0'
,g::
.. .....
or--
ji
10' -5 1/2"
.....
13' -0 5/8"
\!lAX' vlU v1 SA-::~ ~ V~ ~ WA ~-::~
SU v1:) 'S2r57~-8~.
_:V~_ -::O~ )~y
B ISSUED FOR PERMIT .
A FOR CONCt:t" I tJAl REVIEW ONLY
19MAY09 owe
28APR09 owe
~ ::
. :. . . I 0
.. ,or- .. or--
. ,:...: I t") I
jilt ~. ''::''~ " "J -;... "'i :
.' . '. ... .
"')':"':':- ~~..;..
, .... ... 4- t .
::III.....I~.. .
t', A . .1.' '; '., ..
.~ ..
NO.
REVISION
DATE BY
BRESHEARSITHORNTON
ENGINEERING CONSUL TANTS, Ltd.
21268 Hwy 99E, P.O. 370, Aurora, OR 97002 Ph:(503) 678-2434
Fax:(503) 678-5683
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
PUMP SUMP LAYOUT (WET WELL)
SCALE: 1/4" = 1'-0" DATE DWG. NO.
DRAWN BY: owe 12MAR09
CHECKED: 'D022091P
APPROVED: SHEI:.l # 006
CUENT INTERNATIONAL PAPER
fNSGJ MILL WATER SUPPLY
J ~/<nJT/lCf 801 42ND ST. SPRINGAElO. OREGON. 97478
REV.
B
REV. DATE
28APR09
TIME: HH:MMAM
PLOT DATE: xx/xx/XX
CAD NO: 08708-1P-009-Pl
CAD DWG - DO NOT EDIT MANUALLY
(p of' 2./. paJcs
b
1
00
I
. 1
-=-r
'f T /PLA TFORM
REMOVABLE AS REQD.
~ A
L ..
r-..~
..........
~
I
:q.
, .-/
A ~ A
o
I
~p
j
o
~
I
~
C"4
,
0'
I
C'\II!
l
-I
.. ,
b
~
I
Nil
w
CL
O:w
Q~
b0
<Ow
o
""=:::::i
Cf){/)
x"-
w~
<:::iJ
1
~
J~
...- '"""
/' "-
I
-"-' u" t.- . . ~ .J
+- ' '", ... . '.., \ .. ..~ .... ". - .. iQJ
t.'.... ~.; ..) ....... .....:....~ :..<." .
\- ~ :'::.., .~- ::.;..' ~ .', : '. . ..... ,."r-
'" ~ :' . /. . '. 1
-11.,'1;.';E~~~r
:>~.. ':,' ""'U- i' . I T
t:':::':'~i)
-,. ..
:.... '. . Ii"
"".'" ..... ..: i
j]
.... '
. ",!. .."-
. . . '4'..'
Ii
Il
.~ :' :,!.
II II
. . ....
,;. .~. . .':"
. :.~.... lit
W
...J
o
:c
z
<(
::a:
~
2 1/8"
\
~,. .....-
· .' I
. "'~ .:... .,,~
- : ...~, ..... ..~. .. .. "',
=J.~'..' . ':.;.:\ ..,., - .
~. ' . "
I .t:::~"..! .':' ;
:, ..
\ --'"
..
;l'l:
~(II- ~~ .~. .
- - .."
'. ..tt' .'-
-II "'
-t'...;. '.
n '. . .'
-I /'.' :t'
:;;a.. .... ..
'""'..
~. .. '..
. . , IS.
'. ..
..-1,
,". :~
c ". ..'
:. i.. :
'~.. ~;: (
.'.
2' -0"
TYP.
.: ..
. ~~ '. :
~;: .. ~. :'
'. . '.
....... . ~ ~ .. fl. t
. A'
~; 4. "
....
8' -7 11/16"
REMOVABLE LIDS
7' -0 1/2"
.....
....
(/)
o
z
::>
0::1
~
W
...J
o
:c
z
<(
=:E
~
[. 1/2" x2" ,GROUT RING
. . GRADE EL 477'-0"
~ 1
o
I
""'f
l
\
-
....
8-'- 7 1.1- /16"
REMOVABLE UDS
7' -0 1/2"
-
.....
......
~: .... if ,
......
.. .. '.:
.. .. .... .. t
,,::'. ,
:T
; I'
f &.: .....
.. I
J" ~.. A.
. ~ . ':....
. .'
Ii.. : .
:':- : .
. ....
, . '.' '
. '...
. . j.
SUMP SECTION
SECTION ' I1f\
SCALE: 1/4"=1'-0" ,~
I ) .
I f
I f
#8 @ 10" E.W.
TYP. EA. FACE
J I
:11
-
~
1
to
~
~
~
..........
,..,.,
t.O
_I
Ci' PUMP DISCH.~" ·
l:: \..
B/PUMP BASE
EL 455'-11 1/4" t .
#8 @ 10" E. W.
TYP_ T&8
I,
B /FTG. EL 453'-2"
GRADE EL 477':f:
,r
I ·
I .
.. "
b
b
I
""'y
I
""'y
'0
1
00
~
I
r-..
,
ii
;r
1
f'
,
b
~
~
C'\I
=Ol
I
""',
-,
,
. i
w
--'
o
:c
z
<(
::E
ir>1
r
W
...J
o
:c
z
<(
=:E
i01
r
UJ
...J
o
:c
z
<(
::E
i01
r
<0
I
;r
b
I
00
,
. rill' . . J
~ " 4'... "<4ll.~ .
'.' .'
l ~' -... .., .1
~ ~'. I~ *: .~~
, .... C A :. ~
I:...... ..' ~'l
,.: : ~
,
i
b
~
I
~
C'\I
~I
..........
~
o
I
, 1-0, ,
..~' . .J
'. ~:. ~ =r,
. ' ,: :.: .:...... ('f'
. .'
. : .~.~... :'
.. .. .... ..
.'
.~." .
~.
.. ..... .
... ....
\. . '
.. .. .
t... .. 4 I .
:<t". ,1
'. ."4
. '4 .'" .....
.4. .~: '
_. ..: 4.
... ....
. . . 4
'. . A .
. ....: .
~ . :. .
,.., . ...,4'
If :'. '
~ . :. .
4 .
, A . . '. '.
, ....
:4 . .. ,..
~... ~ .~::.
~
'. -:. .. .. '". .,
.,.
:,..~ :. ~ ~J
';.4 .4.
ADDL. /15 VERT. TYP.
NS&FS EA. SIDE/OPNG.
ADDL. #5 EXTEND 2' _On
BEYOND OPNG. TYP. AS SHOWN
~ . - ... --..
.. .... . ,': ... '. ... .. ''!
. , 1 .' .
. '.:', . '. ;..,," . j ;.: .~..:
.- "'. ...... J . ~. '
J . A .. ...4 ' . '. oil .
, ' i . .04 )I
1 1
,
. ..': .~~' ': :;..~ ::4 ~;:
<0
I
:q.
.~. ::4"
l' .
, ~." f..:-' ; :
J '.
". .,.
~ --.. '"..... .:...
. !' .'
. ..
, ; '. ~.,
.-' . ...
.-. .." ..
~t
(/)
C)
z
~
0::1
2 1 /8~
J ~
_ ..... i .....- 0
:c
z
<(
:::?:
" ~ ,. -
, ~. ,. -.. d" .~ .' "0' . .-.," ..
l" .... ." " .. .., ,. .. . ~. ". . .' .' -,.. ,'w.. .'... ,. ~
1~.~' .IIi. ~'~"~'A 1'.":.,tI,,,.",, .....: ... ,'"""..". ,'...: :.~.:......:.. ..,;:....: "~., _
'.' ..... ::::::a t/~1a . I, . +A'. .'. 1:.' '. : '..11 :. ,..;':' .ii-
_ OJ.,' - . .. ' 1 f'.. ... .. "~. .. L.. -.. . . . .. ' '. ..... . l' .
.... " . I ' ~ . ' .1"" .' ~ . .. ..:' .... ;I
L~)(. .)q .: 00 . ':' )."::
~/"~ I .
.~.~ - ~I-~~...... . ':,: I." .~.~.~.:~~,
.j;" . ---: ...'\.....r..... ----... . ... I: ~...' .::' IT
1 - \ ' ... . .
.. : I ..........
L ;REMOVABLE GR G.~ '. ...... T/PLATFORM ,
II. : ". -.T.' . Ii,.. r.:J I I J; /':~:RtMOVABLE AS REQD.
,-1 ('. . '.'
t I '::1:.' :~ <
~j t I
I I
I I
I t
t I
I ,
I ,
. I
. I
I .
I I
I ,
I .
I I
I t
.
.. . ~..., ...... .. '-'. - .
...... ..~..:.~ '~,~.f.t.{.S.:"r..f:-~.{.~:.~.~~.;;..~~.~.~:~~.;.:3.~ J..:. "~'=". . ><, -. -.. ~ ;. U ~
.... * ...~_......~r-....".......... ;;-,~~:- ::;... -",---,.: '"';;- .. I. .. 1.11...... .1~....ldll "1\ )) . \ " __ ~:,_,.",.-,;;~"",,,''''.'.-.~l'.::.':=;. ~,.,:~~.~..:.._;:~:...:,.:.._:.~.:.:.~~.
-...;..~.iii;.;.~~~.j.s.~-~...}~..~:~:::..;f:..:.E:~.f.::.l:~;.~!. ::~~:: ..' .
! . :. ;~.;,;.~;::.:.:-::....:;....;:~:...:...;::;~~=!.':?~i: .....:... ~ '. ~ ". _ ". -. - .' ~.. .. '. - -. - - __
I .. l' '\' 11 " 'to I' 'f' " 'I., . " . t.. ",.4., ," A. '! 1;, ,'f ., 'I ''', " ... "-C 1 1: or' r '.. .
4~'..,. ." .......". ., ':. '.. 't. ..... '. ..... .... ..... .' :-. .... '.,. .... ...... ..' ~ '. '.' '. ...... ..'. -
. . .. " ., .... 1" A .... . .' ... . ~ t .. . ... " .
. ..1 ....~ :-.~'. .~. .,: "..: ~6. ; ~~.~ :.- .t., c:'! Y;. ~:.::. :~: ~:' ~".:/:'- ::,":.~:~:' '...~~ ~. .:~ ......~ ;.:~ . .~: _:.~: '~.i .<.~: ..:~ .:. ~ .": ~.I&:~. .: ~ .'. ~'.
..~~~..., _' /. ~' ~.~ ',.,'~
"-,\5
.~
C'.4, 1
'.
. ..... "
"~. : .... : !
J
~ .
-. '"' ...IJ;.
..."'" .: ...c
....~.:. ~:
.* :" .. eo.
.' :..
"h. :.ti:
~-t.A ..... ~
. 04
.. '"......
..: ..A.... ~
..''1 ".
. .... ..
'. . ...
~~ .'
j .., '. : 'r.
~ " f
,...~..I
FLOWABLE FILL LINE
.~o . .
-
., " -. ... ..' 4. ~ .,~
.... ,.
._. ....14.' .._..""-
SUMP SECTION
~;~~~~~'_on ~
W
...J
o
:c
z
<(
:::?:
i0J
r
W
...J
o
:c
z
<(
~
~I
r
t... 4:.. ........i,. .....~. ~ ..,...... . ...;;... ....:". f
~ '.. 0'" ~ .. '.. ..4 . ." .", 0'" '\" .. ... ", .. IIIIil
. '. . ..' . :. -t .. :~ '. ' .: .' : ...: .....
r .:' A . .4, '4.' . . . ;4:. ."4.. :fI6.., 4 "
I..'" .~" .'.;'.' .... ::t . .. ..... '.:" - .... :-., '. :.-l
L . .'~... . , I
'=t, .: .4.;
, :" ~. ':
I ' :' . '.:'. ,I I 1
I .,' 4:,... '1
.L.~1.~1 :;....;..~'II
. ,.. .:4., : 4 I
. :1'~'''' '.;' .
J1 ..:.)<
~ :.:'~:
. I ..
.. , f; ..... '.'4 .~~;
. t II . .
'. JIo' . .
II '..:,.'.
III ;;~. ~..'
..,. .'
II ....., ~
II .~. :~. -:
-. II: :",' ;..
I II ,4 ~.: .,:
~ H '1,,,: '~:,
lIP. ;..Jl, ,..j.,. .
... .
~ . ,- .:
~'~
'If II
I
I .
I
'- /' l:
~= :r:,Y
ti
. .
.j ~'''.~..:i I ..-. I
. r . .: 4 ' · : ~"~'", .";
.' 6". It,. . .
.' .. . I ~ .. .1" . .
'J. . . j-'- - t4.'.'
k ~"~ J . , I' .:i i-
t.: : i J 'l= :"'-~I'"
f '.. . r i . . ..
-{~;~4..l~I:.~ ~~~~~1\rj~!~~x:~~I~:fr::~:.r1~~~;~~:~.:~~:!::. :.l:~': ~:
SUMP SECTION
SECTION ( E,\
SCALE: 1./4"=1'~O" ~
.. I
b
I
c....,
r'/~ '~
1 ..~...l
-4. --~-"'h-
.k' .. 1.. -.~.... t
.. '*)'" . I., ..,.-...;.",
.. . . '. . '. : ~o..,..,......- ..... 1\." '. .....
. :"....i.. ~ 1\.. .. '. . .... .!" ... "~. .:. .... ~ .<<.. . ."~ ti .~ . . : : :~. .: .~.~. . . ;.. <re..
. ~. .~~:(~ :-:;:. L. r ~}. ~:~: 'i< :..~ .~. ~t:~... ~~'.' ':.~ ~ :? !~. ;\..~:.::. ~ .:.: ~ ~ ::~ :~:. 7 ~ .~. :.
, . ~ ..~~"
b
1
ex,
, . '~:
,
..." .~ ~
,...,. ..
. . .. .\..
.. ...
.'
<":; .: .:
:~.4 .'. "
...
" .
'I
, <If/. . .
.~
. ..
.......... ........ :
, ':" . i,,'
, ...
:: ':,.' .~:
'.. ..,......... ~
~" .'.s'.: .)
.: ." .
~:"'. ':: '
. . 4 .
.~.~. '4;;'
=0
~
r
w
CL
0-
..$1
o
~
w
CL
a::
= ..$oJ
o
~.
w
CL
a::
..$1
,
. .
. ... ...:
. .'~.
.; . ~: .
. '
~" <.:~. ,i
..
~
C'\I
o~~ ~:"4f
. ~ . It.'. .'
~~.:. ~:.~
.~::- ;.~
'.
~..:: ~.7 .
~ A. 4
".4":~
. '"'..
. . .. . . ,-
'.4' :
. ...: ,-
~ ..... . I
. ...
.: ....
:. 4 : .
. : . '.4..
.,f
",'. .'
~ '''''4 ":.~ ... .
: .:' ..' ..' .' ~
. ..... '~.' ,
c," . 4'..
I. ' " 'lrl~ :.'. ~ :,"
tX~: ~ ,.... ~
~~ 'i:':
. '.'''' '>I~ ,t.;....".
; ! .'. . .....4 l . . .
~. :
, " " ! .~
6~: .4.1 "j.... -.
,I ..' f "t'",... '.'l- ...-.' .. .1.... r"';'1 ......" '."."f .. II' "" .. .,.' ,,,A,,, .-7, ,J'...':'
';; '."'. ~;:; :' ;..": .\ ~:~ ~> >= : :'.~ :./:.: ~~~..'.: : '~ ;':', -r ~ " ::: '.~ t ~., \ . .~<:~ < ::~'./ .:"~:fo~ "~",: .",
.,. ..
, ~"
." .
, .. ',,'. .:-.'
. .,..
1;. :~~...
~A
..........
~
o
I
,.. ! r
,..,.,..
. .', j,'J'f ..", ii
--
'SUMP SECTION
SECTION fC\
SCALE:l/4n=1'-on ~
..~,. .. .. ..
.,. .!....... ..
. .b. .
. . ./
.. ... '-..
'I\..~
a
I"~
:l€: -. '.'
f )..:,
~ :
GRADE EL 477'-0"
ORDINARY HIGH WATER
EL 472'-0'"
TYP. SUMMER WA TER LEVEL
EL 468'-0"
DESIGN LOW WATER
EL 464~-1 1/4"
s. .
E~SnNG ASH SCREEN
SCREEN STRUCTURE
~ -.............. --
'E~p. u>/~O{2Df 0
^-'~fg,~
r
1<
TIME: HH:MMAM
Pl.OT DATE: XX/XX/XX
CAD 'NO: 08708-IP-009-P1
.,
CAD. DWG - DO NOT EDIT MANUALLY
B ISSUED FOR PERMIT
A FOR CONCEPTUAL REVIEW ONLY
NO.
REVISION
3 ~ =:5 - =:A ~Sr~-iOR \j-.O"
ENGINEERING CONSULTANTS, Ltd,
21268 Hwy 99E,P.O. 370, Aurora, OR 97002 Ph:(503) 678-2434
Fax:(503)67~5683
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
PUMP SUMP SECTIONS
SCAlE: 1/4" = 1--0"
ORAWN BY: OWC
CHECKED:
APPROVED:
. ClIENT
[N~
~/<XN1Cf 801
DATE
12MAR09
DWG. NO.
o 022091P
SHEt.t # 007
INTERNATIONAL PAPER
MILL WATER SUPPLY
42ND ST. SPRINGFIELD. OREGON. 97478
7 of 21 paces
I.....
19MAY09 owe
28APR09 owe
DATE BY
REV.
S
REV. DATE
28APR09
fI3 HO:P. TIiS @3>>~1,~.... ~;
13' ..~ ,,:_1
13
_L
9
13
3
13
9
N
'r:i
~ --I
~o
,l !5!
WwO JI
. --IwO)
o ~ (fl<<C
.1>--1 _
-Ow
~zr-: II
w<Cw
l~ 0- 0
j ~
(:)
.J
-
~
, .
-!:J
_0
,
,x c..
~J . ,~
1'9
<r7~.
#4 @ 18" ..J ~. J
TYP. T&B . J
19 #6 @ 6" ,.:r.
TYP. T&B ~': J
-,~:' "
.'~ J
13
9
v -=-W 3-3
.
. -
-- -- .-.. - '.....- -
.I
.. a.:
",,>-
,f-
..- .
~
- --I
o
w
:: ,
o ;l
1
~1! ,
1 .
0-
r
~ .f-
, .
r-~
..-0
, I
cr Al
(0
, !
#4 @ 18" O.c.
TYP. T&B
Ji#6 @ 6" o.c.
TYP. T&B
.___~_-"-"I_ f!:~H~OP,~E:.~ 3>>
r EXPOSED AGGREGATE
;i ,FINISH TOP SIDE ONLY
3" 2"
CLR.\ /CLR.
--- --""-
- -..-_-....<-af
.. --- -...... - - - -.. _0 I- -.' '," I- _ 1-_"_-
, ,
I- = 'r.- . -. -..
. \
~.~,
.4 - ":---r~
....
v =-W A-A.
8'=-4"
4' -10"
,.. .... ..
.
*, '
, .4- ·
-
l' -9'r
1'-9"
:' ~ .~;/
'~<r l-
. "~-
." ~~~1
/' "~
- . " .4 .
.... .' -
3
..........
,
...
I II I I
n: ! ,;, jUT"[11r-, i.;rrtf! - :
: . !-1i-~,. i-~: ":+"'~r :
.1' t< ..._.............i -: " - -
. - , "-"',' .. -'," - I -,
I I ' . I I
., -', - - - - - - - .... - - - -
Ii, '.'.. '.,J ~.. ~
I LUff! ~JA
i-!+ ~
1-_' .' LJ.;. ILL I J
I I - , ~ ~. . I II I
I. _ _ _ .L _ _ _ _ _ ,.. _ _ _ _' I I _ _ J ,
I I . I, ". I I
:.... JIII-f-- :', 't ~. ....~. '~'illfm'j: .... '-'&..f'rn'.o'-~' .~ 01 ~I
I 'I I." I, I I I
I ,.1 r.. ' '.. I ~ I-i- f. I. ,0' I. '~, J, I ',= ': I
~ fft I ,I UI' . 1 i L ~ i · I Lf
I \ I ! .I . 'I J- I' ~! I.L.: I"'-Jl~ HOOP TIES @ 3"
'I I II I I '\. I 'ft"'-I
,,--.-, : ----.+----.-+- ...---- -~...
.-lIII ~ #4 @ 18"
3 TYP. T&B
(0 0-
I <C
~ --I
~
. ""
'~ .
" ,4
, .
, !
,
44, '
"":-""-
A._ ~
4' . 0 .
,-4'
<1
REIN.DI:: IAll
DETAIL (2)
SCALE: 1/2"=1'-0" ~
. #6 @ 6"
TYP. T&B
REMOVABLE PANEL PLAN
DETAIL (1'\
SCALE: 1/2"=1'-0" ~
9 5/8" 1/2"
- -
') 13/16"_'-
--\ '-
SEALENT
3"x3"x3/8" BENTS.S. PLATE
w/1/2"f/Jx3" WELD STUDS @ 2'-0" o.c.
#3 HOOP TIES @ 3"
,#6 @ 6" T&B
. #4 @18" T&B
2' -0"
-
,..
--~-'...........--~-
~':-1' -. ---~",.-a..c
. '
<J
ii'
<J
~
fj.
EXPOSED AGGREGATE
FINISH TOP SIDE ONLY
. #8 HORIZ. @ 10"
TYP. EA. FACE
. #8 VERT. @ 10"
TYP. EA. FACE
, #8 DOWELS@ 10"
W/~IU. HOOK BOT.
TYP. .EA. FACE
, #8@ 10" E.W.
TYP. T&B
--
.
4 " 4
. A, c .
: ,<1 0
~
ci
;: --I
NO
"-1.'
J I
<1 ~ ci
.." ,:- ~ ~l
Lfl8 @ 10>> E.W.
TYP. T&B
#8 DOWELS @ 10"
. < ~ : ~=-
REIN. Dt:.t AIL
DETAIL f3'\
SCALE: 1/2"=1'-0" ~
ci
:: --I
NO
"-1
1
If
"
~~ r
--I
o
N
'ci
~ --I
~o
.1
j 1
o
I
N
'!
r
~ 2'-0>> ~ \ - 'vI fI8 @ 10>> E.W. ~' "
-0
N
,
#5 DOWEL @ 4" o.c.
#5 HOOK-BAR @ 4" O.c.
#5 Z-BAR @ 4" o.c.
'r
REIN. Dt:.1 All
~~~~~;'-O>> ~~
1
#5 U-BAR @ 4" o.c.
REIN.
,.I
!"
, l
-0
~
~
3/4d
,;:.. -
-
1/2"f/Jx5 1/2" T-304 S.S. --\t-
EXPANSION ANCHOR, "" \. ,+\'~: t 131/1/4:"
'PLASTI-FAB' 5'x5' HOTS ~
SLIDE GATE . REF.
.',' ~'\'~~
~,~.- ,.
',. '4
., 0 I.
~ '\. '
", ~, . U'.. ,(2)#4 T&B
X" f" '
..,~\ '\ ,4':_ ~fl4 @8>>E.W.
_ \ CENTERED
, ,
J ~ !-:- - ~ "'j
- , - -- .
C I ',- C
1 I
r! .:
'I '
/./~l
7 /
,/ -,
',_ '" ..::J
... ,l
60" f/J INLET, (o,!
~ -;:
v
;r
,
-
~
I
;r
,
;: A
o
..I
~!I
:: "
o
..t
~J!
:- jl
o
..I
~11
~ Al
o
1
~,
f-
::>
o
~
"
::
_ l'
+
4.
-
"'" __-A
'0./'i~"~'~-'02,4 4 ,"
4'" .
, I j ,..,'
. .
" .' 4 ' 0 , '
. ~_ ,> : 1 :': '.~: -Aj..'-- 1/2>>91 EXPANSION ANCHOR
~ r. ~ ""- 60>>91 lHlMBlE ON END/PIPE
, I 4 ,<1, . '-- 1/2"x3" GROUT RING
, I "
I
J,
~
-
-
1
~
,
v ~W C-C
6"
-.II--
,
....:?'
;r
I
t-..
B!PUMP6ASE
EL 455'-11 1/4"
),
A
o
'C""'"
I
;G:0:~.,__,
--:-- 4 4 ' .
(4)#5 CONT. ~----
3" x3" x3/8" BENT S.S. PLATE ':
w/l/2>>91x3>> WELD STUDS @ 2'-0" o.c. (/ >-i-
I /,
PUMP REM. OV. T, OP / '. //
GUIDE BRACKET . f/
~ WElD BARS \
"
/'~~'
FLOWABLE ALL TO
CREATE SLOPED BOTTOM
ROUGHEN CONC. & APPLY
CONe. BONDING AGENT
SUMP FOUNDATION
REIN. Dt: IAIL
~~:~~;>>=l'-O" ~
2"
1'--9 3/4" r
- ..
3'-9 1/2"
1'-6 3/4"
"'- -
1'-3 3/4" 1'-3 3/4u.
... 1 1 .....
f-
LU
--I
~
0-
~I
~~ El 455';" 9 1/4>>\
/
,
ex:,
,
I'
,
1/1
W
0-
o
~,
W
0-
o
~,
~
I
-
11
;r
"
~
SLOPE
........
<0
.I
, ,
(ft
0)
@I.I
1.0
--11.0
W.q-.
>
W --I
--I W
SLOPE
........-
'0 ~
I I
t.r:> (0
EL 455'-2"
I ~ PUME..
Il
. (()', ~
r T
%7 1/2"
... .....
, r
~A ~A~.
a 455'-9 1/4"J
! r
ex,
,
I'
-
I
..
~
(4)1" f/Jx2' -10" A.B.
PROJ. 5", EMB.2'-5" w/
1/2"x4" SQ. PLATE/NUl &
w/3"~x10" WILSON .SLEEVE
v =-W)-)
f-
::>
o
~ ~
..';~L> ~:.
~
. EL 455'-2"
A 0 ,4
""'-
'4,
~
I'
.~~
' ." . ';"-"':>'''~~'''O}'':l<;.~.~'
~' "': ,~o '~. ~.: : ' ; _'" .. ...,!"" >:.. _, ' "
, . . -.: It A'
~"">..;.. ,,04, .
. .
,
I
t
, r
~
<1 .
---A
· · .' · ... 4 ·
Lfl5 4VER~S. W/:TD.' ~OOK I,
TYP. @ 8"
(3)#5 CLOSED TIES
REIN. DETAIL
DETAIL (5")
SCALE:<1/2"=1'-0" ~
· <1'
. ,
I L FlOWABlE All TO
CREATE SLOPED BOTTOM
. ROUGHEN CONC. & APPLY
CONC. BONDING AGENT
B ISSUED FOR PERMIT
A . FOR CONCEPTUAl REVIEW ONLY
19MAY09 owe
28APR09. owe
NO.
DATE BY
REVISION
-3RESH =ARSr~-iO~ \jTON
ENGINEERING CONSULTANTS, Ltd.
21268 Hwy 99E. P.O. 370, Aurora, OR 97002 Ph:(503) 678-2434
Fax:(503) 678-5683
TIME:HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: 02209--IP-008-P 1
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
PUMP SUMP Dt.IAILS
SCALE: 1/2" = 1.-0" DATE DWG. NO.
DRAWN BY: DWC 12MAR09
CHECKED: D022091P
APPROVED: SHEET # 008
CUENT INTERNATIONAL PAPER
0\1SQ+4 , MILL WAf t.r( SUPPLY
. ~/aJ'.ltICf 801 42ND ST. SPRINGFIELD. OREGON. 97478
REV.
S
REv. DATE.
CAD DWG - DO NOT EDIT MANUALLY
g of 2/ pQ3es
8'-35/8"
2 1/2"
... I... 8'~6 1/2"
.....
w'
ow-'
-<..>-'
(/)<(<C
ZlL.3=
'DURAGRID J-6000' 1 1/4" wi
CROSS RODS @ 6" o.c. FIBERGLASS
GRATING BY STRONGWELL OR. APPR; EQUAL
10'-2 7/8"
8'-4 5/8"
1/2"
I 8'-8 1/2"
... ......
1/2"
I
w,
ow-'
-<..>--'
(/)<(<C
zlL.3=
'DURAGRID J-6000' 1 1/4".. wi
CROSS RODS @ 6" o.c. FIBERGLASS
GRATING BY STRONGWELL OR APPR. EQUAL
10'-3 7/8"
-
.....
a--' _
":q-.
,
t")
7' - 2"
: :o,~ ~~: . : "" .... >,,'. : "":' '. ;. ,;': i.::. ~~:. .:..~ :'. '../ .:....~ .,......~.. "'....: ,': ':'1' : "~-:: "'''} :' ./..:Jr ~!:~::{f~~~:s~~:~L
,,:.4. ..~"4.4..".:'...~.~"'.',~'.": '."; .:..... ':. .~..... 1....4 ...;....~~:.:.~...::.,:...:tl.:.~ .......:;..:.. ....... :..';" :.'''~'~' (SEEDET.1&3SHT.009)
. 4.. .' . . ,. . . C . .. -c'.. . .' . ". · . -. ~
,)../~"'" : '."' :,," .:"~ ~ ~'j:' ~ ~~.. .., "..' .' ... <'''/ ...i/ ~ " :. . . .;" ~. ......: :. '. "" /1 ~~~?~!
:" :c. .:.~ :1t- . I~ *d ~~69 .~ ! N
. .A::'" ~ e It - 1- - . , I
-.. . . .. 0 0 ;.,., l'
.-:'.'- ~ 4(/<::' i c I ~ .
. :~~'.". ~ 1;- "y; .>~. ,I .. ~-T . .:: .... "
..<~ -;:. * i iii /i i t ~_. * I . _ O.1~..;'.. A :..-
..:....- -r.-.". ~...- IN;' .... A.6 ~
"/(~~t. *!~ ~~;I 1 ~ A, '~':~~>.: ~j ~
:: . ;: 7': ,1111 r' I ~/II '~ . ; ",I..~ - :' -- '- *-. :.' ..... ~ Ill!
... .iItZ<" - . . I I ...... - - - -.... " t) ~.. .,~. .. ~
:.~__. 1111 11/ 1'.;_" I c. ; b.j ",- 4 I i *' ..:.: '-4"" Ii
./\".'* t t
.... ..'- o'~r ':" .'~?-" 'J:';~"
; 6" "!'!- ~ ::J i IN. 1 .....16. :~:.
'" ' '. - I
.. . :. .... * * . . - . ......
.~ ~ . ,,' I '" ' I 1 I 1 ' , '.. . '. ~ , ....
. . .' . '. Ilj II ~ I be ') - <=> J ., * _ _ _ _ IIPV _ . A '. . ;.J.
~~.4. ..~ ~ 1111, 11;1 1,1 ~ I~o- k II II, ~I ~! It ~~. . .:.~ ~d
'.A,! .:",fJ.. w.tr ~'~. '''~1'\ t, I ~ ,- ..)!t"...~....~ INSIDE Nr
~:. ..~-:r I ~ I . ',1 ;1',::-7.~' ;..".'. A..; "6: .:~J ?,.~; :.~. ". FACEI
.",:6... * * _" , _ '_ .... :....... ....\. '. - :., .... :4 ,-t....,.,'.: .:... WALL
....-.. -.... -\ . . "4' A '>1\'" - 4l .0....... .... A
. . .,... .' ..... .' III 4.; '4" 44. . 4' . ..... .'.A '. . A ~ II." .. '.4 .'." : ". .... ..... . '"
;;;:.:. ::;/.:. ~..t~:..> ~:~:. '.::~ .~. ::~':..'-: ~ ~ '/:'.; . ~> ; i '.\~ :'. ~:'.,~ .:.<: ~ : r;::.:~.r .<; '. ;: ::/ ". .:::. ";, ~ ~:. F. ~: ,-:'/:. ';' .; ~ ::/'-:).:.~:: ~~
\f3A\
~
7' - 2"
w , ..... ~. SHOP WELDED C6x8.2 FRAME
~~~
~lL.3=
". .. 6.4.4.' ........ 4.... '. : '.' : .4 '., .';.'.16:- :'C :." . .'" . .... ':. . 4. ;'.' .'" (SEE DET. 1&3 SHT. 009)
4 "..6 . .'. . . ,....... '., . ." .... -c'.... . '.' . '. '. " .... . . . ."
1! INSIDE . .... :.' ""..... .:. '. -:. . . -: ':'.' A ...... .:. .... . ~ -::.' . '< . ...... .: I:~'" .-.,: ~:4 '. A:. ". ..4...:' . '. A / INSIDE
,~ FACEI ,'. .;.... .....4 * I" l * ~-~5B SIM.:;.., l -' l---r-'* iIIII' r' ~. 1 * h:"." ~ FACEI ~ 1
~ WALL .' '.' f ~ L -1Jj.. ~ : '. ':.: WALL ""
o 11 '. . .. '. .!(~v.?'" lJ . ... I ~
~" ' ;','" .'~' ~ "O~' OO~ Ny ,II 11 l' )f ", ......(4 ~
-- ':;.:.:: -J~KJ ~ 0 lU ~..,:..* . *;:~;....:.;. j ""1
::...:.:.....- .. ~. l -t '- .~010B9;:'. 1f ~ A*':''-:'~.~:.. .
" j ~~::':'~'.:U~~-- *' ~ --, ~ - ~ - , :~"i..;:~
-1 : ~':.'.,! ff~ t ~ ~l ~ A
J. I 0 ~ (~/ ~'.:Y:V: ' 009,
'. 4',:"_ \ . N. II 1
-:" :'. ..~ * t *. N:::-: ." .~. ~.
'.. .' , (j) ,- ....
l' . .' ,,:.. ~ . ,i.......:
. '" ' <D'" . " '
-- '"':.' ~,;' ~::J t c;,. LJ -; , A J.':~'" ~.;.
.4. . '..- t '1 : "'.
" ....::~. :.:~Jiji ~f)~lp''''' . ~ .,* , ,:...t:::
~.': ~. ..: . II i I 11/1 I I" I ) 0 II jo : ~,,- ~ :'. ,~<
-- I -- .....- \ "t ~.., .
=-. \"'". ~ .....~ .~ It.::. ...... ;-
".~~.'.A:.'It. ~ ~.' ~ ;,*. r. .' -j.Jl....... .4.
.. .. ..,. ........ ... .. " .." ."6 .. .., ...... ..
. . , , . N "1 ". . ....... A. ' . <4 .4. .
....:.x:. .* . *~.' I '- ~'.~J ....l..~:":'.- ;4. ..' ..:.....t...:..;,....: - ;..:
. . . ... . . -:Z' . . '4. . ' ... ..... " A.
. . ..... .' ...4 .' It 4.... '4" A~' , 4' ...... ....4 '. 4 ~ ~ ., .~.. .&." .'a.. : D.. ""~" ...... . .'.
;;;:.:.:: '< :.:. ? .". ?~:. ~:.:""<. ::~':...':: ~ '/'.~ . .~ '.:.'~ ;'.~ '. A<.~ :'.~.. .L-<: ~ : ~: /.: ~ ':;:: .......: '. ": ::';'- ". . :::. ..; <. . ~:'. ~,~~ .-:':~ · >. . >-
?:~:', ~.~. : : ~. .
.' .," . .. -. '. . . .....; . 1 .. . · . .,. . ... 'a ... A
CONNECT PANELS TOGETHER / \ ~
~s~lg!&~~ SO~ ~~LJ;.LACED .. l ~ \ l . . .
...
--rr r"T
I I I
I l I I IT /STLEL 468'-10 3/4"
:: . r~-~;@.'-- '
!l - _~. I ;~.J@ ~
II r=~ I . .
:~,'.~'~i ~:~-- 'EXlEN 525' L6x4xJ/8x4 1/2"
I 0 I I (LL V SLH 3")
II 3: :
II I q .'. .. .,: f
.J I I
~ .L.~
3"
- 4 1/2" 5/8"" f/J 'FIBREBOLT, SruD & NUT
......
<r--
....-
I
....-
":q-
.........
! r tNSIDE
FACEI
WALL
....-
o
I .
N
"
.L
--
,\
,
":q- ::
, '.,q-
..t") , ','
":q- ....- ..-
'I N
""-":q- I
o w"
I . N
N
--
--t:
lI.,q-
:: ,
.,q- ....-
'N
:: t") I
.,q- ....- N
, I
~ -
.,q-
o
I
N
....-
!J
N
,
j"
..
(x)
,
....-
....-
I
to
--
....-
~
I
;.,.,' r
r
j]
--
OJI
I
Ny INSIDE
FACEI
WALL
3/4' f/J 'FIBREBOL f SruDS &
NUTS TYP. @ CORNERS OF
(3) PANELS.
~
~
3:
<:J..I
--
8' -9"
~
S
3:
_<: }J
PLATFORM FRAMING PLAN (FIBERGLASS OPT)
~~~~~~"=1'-0" @
1 1/4"
---1 ~
N
N '1
~ 1l;:;~
3"
- I~
1 1/2"
~
l
..... -:" ~
3/4" f/Jx1 ' - 2" 'FlBREBOL T' STUD
I ;MB~ l' -0" : PROJ. 2" TYP.
....q4.. . . .' .</
'. .4"
ADDL. 5/8" f/J 'FIBREBOLf
STUD & NUT
N
,
5>
---
, !
" ,. ~Jt ~ -
'\ ,;'..... @~I
+ -- .' -- .. .. ., ., . ~,:. .. ..1*1 ~
~r~ ~~ t~... ;1,. .. .
(f ~-' l~ '\' - I'. (-' ~ I:~j _~3."f/J GUIDE 11
" I A \\ II . ,~~ A ~BAR i .~
220 f/J.J?I$CH. - - - ,I ~-- ~t, ~cr
\\ ~~. A ~ . -+ ~~:,jr i?~~ GUIDE ,a:~,
~ ~ ~~."~ .~....
J-- .. .. .. .. .. ,. .. .~ '.~, .. .. '!1J' 1'< ~ 'EXTEN 525: L6x4x3/8x4 1/2"
T I <0 . I'" (LLV SLH 3 )
" I ) "--
) ~ ~r........ ,I W1 Ox33 GALVANIZED & P AINlED
- I :.jt. " 5/8" (/) 'FIBREBOL T'
2 3/4" SruD & NUT
, PANEL ATTACHMENT
--- '\.,
;.,.,' I ~
~l :
4.
.</ ...
-
'EXTREN 525' RBERGLASS
CHANNEL 10"x2 3/4"xl/2"
BY ~ I KONGWELL OR APPR.
V:.W A-A
2 1/2"
___-I ..-
7 314"
'EXTREN 525' L4x4x3/8 wi
3/4" f/J FtBREBOL T STUDS &
(TYP. FRAMING CONN. U.N.O.)
5/8" f/J 'FIBREBOL f STUD & NUT
PANEL ATTACHMENT (SEE ,
PLAN FOR .LOCATlONS)
.q'J' .
<1
'EXTREN 525' L4x4xl/2 PERIMETER
LEDGER ANGLE w IPRE -DRILLED
1"f/J HOLES @ 24" o.C. FOR 3/4"f/J
FIBREBOL T STUDS.
FRAMING CONNECTION (FIBERGLASS).
DETAIL f2A\
SCALE: 1"=1'-0" ~ .
Ii ,
I
3/4"f/Jx1'-2" S.S. ANCHOR
EMB. l' -0" & PROJ. 2" TYP.
J 4
C6x8.2 FRAME
</
/
1-
;4
4.
..4
....q4.... .' .</
. . . 4,.
. .
A: <1.'
.t-4 . . .4
; .q
~ ~. .~
1" 4 . .:~r... 4'4
L4x4x3/8 LEDGER BOLTED ;. </' .'.<1 . . .-
TOCONC. w/3/4"f/J ANCHOR .4.q .'. ^ . . .q
@ 2'-0". V
'.q :.
l' -9 5/8"
REF.
-
NOTE: TOP FLANGE OF Cl0
REMOVED FOR CLARITY.
F~MING CONNECTION (FIBERGLASS)
, DETAIL f3A\
SCALE: 1"=1'-0" ~ .
FRAMING CONNECTION (STEEL)
DETAIL (2B\
SCALE: 1"=1'-0" ~
~
t")
~
~
I
--
~:
t") .,q-
... ,
":q- __ or-
'I N
~":q- I
o ..
I N
N
N
,
~
... ..'" ... a
~ ~
t") to
o
~
I
@.;'
, f
Ji
,.... .
" : .... : ~ .
'..: .6: .
.-. .-
l'
,-
-....:.. ,
...... ... ...
.... :~.,
- --C~
:: I~
.,q- ~
'N
:: t") I
.,q-....- N
, I
~ ..
.,q-
o .
I
N
N
,
--
(x)
,
....-
--
I
to
~
~
I
;.,.,y
I'
--
:: Ii
'I
INSIDE Ny
FACEI
WALL
Oil
I
Ny INSIDE
FACEI
WALL
PLA I t-ORM FRAMING PLAN (STEEL OPT)
DETAIL fP2"\
SCALE: 1/4"=1'-0" ~
2 1/2"
___.1____
1/2"
___ L 8 3/4':'-
V. . .. - L2)(2~1/4x21/2" LONG wi
VERT. LEG WELDED TO WEB
OFC6. ATTACH HORIZ. LEG
TO TOP OF Wl0 USING 5/8" f/J
S.S. BOLT TYP.
t N
-- @:f-f@-]Ifib@--.........
<> . I .' ~ N " l'
. . @ : I. @ I . I1j [jI€>.. , , ...,
- - -........- - ij, f......- - - "
,~ K 'E~ t 525' L6x4x3/8x4 1/2"
(LLV)
~----.;.- ~
_~"_DI~
~ i~ jt+(~-'
t - - -:- - , - - ~ I -'. '-- SHOP WELDED C6x8.2 FRAME
l I (0 X. . (GALVANIZED & PAINTED) .
)E- (
.. . . W1Ox26 GALVANIZED & PAINTED
""
. '- 5/8" f/J S.S. BOLT TYP.
PANEL A TT ACHMENT
ADDl. 5/8"f/J 'RBREBOL T'
STUD & NUT
5/8""(/) 'FIBREBOLfSTUD &..NUT
I ;
I ;
I~l_
I~l O.~
II I
II i
23" f/J GUIQE
BAR ' .
<- .. lL.
.;:> (OW
3" f/J GUIDE ! 0::
2 -'
BAR
:f .
~,4)'1 ;
.. ~ I, :~ )(- - f
'. I @ !:Ii~" .,.< ~:3 ~l
I ~@ ~I;~ . ~
,. ..,. ~ .4&-~~ -'
. II .
~\.: I .
9" 2 3/4"
-- ........
4 1/2'1
...-
-.... ).. .....t--
l' -9 5/8"
REF.
....I
FRAMING CONNECTION (STEEL)
~~~~!~'-O" . .~
NOTE: TOP FLANGE OF C10
REMOVED FOR CLARITY.
FRAMING CONNECTION (FIBERGLASS)
DETAIL (4'\
SCALE: 1"=1'-0" ~
CAD DWG - DO NOT EDIT MANUALLY
I " 1 1/4"
.11 4 /
.\..~---
---~_I--
N
,
/L 'EXTREN 525'FIBERGLASS
CHANNEL 10"x2 3/4"xl/2"
BY STRONGWELLOR APPR.
'. /' r. EQUAL.
~', I'@. ~ 'EXTREN 5.25' L4x4x3/8 wi
nl~@ ~3/4"_ FIBREBOLT STUDS &
. ..iJ _ (TYP. FRAMING CONN.. U.N.O.)
f. . . , , 5/8" f/J 'FIBREBOL T' STUD & NUT
@ EA. CORNER OF PANEL (SEE
PLAN FOR LOCATIONS)
~
~~
- t
.
;.,.,..
;.,., , d
~
, I
. ..
W10x33
2 3/4"
L
FRAMING CONNECTION (FIBERGLASS)
DETAIL (fA\
SCALE: 1"=1'-0" ~
1/2"
I
<
-.; -'
. :
.~., ~J i ,c~.,~..
,~" )0'. ~
J.... .., _ 5/8"_ S.S. BOLTS
~ ..~ @ EA. CORNER OF PANEL (SEE
8. PLAN FOR LOCATIONS)
~I I
I
, - '. """-'-.......
1 1/2"
. ---
FRAMING CONNECTION. (STEEL)
DETAIL ~
SCALE: 1"=1'-0" ~
<>
.. 0'>- ~
@;j: .@
@~, ~. @.
....-
~
-S.........
~
l'
, ..
- ;.,.,
l
.~) .- -
(2)3j4"f/J 'FIBREBOLT' /. .~ I ~ ,,' i<-.t
SruDS & NUTS /. ..-' .}- ~ ~ . L5x4x5/16x6" (GALVANIZED &
PAINTED)
W10 w/13/16"xl 7/8" ..
HORIl. SLOTS IN WEB. _ . . 2 1/2" (4)3/4"_x1'-2" 'ABREBOLT
I - STUDS EMB. 1'-0" & PROJ. 2"
FRAMING CONNECTION (FIBERGLASS)
~;~ ~!~'-O" (ff;
~
<'>
N
,
<>--
....-
(2}3/4"(/) S.S.
BOLTS
I,
1
::
t") 1 '
l ;.,.,
L5x4x5/16x6" (GALVANIZED &
PAINTED)
2 1/2" (4)3/4"f/Jx1':....2.. S.S. STUDS
:: - EMB. 1'-0" & PROJ.. 2!'
FRAMING..CONNECTION (STEEL)
DETAIL ~
~
Wl0 .w/13/16"xl, 718"
HORIZ. SLOTS IN WEB.
SCALE: 1"=1'_0"
Received:~l('~
A, ISSUED FOR PERMIT
19MAY09 owe
NO.
REVISION
. DATE BY
3RES;=ARsrrHOR~TON
ENGINEERING CONSULTANTS, Ltd.
21268 Hwy 99E, P.O. 370, Aurora, OR 97002 Ph:(503) 678-2434-
Fax:(503) 678-5683
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
PUMP SUMP PLATFORM FRAMING DETAILS
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD. NO: '02209-IP-008-P 1
SCALE: 1/2" = 1. -0" DATE DWG. NO.
DRAWN BY: owe 12MAR09
CHECKED: - D022091P
APPROVED: SHEET # 009
CUENT INTERNATIONAL PAPER
1l\19~ MILL WATER SUPPLY
'~j(.X:Nr1Cf 801 42NO ST, SPRINGAELO. OREGON. 97478
REV.
A
REV. DATE
q of 2l pa:c,:>
v
-/
f~
472' ORDINARY
j.. HIGH . W. ATER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .'. . . . . . . . . . . .' . . . . . . . . '. . . . . .
.#~.......... ..
I
N4800.00'
..... ................. ...... ........
I
I
f-
iE
~
::>
Q)
'<(
t5
o
0::
Q)
. \1,'0
G\\~j)..iO\)~\) ')
~~C.\ S\ "0
~\...
I
I
. N 4700. 00'
.. .. .. .. .... .. -. .. .. .' .. .. .. .. ,. .. .. .. .. .. .. ~ .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... " .' .. .. ~ .. .. ,. .. .. .. " ..,.. .. .. .. .. ..
. J
I
I
/
ST A nON 3+36.86' I
END CURVE
1
\)~~
'\\ ~'<
O~
~vi\\ ,
o'
o.
d.
o.
'"
I"') .
w.
o'
o.
d.
o.
I"')
I"') .
w.
9
CAD DWG - DO NOT EDIT MANUALLY
N4600.00'
.. .. .. .. .. ... -.-, .. .. .. "" .. .. ""' .. ,. .. .. '. ..
0'
o.
d~
o.
.q-
I"') .
w.
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: 08708-IP-009-Pl
B ISSUED FOR PERMIT
A . FOR CONCEPTUAl REVIEW. ONLY
NO. REVISION
19MAY09 owe '
28APR09 ..OWC'
DATE BY
BRESt- EARSlTiO ~ \jTON
ENGINEERING CONSULT ANTSt Ltd.
21268 Hwy'99E. P~O. 370~ Aurora..OR 97002 Ph:(503) 678-2434
Fax:(503) 678-5683
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
RIVER WATER UNDERGROUND PIPING (1 OF 4)
SCALE: 1 II = 20' DATE DWG. NO. REV.
DRAWN BY: DWC 12MAR09 B
CHECKED: D022091P . ~N&TE
APPROVED: SH Et.I# 022
CUENf INTERNATIONAL PAPER
.~ MILL WATER SUPPLY
; ~(<XNrICf 801 42ND ST. SPRINGAELO, OREGON. 97478
/0 of ZJ paces
v
~\
! . . ... . . . . ',,~~~":' \)~~
. .. .. ... <.: ^'" ,~
. . 0 i)'t
. . . . O' ~ v
. .. 6~\G,^ if
o. ;s
~'O
lJ.J. Df /
0}
~ ~ro' .
!9
~
ts
'S:/
C.>
~
&
~
~
;' .. .
# . ~
~4:59q.qo: .
c'
O'
0'
O.
N.
1'1')
lJ.J.
'0
O'
0'
O.
1'1').
1'1')
lJ.J .
/'"
/
~
/
A Cj~*JCS
~
,
I
. . .
'. .
.
. ~4:4<?O: 0.0. . . .
/'"
.~/
~<(~
S
/
~
~
~
~
, . .
N.4~O.O..09. . . . . . . . .
,
N4300~9q . .
. .
I
/ : "--
C
"-- 4 92 ----..
~
.N:4?O.o..o9'. . . . . . . . .
I . ·
.. .. . .. .
. .
. . .
,
STA nON 7+48.57
START CURVE .
I
I
~:.
- . it~(?
/
DO NOT EDIT MANUALLY
CAD DWG -
MMAM.
TIME: HH:
/xx
DATE' xx/xx
PLOT '.. P1
70B-IP-009-
CAD NO: 08
o FOR PERMIT
B ISSUE EPTU. ~ REVIEW ONLY
A FORCONC . . .
REVISION . . /THORNTON
RESHEARS. Ltd
B . EERING CONSUL TA~Ph'(503}678-2434
ENGINO Aurora, OR 970 . .
21268 Hwy 99E, P~O~ 3:a~:(503) 678-5683
NAL PAPER
INTERNATIO . OREGON
SPRINGFIELglJND PIPING
. R UNDERGR NO
RIVER WATE DATE DWG. .
SCAlE: 1" = 2~C 12MAR09 D 022091P
DRAWN BY: D SHEt.1 # 023
CHECKED: . . . PAPER
APPROVED. INTERNATION~~PLY
WENT . MILL WATER OREGON. 97478
. SPRINGAElD.
O\1Srn 801 42ND ST.
~j(X)JrICr
19MAY09 owe
28APR09 . owe
NO.
DATE. BY
-,
EXlS1TNG ~ONCRETE
BROW LOG.
.. .. "::
.... .. ..
~. ....
r ......:..:.......~
.. .. .. .. .. .. , ,
.. ..' ..
. .
. .
. .
. . .
(2 OF 4)
REV.
S
Rei. DATE
- 28APR09
/1 oP 2/ PO!f>
../~\
/
----
ROADWAY
----
--
,
N4000..0? . .
N3700..0?'. .
.. .. .. ..
I
I
I
I
,'. . .....
.. .. .. .. ..-.. .. .. .. .. ... .. .. .. ... .. ..
FOR CONTINUA TlON'SEE DRAWJNG023
~: ----------
8=-491
.q-'
I"') .
w
O.
c
0'
C.
to.
I"')
W.
.. :. PARKING ARE
\r
~:
~/~
t:/?
~
~...
ST A TJON1 0+ 94.9~'
PIPE CROSSING
--------=-
l
-491
---
~
~/
(
/
I
I
I
I -
j
t
I
t
JJ~
/
/
/
~/
//1
I
: . STATION 12+54.05' I
~:. START CURVE. '\.... ~t~ \~. II
. ~ '\ ~~~
: ~. ~,.~:~~ \ \ ..J
r '\: .. ..~. \/"xl
o. . . . . . '. .:. . .! . . . . '.' \'. '.. " . . . . . . Ai. _ . \
. . . . ~ . . .. .',~, \
\ \. STATION 13+06.41' . '../\ . .
END CURVE I '\
I
"
,.~. :
,'/\, \~, I
,. . \.
l:r ~ \
\
----
--
-
-
---
/
/
/
/
/
.....-
. .. . . . . . . . , rfj>" . : . . . . . , . . . , .
. . Pf
$>
/
I
.~
/
/
/
OJ
/
/
/
\
r-.)..'....
"'-
. I
b.
~. .
. . . , . . 'g.
N.
I"')
W.
b.
c
.. .. .. .. ..
. . . , . . 'g.
1"').
I"')
W.
a?
~
,. .j...,
. . . ", .
.. .. .. .. .. .. ..
\
FOR CONTINUATION SEE DR"AWlNG 025
\
0'
c.
0.
c.
CD
1"').
w.
O'
o.
0.
o.
,......
I"') .
w.
.. ".." -..
: N4000.00' ,.
.. .... .. #- .. .. .. .. .. ..
... .. > .... ..
: N3900.00'
.. ... .. -..
~ .. .. ..
,
: N38~O:0~.
.. .. .. .. ..
~ .. .- ..
~
.; .. ..
~Xf'l (g 130 Zot ()
.. ,
8: N3700.00 .
. .. .. .. .. .. .. .. ..
. . .c.
. 0
,.......
1"').
W
8
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: 08708-IP-009-P1
Do NOT EDIT MA, NUALLY
CADDWG -
A ISSUED FOR PERMIT
REVISION
BRESHEARS"HO~NTON
· ENGINEERING CON~~~:~Sp~~(503) 678-2434
21268. Hwy 99E, P.O. 3:~~:~67a-Ss83
19MAY09 owe
NO.
DATE BY
INTERNATIONAL PAPER
SPRINGFIELD, ORaGON 4)
. R UNDERGROUND jPIPING (3 OF
. RIVER WATE DWG NO REV.
DATE ... A
. SCALE: 1. = 20.' .... 12MAR09 REV. DATE
DRAWN. BY: owe 0 022091P
. CHECKEO:.SHEET#024
APPROVED: INTERNATIONAL PAPER
CUENT Milt WATER suppLy
0\49Q\J 0 s,.. SPRINGAELf)" OREGON, 97478
801 42N 'I.'
~/<XNf1Cr
12.. of 21 pa.C~S
'-
FOR CONTINUATION SEE DRAWING 024
r /
'\
~
: \
o'
o.
0.
o
~.
rt).
w.
O'
o.
0'
o.
........
rt).
w.
O'
o.
0.
o
1"'")'
1"'").
;W.
O'
o.
0.
o
(".f .
rt).
w.
I
~
z
<(
I-'
--.!
W
(f)
W
o
)
II
~:
:~:
~~
~
~~==== ==:======:======:~_. =~~~~~~~E~;JK
8' S.S~ INV. . /., _ _ _ ~ _ _ ~=1/~~.. . J::.Xl~lJ.Nu.11:..STEEL ~.. . ~/.. / . NO.3 RECOVERY BOILER
EL.486'-6 1/2~~h ~ '" --------------------,1. BLOW DOWN TANK:
.~. (){
: '--/ () :
.. .. -.. .. .. .. '.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .' .." .. .. .. .. .. .. .. .. .. ..' .. .. .. .. .. .. .. .. .. .. .. ..
..' ; .. .. ,. .. .. .. .... ....:"'.. - .. .. .." .. ":' .. .. .. .. .. .. .. .. .. .. -.. .. .. ..
r--
INV. EL.484'- 5'
\
/
~I
\
\
6
. N3600.00'
- OUTFALL TO LOG POND
~\, ~
o a..
,;>, <(
. 0... t '0
$-q
s: <Cot
N cD
c- ..q-
f', ...i
\.)~
. \
N 3528. 22 ~ . .~ STATION 15+73.50.
E3423.00 \ /\;1 PIPE CROSSING
o '11..1. :
6" ~.!'LUEN-r..lfRP) \
. / INV. El. 484.50' '.;.-;f = =- =-::.:: - \ - =-.. ,
· -J" . (REF.) .\\,/, ~
/" N3522.22 . STATION 16+01. 4-3' I\! \..,
E3417.00 PIPE CROSSING' ~O'. \- . ..
. 6" DOMESTIC SEWER a:~ 1 . I. I.
I I -+
. : I.E. 484.7' .". . , '" / ". . N3500.00'
'. . . . . . . " . . . . . . . . . . . " . . . . . . . . . . . . . .00 . . . . . . . -.."...... - . . ..........- . . ......... . ......,... . . ,\-.,......." . ... r . .' i' . . . ','
. . . . . . . . . . . . . . . . ",. .. . . . . . . . . . . . . . . '.' . . . . . . . . . '. . . . . . . . . . . . . . . . . . . . . . . . . '" . . '.' . . . . . . . . .
: /: ~\ :' ///. .
STATION 16+35.19' (I P\I\ \ . ~ I '"
PIPE CROSSING . \ I II L.i~ \ I:); /
~II~ ~: //
I WI\ lie. I /
8" FI~E _ Af 'PR~X:.. _~~ _ _ (/) 1 ~ \Q _ . _
INV. ~E::3'-4" . ~, I \\ y' ~: /
. ST A TlOtJ 16+69.88 \t5 I I \ l. .,'.; /'
PIPE . CROSSING t ~ \"
~'" .
I d, I r\ \ ::
\. \ _,.1. ~,;/;/ \\. ~: \
~~~,I Ij I \ :
_:\ ., - 41 \ ..
/~\;::.:~. '~\\\i
\ .
. . $' \.,. . . .:- .~:~ . .. ':~ x' ; \.. . . . . . . . . . . . . . . =. . . . . . ~ . . . . . . . .:. . . . . . . . ..
~_ . I (\ . ~
~..!.._;:/ \ 'STATlON 17+41.;6'
--- : \ . 36"-4591 ELL (DR 17)
1:\
\
.w
Z
t-f
--1
a:
.02
.~
~
(X)
/
~
I
,
.(\J
.......
~
~-t
=€)
POWER BOILER
No.3 RECOVERY BOILER
No.4 RECOVERY BOILER
/.~/
/../
~'/
;;1
~~ '
" ~\.. -'
C -6L-pF-51tJ /" - \ \" u u
MANH~1 \'
RIM EL 489.59'
FOR DEMINERALIZER PIPING
THROUGH BUILDING SEE
DRAWING KRP-40-D
. NO. 3 RECqVER. Y BOILER /
BUllJDOIJN TANK I
. . -' ..
~
I
r
o'
/ 0 o~.
1 .' (8'-EAG-524) N. ~:
. - : . +. w: N3500.00'
, . .~, ~": .. --=-. . . . . . . . . . . . . . . '. . . . . . . . . . . . . . . . . . . .' . . . . . . .' . . . . . . . . . . . . . '. . . . . . -
"~""-- . I ~ATI~2).r - ::-. EXI~TING -^-<n-7) r
\ . 7 I DEMINERLIZER
,/ '. S~MP /
/
DEMINERALIZING SYSTEM
r::=s
ELECTRICAL
SUBSTATION
~
~
~, ~
~ ~
~. ~
~. ~
~ ~
.~ ~
'1
c10
/
C)
. 0
.No.4 TURBINE---I
. GENERA TOR CO
m
w
3:
w
COMPRESSOR
BUILDING
, I
j9
/
STATION 16+ 79.59'
PIPE CROS/SING
C. BASIN
RIM EL. 488.37:
(2) -EXIST. 36'
FIRE \J A TER
FEED LINES
-
36"~ CONCRETE
FIRE LINE
(ABANDON)
r../
ro'
l
J
. n
-,
6
c::>
..c.u.-
(Y)
Li.J
l t .
,=====,18' DIAM.. WOOD STAVE
I: INV. EL.482.5'
..
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I: "4; tiAS LINt' . . . . . . . . .
I. EL486.5' \
I: ') ~ - , - -
I ~ -- --
a ~__=___=_=__\=_~
N3400.00'
. . . .N3400
AI
~..'
c
~
..
Y->
(
I
c
c
-488
EXIST. 36" ~ MILL
WA TER LINE
""u
------
I'
: C. BASIN
. RIM EL 486.70'
STATION 17+78.44'
N3333.92' .
E3447.08'
APPROX. TIE-IN POINT
. A, ,ISSUED FOR PERMIT
NO. REVISION
19MAV09 owe
I I
I J
DATE .BY
BRESHEARSITHORNTON
, ENGINEERING CONSULTANTS. Ltd.
21268 Hwy 99E; P.O. 370. Aurora~ OR 97002 Ph:(503) 678-2434
Fax:(503) 678-5683
N3300.00'
o' 0' O' O. b 0
o. o. o. 0 O' O'
0. 0' 0' 0' 0' 0'
o. o. o. o. o. O.
N I"'") ~ . . to. ~. :;;.
1"'")' 1"')' 1"'")' I"')
W UJ W I . W W w.
III
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
RIVER WATER UNDERGROUND PIPING (4 OF 4)
SCALE: 1 It = 20' DATE OWG. NO. REV.
DRAWN BY: DWC 12MAR09 A
CHECKED: 0 022091P REV. OATE
APPROVED: SHEt.t # 025
CUENT INTERNATIONAL PAPER
~ MILL WATER SUPPLY
.~/<XM1Cf 80142ND ST. SPRINGFIELD. OREGON. .97478
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: 08708-IP-009-P1
CAD DWG - DO NOT EDIT MANUALLY
/3 of 21 paces
v
1
CONTROL DENSITY FILL AROUND
PIPE OR REPLACE EX. RIP RAP
36" f/J PIPE
PREPARED BED
. RESTORE EXISITNG
PAVEMENT/CONCRETE SLAB
At I t.R PIPE INSTALL TlON
TYPICAL SLOPE EXCAVATION
DETAIL ~
SCALE: 1/2"=1'-0". ~-
!
,'. :.....:~ .~ .:'4':". >- ...:~ :~'.= ...:~ ..~'.: ~ .:'. ......... . :4. ... .;; ..~.. .:. > . .;w'
. . 4." . ..... ~ ... . . . . .... 41 . ..
RESTORE EXIStTNG
PAVEMENT/CONCRETE SLAB
AFTER PIPEINST ALL TlON
: .::- : ::. .:: . .: .... ::- i ~ ,..--.:.~ " :.~ .-~ '.: :.;. '.: !-.. : -:.;:;:: . ;': ....: :.. '. ..: . '. :-:: ~_.:-. ;- ~: .
~~~~~~ff~- ,
~ W~~~~~-~~~
-~W-~~-<.W-~-<.~:
~. . .r-~~~~~~
~-<'~~-<'~-<'3h-<';;
~~ -~ W1
~.~~ HD~~
~I~~.. +. ..:.$fit~
.::;.:: '';: .;%~ -A'L,...:...:....
.~;~~~~~~~~~~~~:~~~~~~~:~~i~~~;~:~:::i~1f.:5;~::::~::f:!j
d
0:::
~o
OW
ob
.z
CRUSHED . ~ en
> GRANULAR FILL ;- ~
Oz
I:::>
it)
;-t_;~:.. ::;r~~ · i/'.(/~
:(j: >:~: ::~ .'. ..~{"Y~~~~':.::'..
/
"
>PRIMARY INITIAL
SANO. BACK FILL
EXISTING 28ft f/J HOPE
INFLUENT FORCEMAIN
{.~;~.'j ~ :.:~.:.~ .:. '~~':~ '.~. .....~'.:. .~. ...~~ .t~~:. ..
MIN. SAND. BEDDING
5' -0" MIN.
6' -0" MIN.
....
....
D.ETAIL
SCALE: 1 /2" = l' -0"
~
~
f4'\
~
DETAIL
SCALE: 1 /2" =1' _0"
,..
CRUSHED
> GRANULAR FILL
<
::0' .
Z .
1-
- ~
<v-l
>FLOWABLE
FILL
, f
:: Z
(0 -
~ /
\y
.I
r\
"J 1
::: z > FLOWABLE
(0"5 FILL
T
~: EXIST~ 36" f/J WATER
HEADER
f\
\J
(
\
..
~
I"')
U') .
I
it)
I
-.t' -
I
36" f/J HOPE MILL
WATER FORCEMAIN
2'-5 1/4" 3'-5 3/8"
.... .......
2'-5 1/4"
. ....
HOPE (SDR32.5) FABRtCA II:.U 3 SEGMENT 45f/J ELL
o
CONNECTION AT TIE-IN POINT
Dt:: I AIL f5"\
SCALE: 1/2"=1'-0" ~
LE. 482.5' (REF.)
A
, r
A
b
I
it)
, (0
8' - 2"
8' - 2"
.. '.:
!
f
CONTROL DENSITY FILL AROUND
PIPE OR REPLACE EX.. RIP RAP
. 36"f/J PIPE
TYPICAL SECTION
DETAIL (2)
SCALE: 1/2"=1' -0" ~
PREPARED BED
.".- :"..- .. e. . - , 1~ . . . .. .-~~ . ~):..I
.JI .. .
~ ! ' .. -,. V
~ r
.~ ~
. : . e
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: 08708-IP-009-P1
CAD. DWG - DO .NOT EDIT MANUALLY
A ISSUED FOR PERMIT
NO. REVISION
19MAY09 owe
DATE BY
3R =8 -lEA ~SITHO'R \jTO ;f:'
ENGINEERING CONSULTANTS, Ltd;
21268 Hwy 99E, P.O. 370, Aurora, OR 97002 Ph:(503) 678-2,434
Fax:(503) 678-5683
INTERNATIONAL PAPER
SPRIN'GFIELD, OREGON
UNDERGROUND PIPE Dt.IAILS
SCALE: 1/2" = 1'-0" DATE DWG. . NO.
DRAWN BY: owe 12MAR09 '
CHECKED: D022091P
,APPROVED: SHEtJ # 026
CUENT INTERNATIONAL PAPER
rNS{}J MILL WATER SUPPLY
~(<nIf1Cf 801 42ND ST, SPRINGFIELD, OREGON. 97478
REV.
A
REV. DATE
/4 of 2/ p~es
~
/1' ~
( I , --'
I \.n 02?Q9 u-I~
I '~d I=!
<C UJ .
r - "1 - l -':"24"(6 STEEL PIPEj- ~ ~ 24"(6 STEEL PIPE
~ 1 -I 1- - - 'I --{l- _.'-
L_ .J _ J .....- L'__
o
<C
o
~
UJ
u
>1
~
UJ
(/)
~!~
" ", 'of , '.
, '. .. 1 '.
y .I.. 1 . ....
",'.' :'1. .. ,'j
, - ':. It I.. ,,".'
. . r ~I'
.i4nt
13' -0"
7' -11"
13' -9"
.......
107' -8"
13'-9"
..... .... ...
12'-1 13/16"
. .' . - . .
:.
k
, -J...',
,.~.. .
8':"'4"
.....
..... ....
21' -83/8"
24' -9 1/2"
35' -1 "
:... ..
....
18' -6"
. 12'-11 1/2"
....... " ..... ....
17'-5 3/8"
. .:,
=- ' ....
./'
.... ....
6' -0"
r::....
0:::
.~
~
r..... ... .,/~ H
l(~~j~ ]5
3~' -0" ~
36tJ9) - 3/4" WALL
.... ....
, 13'-9"
13' -9"
13' -9"
. '...
13' -9"
13' -9"
.....
.... ...
..... ....
..... .....
.... ....
~i
A'.I
( A ~-..
~
~ ,-. ..",-'''' \.. ..
/' /,;.. ., .. .)
uF'
11,.. .-. lor
llTI~ I
! i I
I ~;t ~ i
NEW S=TATlON~
" 36"9) STEEL PIPE
../:J:
"
j'
....f:.
-f
I'
J. .,
l"t'
L:,
~
t..
~
. ." - ~, "' .-
...
....... -.
..
15'-0"
...
....
23' -0"
36"9) - 5/8" WALL
.... ....
.... ....
104' -9 13/16"
36"9) - 5/8" WALL
.36"9) STEEL
.
, ... ASTM 572 GRADE 50
14" 9) KNIFE GATE VALVE
w/BUND FLANGE
~
SLOUGH BRIDGE CROSSING
D'ET AIL rt'\
SCALE: 1/8"=1'-0" ~
BOTTOM OF PIPE EL 484.00
L4 STIFF @ 13'-9>>
(6)5"'9) PIPES
'36"9) 'FORCED MAIN
STEEL-ASTM A 572
GRADE-50
BOTTOM OF PIPE EL VARIES
;:
o
a2
1" -3000# THRD. CPLG.
w/THRD. NIPPLE & 1"9}
AIR RELEIF VALVE
. 3S"x24" CON. RED.
; 1
01
<C
o
0::
W
U
,~
l: :'
! I
j r .
BOTTOM OF PIPE EL 483.00
485.00
. .............. .-:r:..; : . ~: : : : : : > : : : : : : : : : : : ~: : : : : : . . . : : : . . : : : : : : : : : : : : < : : : : : : : : : : : : : . : : . : . :,' : : : : : > : : :
: : : : : : : : : : : : . : : : : : : : : : :~ : :_: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : . : : : : : : : : : : : : : : : : : : : .
. . . . . ~ . . . . . . -+." .:.... .';' . '.~' . . "I . . . . ~ . . . . . . ~. . . '. ..~.... : ~; . ......:..:: : . .' . . '.' ..:.-..... . '. ....:- . .' . . . . ....:-... J~ . .'
. ~ '1: . . ..:....:... . . . . . . . . . . . . . . . . ~. . .. . ~. .' . . t. . .. ~ . . . .' . '.' . ~ ,.. .. __ . . -1: .. CO . _ ...~.., \' . '.' . . 485.0Q
. . . , . , . , , , , . , , . , . . . , . . . . , . . . . . . . , . . . . . . . . . . . , . , , . , . . , . . . . . . . . , . . . . . . , . , . . , . . . , , . '. \'.. , ,:r--- : : :t
J ~ .,. ~ . . . . , . , . . , , , . ~. . . . . ". . , . , . . '-' , . , . . . . ..... . .. .............,. " . , , . . . . . . . . . , . . , . . . . . . . . " .,., '; L' . . f ". .
\\. ., . ~\'\ . 1 . , . . .
. . . ., . . , , . . . , . .' , .. . , , . . . . , , . . . . . , . . , . .. . .. . , . , . , , . . . . . . , . . . . , . , , . . . . . . . . . . . . . , . . , . , , . , , . , . , , .
'. ~: t....::.. . . . . , . . . . . . . . . . . . . . . , . . ',' . . , . . , . . . . . . , . . . . . . . , , . . . , . . , , . . . , , , , , . , . . '500 . YEAR' FLOOD EL' 482'00.
,. .,.,.,... .... , , , , . . . . . , . . .J. . . . , -.:.,.':: ~ .. , . r . . , , .
.. . , . . . , . . . , , . . , . . . ,. . . . . , , , . , . . , . , . , . . , . . . . . . . . , , . . , . , , . . . . , , . , . . . . , . . , . , , . . , , . ,. . . , , , , , , . . ,
, . . , .4 " . , , . . . . , , , , ' . z '; .
. , . . . . . , , . . . . . . . , . . , . , . , , . . , . , . . , . , . . . . , . , . , . . . , . . . . . . . , . . . . , , , , . , . , , , , . . . . . . . , . . , . , . . , , , . ,
, . , , . ". .....,.,.... , . ,. , . . . . . , . . ~. . . . . . . . . . .'. - . . . . , , . , . . . ~ - .', , , , . . , , , '1DO YF.A:R' FlOOD FI' 480,.'00 ~ . . . . . . , . . , . .
- ,.......",.."""..".,..,'.. ". .~ . .... .. .'..,..
. . .\ ..,. .. _ . I. _, _. .~ . _ _ . 180.00
490.00
,,--. ,,-+.
8' ~O"
.... ....
8' -0"
.... ....
107' _8"
.....
CROSSING SECTION
~;~:~~~~, -0" @
B ISSUED FOR PERMIT
A FOR CONCEPTUAL REVIEW ONLY
19MAY09 owe
28APR09 owe
NO.
REVISION'
DATE BY
3RES .. ' =ARSITHORNTON
ENGINEERING CONSULTANTS, Ltd.
21268 Hwy 99E, P.O. 370, Aurora, OR 97002 Ph:(503) 678-2434
Fax:(503) 678-5683
CAD DWG - DO NOT EDIT MANUALLY
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: 08708-IP-S12-P1
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
PIPE BRIDGE PLAN & ELEVATION
SCALE: 1/8" =."-0" DATE DWG. NO.
DRAWN BY: OWC 12MAR09
CHECKED: D 022091P
APPROVED:SHEET#S028
CUENf INTERNATIONAL PAPER
O\4S~ MILL WATER SUPPLY
~/a:Nr1Cf 801 42ND ST,SPRINGFIELD. OREGON, 97478
REV.
S
REV. DATE
28APR09
/15 of 2./ ptJOfS
'A
q l
~
'"
,
ji
s:
~
......
'"
I
N
..
o
,
N
,
I -
6' -6"
....
....
3'-3"
~
2' -0"
l' -0"
..... ...
.....
....
s:
~
......
l' -5"
..... .....
81/2"
co
---
....
., .
i
I
.... 01
:~
- , :\.:,) ..
r :. ·
I
-~~,
~.
.- .
PIPE SUPPORT
DETAIL f"1\
SCALE: 1/2"=1'-0" ~
~::="'~""""'''''.?''''''''''''''''''''''''''''''''...............................
~ : ~
.... ....-...~
:: -...~
........:......................1.. .~
wi . " ..j'...........
0.., I ....
a: ......
~I I
.1 I
~I I
~I I
I #4 CLOSED TIES @ 10"
~: V w/(2) ADDL. @ TOP
~I ........ .tt:'~ / ( 4)#5 VERT. w /STD. HOOK
-r~ " ~ . . @ BOTTOM
4 1.' ,10-.
. A. J #5 @ 10" E.W. TYP. T&B
!\ '<1. r
~" ,.'_1_1, ".~~; ;~ -r'. ': . ~.~~
'T" . ~ ' '. IJ <I: -Ii. .'t'~ Li:~.. c'. '. :r
'.<1 A .
, .' A .., A' .' . . .... 4
. . _ . 4..' .'. .
, 4!'1 0'" ,', t ,', "" ", ,.' . ... ,"
". ."
'-
T
.~.'
^
PIPE SUPPORT
SECTION fA'\
SCALE: 1/2"= l' -0" \:!!!.)
_ _ .....-... ;~';~/'Ji.'t.. f"':".- -
BEND 5" if) PIPES
OVER STIFF. PLATES
3/8" STIFF.
TYP. (4) LOC.
- --,:;;, ..~_:. _ -.l
nT ---...---. ~ - - - '.- ----
'"- 11"",1\.. ~ _ __-__ _ -,-.. ,_ ~
-- -' -' - - - - - _:.... -7....:. - - - - - - - - -...;
<<> > 1/4)
~ ,1A
<r ~
,/,
.~
.. , I
~
36"if) STEEL...pIPE
ASTM A 572.
~ . GRADE 50
.-{-It- ~~1/2" STIFF. PLATE
-4 .j- ~j-
---------~~--~~--------~
o
-i+-~
o
-l.lfr 3:
'WI ~
1/4 \
..-7 1/4/
II
I,
9 "
~ I,
tt') "
~ II
i I,
'~
v ~W A-A
A
. ..........
l'
1 C>I. "
;r
.
b~
~ ' "
I .
.. -----
...... ~ '.'
..........=
-~ .
, .q..~.,
f
..........
A
2 3/4"
4' -6"
2' -3"
....
s:
o
,
;.....
I
I
I
I
I I
. . . . . . .. . . . , . . .1. . .. . '1' . . . . .1. . . . . . . ~ . . . . . . . . . . . . . . .
, I
1 I
I I
,-,1 I-
I I
I 1
I I
. . . . . . . . . . . . . . .1. . . . . . . . . . . .(. . . . . , . . . . . . . . . . . . . .. · .
I I
, ,
I I
t I
I I
~~
~
,
=
to
I
i-r>
,~
A
.~
PIPE ANCHOR
DETAIL f2'\
SCALE: 1/2"=1'-0" ~
. #5 w /STD. HOOK EA.
END @ 12"
#5 HORIZ. @12"
TYP. EA. FACE
d
....,. ..
.
::
o
1
i-r>
:' , 'I I I.!.
::
o
I
(0
~
,
"I
=
o
,
N
, r
f _6"
- -
- -
SHEAR. KE"
PIPE ANCHOR
SECTION YB\
SCALE: 1/2"=1'-0" \.028)
::
~
~
....
1'-0"
....
5 1/2"
.
II
L{)
" ~~ ~t/4V
,~,
-r' '----- (4)7/8"(6 A325-N
::
o
I
~
,
T
PL 2'-xf-o'- SQ.
BASE PLATE
W10x30
(6) 5"<6 PIPES
....
---:1
~.~
-Hi
~
r~ )- . I
-~ l~
- 'WI ~ !
I
~
4&*
I
~*
3, ~~
V I 'WI
,.......
~
a:
..........
tt')
L{)
x
C'.I
3:
W12x65
(10)3/4"<6 A325-N
3 TYP. NS & FS
, r I" STIFF. PL
/ TYP. NS & FS
/'
,.......
l..tJ
...J
a:
..........
~
1/4V
tt')
L{)
x
C'.I
3:
~
V1
~
1'-9"
....
....
....
3' ~6fJ
.....
CROSSING SECTION
SECTION (E\
SCALE: 3/4"=1'-0" \:!!!.)
~
."
000'0:00
, " .
. #5 CIRCULAR BAR
~/ TYP. EA. FACE
./ ___ ,WRAP PIPE w/A MIN. OF 1/8"
, ~~ CARBON & GRAPHITE FELT.
~~ r (4)ADDL. #5x3'-9" LONG
~ 'J DIAG. BARS TYP.EA. FACE
- - - HOOK END OF BARS TO CLR. PIPE
~
, . ~
..-. -. j,.>i<. .
, .
-.--.----- .T'---,---'--'-
PIPE ANCHOR
SECTION /C\
SCALE: 1/2"=1'-0" ~
20.
, 1/2"(6 U-BOLT TYP.
w/BEVELED WASHERS
(6) 5"~ PIPES
L4x4x1/4 (BENT TO RADIUS)
CROSSING SECTION
SECTION m
SCALE: 3/4"=1' -0" \:!!!.)
I:
~
tt')=
~
L{) U')
I
~ co
..
.....
5' -4 1/2"
3'-1 1/2"
1'-5 1/4"
....
.1 ':""0"
t J( ....
....
--I .
I /'
L.l:1
-:~
<::1 .' -:.
. . . '.' .. ....7;. . . . . . . . . . . . . . . . . . . . . . . . .:;. . . . . . . . . . . . . . . . . . .
:/ I ---
-f-~ ~-
J
-I
l
I
-r
I
'b. b 10 ~
..I -..,...1' =,..1 t A ~ -
~C'.Io-
bl~' '- 029' ,
., .
N
d
;: Z
~~
.
,I
.1
s:
o
I
N
. I
b
t
~
!-
::
, to
,l
I
i - .
r-- -;::a..=
A.
= j i
o
..I,;:
~, 0
I
N
s:
U')
I
I,
......
'r
1 -'
I:
;J
-
~ -.
=
" to
. I
.. i-r>
~
I
10
A j
~
............. ........... .........~.:.:i..:.~ ............ ~
-. ~~ j
~ 029
" Ll
s:
o
I
b'i N
I
~, 'r
l
,
A
~ ~
~ ~
1 .11~'1 ~ J
~.'^ '.~ i~::.. '~~~
. .-:L II -III 11f-J~,--, f.~ : =-
, .J .'" : ~~#5CLOSED TIES
. \.. ,,- .,.. @ 6" o.c. w/2 ADDL. @ TOP
. ,\. ~ (6)#8 VERTS. w/STD. HOOK
.,! ~ ........... ~\ \.. EQ. SPACED
," A. A" <1J.
.......J'!. ~ oIIl
. (7)#5 3-WA YS
TYP. T &8
2' _0"
.... .....
PILE. CAP SUPPORT
DETAIL (3\
SCALE: 1/2"=1'-0" ~
<).
..
~
a:
~
L()
x
N
~
~
a:
. ,
<1 " II
. .
. .<1 . l.
. .~
A .... .. n . I :...-, , , 1
A . t. " 1\" '. .' '~. I' , I I
.<1. .
'.4A'
A .' . <f .:,A.'. .'. ~
'.or;; _ ;.',
'.' . \.
L - ... _:. <1, \:~ .
. 41 ." - -- ..... . '. . \ · '.
_!" ." '. .\
U. ..,.'
<1A i.~ A -:-. . :.:1' "1 \ .
... 4 .", ;- . . .~. '-- 1/2"x1" GROUT RING
: it ". i . .- - "''\.: ~..'. . #5 VERTS.@12"
4 . TYP. EA. FACE
, :.~."
j,.' <! . #5 w/STD.HOOK EA.
r" 9""",.1 · ~'~ ~;):5@H~~IZ. EQ. SPACED
#5 STIRRUPS @ 12"
: ....
1"')1"")
L{)L{)
x x
NC'J
i~
-f-
4
~
PILE CAP
SECTION
SCALE: 1/2"=1' -0"
fiY\
~
,
~~~-
TIME: HH:MMAM
PLOT DATE: XX/XX/XX
CAD NO: 08708-IP-S12-P1
CAD DWG - DO NOT EDIT MANUALLY
A ISSUED FORPERMIT
19MAY09 owe
NO.
DATE BY
REVISION
3 ~ES - =A ~SIT -to, ~NTON
ENGINEERING CONSULTANTS, Ltd.
21268 Hwy 99E, P.O. 370, Aurora, OR 97002 Ph:(503) 678-2434
Fax:(503) 678..5683
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
PIPE BRIDGE DETAILS
SCALE: 3/4" = 1'-0" DATE DWG~ NO.
DRAWN BY: owe 12MAR09
CHECKED: 0 022091P
APPROVED: lSHEET#S029
CUENT INTERNATIONAL PAPER
O\1SQ\J MILL WATER SUPPLY
I ~/a:NrK:r 801 42ND ST, SPRINGF'ELQ~ OREGON. 97478
REV.
A
REV. DATE
liP of 2/ paoe5
I.J
JJ
- - J!
I
- I
I
'T: -. TT:~;"'~~'~ ~
. 'i
01
I1r
I
I
I
I
.'l ~ .1
. ( t. --- . ----------------------------------------,- · ~ -----------~
1 :. -J.:;.- Ji",;"tt
. .'. '. ... .'. . i'. A'. ,\...~..,:_ e.: :' ...4 '. . .t.:" ~"':':...'" _:..~ ...:.... '. \ .~.~: ".:: ," .:;. .~ :.
"'4 . ...... ".,4. .-. ...... A " . . ...... ........ " J" . ....
.r ~ . ~~. : ....: .. r : "'!:. .~: A:. ..... '.' .' ~ ..J . . . -: ....:. ~. e .... Ii' 4' . .... ..'~. ." A... '.' .'~. ..'...... '.' .. " . . :
....
a"
---
;r
I
m
~
,
;r
"
t') ~
......
I
N
.l~ \
, 001-
J.
11 c.
.,; .. -
,
.;. 1-.-
" , :-1
. ..'
<II
~
I
r-...
..
.6. ",
A
~. : . 1
,'~ -
A
"h
I
N
"
"kt
A.
- ,
~ .-
..' ...~
..
. ..'
<II
..
.A .. .,
.' ..
. . .
.- ~ f
...
'1:' ..
. .
~ .
.. .'
15' -4"
..... 4"
...1=-
7' -0"
7' -4"
REMOVABLE
...-
;)
-.. u
f?~
-vqJ
I -
-Pf
~-
~
_t
-~-
I
/
I
PULL BOX PLAN
DETAIL (1")
SCALE: 1/2"=1'-0" ~
~
I
I
J
I
I
I
I
I
I
e,
j
I
I
I
I
I
I
I
"~ =?
J ' ....
I .
. '~IJ
I pl
I
I
\~
1/4" PLA TE FLASHING
42"f/J SLEEVE
~ I
1
'.~:...~;~:__~i 111_
A.
. ..
.. ~ ' .
. ;.
. 'A
. ~ .
\
.:;... ,
_SF
'. :
_____ .1-.. ~ .:. ____~----_-...:
,
~
- ---.-:~-- -
36"f/J STEEL . 36"{6 HOPE
J
ASTM A 572 GRADE 50 ASTM 03350 SOR 32.5
7' - 7"
NO SUPPORT
...
PULL BOX SECTION
SECTION. ~
SCALE: 1/2"=1'-0" \::3!:)
". .....
REMOVABLE CONC. COVER
I ;~~~:: ~~ \'~
A.
---- ....
\ n \\ \\ \\ \ _-_-_-_. -_- . I ,.A. .
\ . \\ \\ '\\ \\ \ ,.,......-,.,... --,.,... --,.,... --,.,... -- ...l- -:- . ::
, , ~-~-~-__-_ - :-.:.l
\ \\ \ \ \ \ \\ \ /' 'l ~ ...-? ~ ...-,.,... ...- ~. . :
\ , \\. \\ , \ /// /~ /p' /p' ~ //' . . :
\ , ~ ~ , " ... / ~ .
" ,~,~ '~'~', /'/# ~ ~ # /
'. ~'~~~~"" ,./ '/ ~ ..//. '/'/'
" ,........."........."........., ~..-c..~~:,.....-'..,.:..-""""r-:,.....-'./" ./"
, " ~-~~,.,... ,.,... -;:; ,.,... ./
........ ........ ........ ........ .~ :-<' ...- ...- ...-
---------~~~ :ELD ROUTE CONDUIT
~
'j
. .
4 .. -- . . - '. . '. A ... . -" . ~., :.
:'.' '.:~!: ~:~":>.' ....~.. .~:.:~ ~........~\...:.~. ...,,:~~:.~...~~:...~
.~f-~ ~ 4~""'" .~:~ ~.~ 4 4.:.~ ~'. ..:....,..:..:..~. ~ >. ..~..~~ .~~ ~:~ .:......: ~. . .....~~ ........~ ~. :;~::
PULL BOX SECTION
SECTIO'N fB'\
SCALE: 1/2"= 1 ' -.;0" ~
1yJ
i.
Qo~
I ~-
(0
':q-
~
,
T
A
.........
<0
I
or-
<:>
I
N
~
.........
A
i.
r---------~----------,
.. .. .... -~. I.
I .' .....i,:.6...:k .~ "'~'.':.:
I . :=:4..0' :. O' :0. '0':' ':0: '0' 4. ..!-.'. I
I ~ .' . . II . I
. A" '. ...A...., I
I · . . . " . 4.1" . . : .. .
:. :;::.A. ........ .' . : .'
. . i'< > I
I __--
i /r' ~\ !
-t f ,- I - , I
: \L~/ I
I \~ f ./ I
I .........-,-........ I
L___________________~~
, f
,I
"I
V ~WA~A
CAD DWG - DO NOT EDIT MANUALLY
TIME: HH:MMAM
PLOT DATE: xx/xx/xx
CAD NO: 08708-IP-S12-P1
A ISSUED FOR PERMIT
19MAY09 owe
NO.
REVISION
DATE BY
BRESHEARSITHORNTO"
ENGINEERING CONSULTANTS, ltd.
21268 Hwy 99E, P.O.' 370, Aurora, OR 97002 Ph:(503) 678-2434
Fax:(503) 678-5683
INTERNATIONAL PAPER
SPRINGFIELD, OREGON
PIPE BRIDGE DETAILS
SCAlE: 1/2" = 1'-0" DATE DWG. NO.
DRAWN BY: OWC t2MAR09
CHECKED: .0 022091P
APPROVED: SHEt..t # S030
CUENT INTERNATIONAL PAPER
Il'ASrn MILL WATER SUPPLY
,~/<XNrICf 801 42ND ST,SPR1NGFIELD, OREGON, 97478
REV.
A
REV. DATE
17 of 2/ pa1es
b
I
..
~
b b
I I
(0 ~
~ T"""
b
I
(0
tor)
b
I
..
T-
~
I
or-
~
b
I
b
N
00"
I<=?
(02
b
I
N
e
DRAWING NO.
l' -0"
3' -4"
M.D.
'.~
21 ' -4"
19' _4"
~
33'-4"
~
16' -0"
1 ' -0"
12' -0"
. (i2B\ lYP EMBED_
L ----\.::J 8 PLACES
J
f(///////////////////////////////////////////~
~.
~
~
~
~
~
~
~
~
~
~ I
~
~
~
~
~
~
~
~
~
.~
~
%
~
~
~
~
~-
~/~
~
16' _0"
~
3' ~4"
M.O.
1 ' _0"
2' -0"
. I
1 0' -0"
(0
b
I (0
N I
..
0r-
=:
00
(#6 @ 12" MAX OC
. . EA WAY TOP & BOT
'. ' ;
\V'
IllElllSlIl
..:::.>
~
,..
"-~/4" (-) GRAVEL
.. 0:::
.. -.I
C\10
.. 0:::
.. -.I
tt>0
t'f38\RAFT FOUNDATION REINFORCING
~ SCALE: 1/2" = l' - 0"
o
..'
or-
.~ (00-
, ..I ~
b b C\1
I I (0
10 b
or- N
b
I <0
N I
..
or-
00
o
,
e
..
'C""'"
l' -0"
FOUNDATION PLAN - MCCBLDG, TRANSFORMER & GENERATOR SLABS
SCALE: 1/4" = l' - 0"
REFERENCE
REF DRAWING. NO.
NO.
REFERENCE
I
I
REF I REV
NO. NO.
BY
DATE
TI /15 @ 48" MAX OC
: I : IN HORtZ BOND BEAMS
; == ] SEE BLDG ELEVATIONS
~ =.___ #5 @ 24" MAX OC VERTICALLY
,... SEE BLDG ELEVATIONS
~-=.
; - ~
'f ,,1
,
. .
j~ .;
8" SOUD GROUTED CMU WALL
~-:;m:-;
, ,
-SEE DET "118"
/
J
\V
.. 0::
.. . -.I
C\10
..:::.>
.. 0::
.. . -.I
t">0
fl28\ EMBED FOR CANOPY COLUMNS
~' SCALE: 1" = l' - 0"
REVISIONS
......,'{
l
I
I C
I B
A
REV
NO.
- s.-y-'
~ '.
II I 1:111 S III
rr~
,.
"-3/4" (-) GRAVEL
CMU WALL CONN TO FOUNDA TrON
SCALE : 1/2" = l' - 0"
PL 3/4 X 12 X 12 WITH
2" DIA VENT HOLE AT
CENTER OF PLATE .
\
'IiIl!lIII"
10
\
"
~:~:J
__ C.L (2)3/4" DIA X 8"
---- NELSON WELD STUDS
Al 8" GAGE EA WAY
8" (4 STUDS PER PLATE)
PETE 12/5/08 ISSUED FOR BIDDING PURPOSES ONLY
PETE 8/8/08 ADDED DOUBLE DOOR
PETE ,.,~/?/~~_.I?SUEq FOR INFORMA TIONONL Y .
BY DATE REVISIONS
RENEWS 12-31-08
it
0:::
W
>
::
o
I
~
'C""'"
it
02
w
>
r
!
i
I
I
i
I
I
I
I
!
j
!
I
i
I
I CCP JOB NO.
I 08-128
VERIFY
~.
4
(.--""
~ -:
--'/
25' -0"
VERIFY
VERIFY
;-.--
: - ~
~__I.-/
C.L AIR RECIEVERS
(fT9\.J1~ .... AIR R. ECEI,VER .,.FOU..NDATION PLAN
~ SCALE. :1/4" = l' - 0"
C. C. Peterson Engineering
,,,.. .~" .,,'''''~, .,." .' ""'" ., ." ,," ,," ,'" ." d " ... "" , .
Consulting Engineers
2644 N.E. 26th Ave
Portlan~ Oregon. 97212
Phone (503) 287-5532
Fax (503)282-7226
Weyerlaeuser
I FORBIDDING
I PURPOSES ONLY
DECEMBER 05, 2008
W\::;J~JI~ .
Containerboard Kanufactl,u,iug, ~i'J.iugfield, Oregon
RIVER 'vi A TER INTAKE PROJECT
MCC BLDG & EQUIPMENT FOUNDATIONS
FOUNDATION PLAN AND DETAILS
lo, ."
I DRAWN BY: PETE
~
! CHECKED BY:
l-
IAPPROVED BY:
l-
I SCALE: AS NOTED
... ,. .. .".. " "". . ,,' ~, ."
OB-XX-OB
~'FILE: . KGS-262~:[)~:B
; DRAWING NO.'
DATE
SHEET REV
OF
I g of 21 pOfjes
'0
I
;(0
to
i'
b b 00
I I I
(0 ;,.. ~
b b
I I
b ~
N
b
I
b
I
;,..
b
I
~
b
I
;,..
b
I
;,..
21 t -4"
1 t -0"
19' -4"
6' -5"
6' _6"
~.~
GUTTER
ro
I
;,.
. [J----
I K.B.
I .
I~
I.'
W8X24
B-24
U1
....-
>or-
X
00
()
W8X18
B-23
.q-t!)
N",
xI
~m
TRANSFORMER CANOPY
I
- ,
W8X18
B-22
ro
I
;,..
I
:~~
I
LJ
(f52\t447\
~.~
- ,
I
,
~
o
I
........
.......... .."""".
...
or-
C4X5.4
C4X5.4
C-'
Z
Ci
-1
5
m
()
()
~
N""-
x~
001
3:m
or-
"'....-
x~
001
3:m
(148\
'S'
,4
C4X5.4
, " "......
''''''''1
----"
~~.
(f5i\' (f46\
'S'~
4' _8"
4' _0"
4' _0"
21 '_4"
c:0
- ,
6' -5"
-~
t.q
. - ~ - ...:: (J-,
......... K. B. I r
ail I
~l
I
1 ' _0"
~
I
J
~
~
6----
K.B.
~
----~
K.B. I
.1
tl:!,
~
I
r I
I I
....-
X
00
()
-..t'LO
"'",
Xl
oom
3:
~
W8X18
B-21
I
~I
~l
I
. ~(l-
W8~(24 .
B- -34
.........
I I
I I
C8X 11.5
00....-
""-1"')
XI
oom
3:
>-
a..
o
z
<(
()
a:::
o
~
a:::
w
z
w
C-'
C8X11.5
i. .
C4X5.4
C4X5.4
C4X5.4
GUTTER
4' _0"
4' -8"
OON
""-1"')
XI
~m
-..tl"') a:::
~ I"') , I wI::
00 I I I::>
3:m C-'
, :: e
K.B.
0----
I
~I
~I
K.B. I
----0
r r
r I
W8:~24
B- -34
~
,~~
l' -0"
5' _0" 5' _0"
l' -a"
12' -0"
ROOF FRAMING ::> _AN
SCALE: 1/4" = l' - 0"
2, 1 /2" ,.
1 ' -0 .
C.L. 3/4" D1A
A325 BOLTS-
PL 3/8 X 4 X 0'-5 1/2"~ I METAL ROOFING
SEE SPECS
:LJ \ I LI \...r-L1 L' ~1-J \ I~ l___ RAKE TRIM
--II I . p--
? W8 n J'L" W8 ~ RAKE CHANNEL
N
::::-- W8
N
@ W8 TO W8 CONNECTION
~ SCALE: 3/4" = l' - 0"
'.,
DRAWING NO.
r
I
REFERENCE
REF DRAWING NO.
NO.
2 1/2"
- -~ J
1 '-0"
C.L. 3/4" DIA
A325 BOLTS -
PL 3/8 X 4 X 0'-51/2"
-
-----.,-,
~
~
I-~--
~-!-
~ '
. ::
~
-
C\I
tf42\, C8TO W8CONNECTION
\09' SCALE: 3/4" =1', ~ O~'
REFERENCE
I
I
I
~". 0....' .." ",
REF I REV BY DATE
NO. I NO.
1'-1 _j
METAL ROOFING
SEE SPECS
GLJ III:.R
RAKE CHANNEL
REVISIONS
b
I
r-
b
I
Co
b b b
I J t
Co Co b
....- C\I
b
I
Co
b
I
..
....-
1 ' _0"
"0
....-
I
b
....-
)
. I
REMOVABLE SHEET--.X' . . . ,I
METAL INFILL
I
REMOVABLE ,/ I
TRANSOM. I 3--0 I
7-0
DOOR
21' _4"
-r
"0
I
;,..
....-
o .
lq
b~
~
~
o
1 ':...-("
o
~
.........
....-
X
co
'X
co
Cf)
I-
rr
I~
BUILDING ELEVATION
SCALE : 1/4" = l' .;.. 0"
21 '-4" .
19' _4"
.
C=I~~
[MFJAL ROOFING
SEE SPECS
Wl1~ I
-- .~
~~<-:,
~ ~'5t
~~7
~-;,
TY~1!4V Y I~
....-
X
co
X
~ 1 ..I~
TY~1/4V ~
l-r -
~I
.........
X
co
X
co
Cf)
I-
3' -0"
lYP
n n
I~
~
f138\. .. ,.BU.IL. DI.N. ..G ELE\(A TION
~ SCALE: 1/4" = l' - 0" .
4 1/2" .
."" --- J
"
I
C.L. . (2) 3/tt" DIAA325
BOETS ,AT 3 1/2" GAGE
(4 BOLTS PER CONN)
~ I
-~-=~
---..vw
=-.
PL 1/2 X 6 1/2 X 1'_0"
. W.P.
. TS6 X 6.X 1/4 COLUMN
~, TYPICAL W8T,Q TS6X6 COL CONN
~ SCALE: 3/4" = l' - 0"
D
C
B
A
REV
NO.
PETE 12/5/08 ISSUED FOR BIDDING PURPOSES ONLY
PETE 8/11/08 ISSUED FOR INFORMATION ONLY
PETE 8/7/08 ISSUED FOR INFORMA TlONONL Y
PETE t3./f?/08, IS?,~,~!?.,.,~9,~..t.NFORMA TlON ONLY
BY DATE REVISIONS
1 ' -0"
;,..
....-:-
ro
I
;r b
I b
N
I
b
10' -0"
l' _On
1 ' _0"
b
....-
TYP
N
I
b
I
N
..
..- ,
....-
N
I
.q-
.........
~
..-
TYr?-1/4V
~
.\'. .j
,Cf)
I-
rJ '
~
1 ~ -0"
14' _On
1 ' -("
.~
METAL ROOFING~ W.P. TOP O~' I
SEE SPECS STEEL , --1
-~-'':' I
I. ~ ,---~- --=-.J..- _W8Z?_4=S-=~- -,-
L...Jb.t= ~ - . I
\~ I
~ ~ 1~
#R~ 1
~~~
I ~!4V (TYP
I.
3' _0"
lYP 'I
~
.........
.q-.
.........
~
X
CO
X'
CO
Cf)
I-
~ J
I
..-
X
~. .
co,
f!2 . /1!4V
n n
(TYp
rr
~
I
I
C
-,'~
~I
.........
3' -0"
TYP
....-
X
CO
X
CO
Cf)
I-
'n u'
I~
~
20' _0"
18' _0"
1 ' _0"
[META. L ROOFING
SEE SPECS
W8X.16 I - - i.=J
~~. I
~:~
~~
'Sf
TYP)1/4V VI ~
~
X
CO
X
TY~ 1!4V \1 ~
'n II
~
BUILDING ELEVATION
SCALE: 1/4" = 1~ - 0"
20' -0"
REMOVABLE SHI:.t.1
METAL INFILL
REMOVABLE
TRANSOM
REMOVABLE-
JAMB
I
I,
~
o ~~L~~~~~.: 1~~~!ATION
7 5/8"
~
.........
~
r L4 X 3 X 5/16 X 0'-10 1/2"
. \ , NEAR SIDE AND FAR. SIDE
~ ' . . SHIP ANGLES LOOSE AND AlTACH
~ ~ . . .IN FIELD WITH 1/4" FILLET WELDS
~ ~ ALL AROUND
, ~
~ ~
~ ~ bb_ . ,,::. - - _. =I
" .!..~- r '--
~ . r
~' ~Llc,=-L f~ r
i r 3T-r1 ~FOR CONNECTION
~ -~ I DETAIL SEE "143"
; ,
~ ~ I I I... TS6 X 6 X 1/4 COL
~ ~ I I
, I
~ 'I
00 I
C.L. (2) 3/4" DIA A307 ALL THRD I
AT 5 1/2 GAGE (FOUR BOLTS PER
CONN), EMBED 5" AND SECURE WITH
"HILlT J HIT HY -150 ADHESIVE
(OR AN APPROVED EQUAL)
BOLTS MAY NEED TO BE INSTALLED
PRIOR TO STEEL ERECTION DUE TO
DRILLING ACCESS
@
~\1C'1'l1c\>
~ --1
<$ :::...,,~'t'U PROFrs~ -t
~~GIN~ ~
~ . ~
Q;? . #9623 ~
RENEWS 12-31"';'08
I CCP JOB NO.
08-128
W8 CONNECTION TO CMU WALL
SCALE: 3/4" = l' - 0"
I
- --=u
I
I I
I
I I
I
I
b
I
;,..
3-0 3-0.
7-0 o. 0 7-0
DOOR DOOR
I
-L
T:
"0.
lq
b~
I~
FOR BIDDING I
PURPOSES ONLY
DECEMBER 05; 2008 I
~
.NOTES..;
1. ALL WELDS ARE 1/4" FILLET WELDS ALL AROUND
UNLESS. OTHERWISE NOTED ON THE DRAWINGS
2.
FOR SPECIFICATIONS SEE DRAWING NO. KGS-265-D
,
i Weyer~laeuser
c. C. Peterson Engineering
_~"., " ...' "," "... .. ,,,,.., "~ ,~ " ,I".., . .. . ".,.. ."., "., .. .
Consulting Engineers
2644 N.E. 26th Ave
Portlan4 Oregon 97212
Phone (503) 287-5532
Fax (503)282-7226
Wl;;J".,\11aeaJSer
Containerboard Manufacturing, Springfield,. Oregon
\b'RAWN'BY:PETt
1 CHECKED BY:
I APPROVED BY:
! SCALE: AS NOTED
'68~06.~08'
DATE
RIVER 'vi ATER INTAKE PROJECT
MCC BLDG ~ EQUIPMENT FOUNDATIONS
FRAMING PLAN" SECTIONS ~ DETAILS
.. .'. '..',. '." .' ...,.. ..",.,,,... ."
FILE: KGS-263-D-D
DRAWING NO.
SHEET
OF
REV
11 of 2/ pagGS
!-x :x x. x -x- x x x x---; .;
J w-u. Ll U U w-u ~1..r;-'
.I l..,; .I
, ,
, J I
'... I I
, ~
I I
.I I
- .I
~ .I
__ _Ii..
7 ;
'. ,
, .I
.I .I
,I .I
'-- --
~-- -I'
I .I
~. ~
, 1
~..-i
/.. ,I
, .I
, .I
~ .I
7,=-"-;
~. ,
~' .I
1"
'"
..........
'" ~
" ...r
..q-
{SINGLE PLY ROOF
.. . SEE SPECIFICATIONS
,_
x .x x_x x~
_x_x-
w-u \.F\..J Ll ~
~COMPOSITE METAL ROOF DECK
(SEE SPECIFICAtTONS)
DECKING MUST BE LAID OUT AND
INSTALLED SUCH THAT A LOW FLUTE
LANDS ON THE F.B. EMBED ON BOTH
THE HIGH AND LOW SIDES OF THE BLDG
3/8 X 4 1/2 F.B. WITH. 1/2 X 5 NELSON
WELD STUDS AT 24" MAXO.C.
-8" SOUD GROUTEDCMU WALL
SEE SPECIFICATIONS FOR REBAR
LOCATION AND SPACING
1"
NOTE:
SEE SECTION "146n FOR
ALL MATERIAL CAll OUTS
#5 CONT ~
~ "~--1 x~Ll x
- 'f 1
.I j
18 GAUGE ~
EDGE FORM · = 7
,I .I
.I I
I, .I
~ I
_ _.L
; ')
.I I
.I .I
.I I
4- _~
3 -7
.I ~"
;~"-l
I '
,I
,I
.I
-LLi
LOW WALL
,ff47!\.H2o..46.'3'0 " DECK TO WALL CONN
~ SCALE: 3/4" = l' - 0"
tf46\246'03'. DECK TO WALL CONN
~ SCALE: 3/4" = l' - 0"
1"
SINGLE PLY ROOF
SEE SPECIFICATIONS
::
N
..........
N
"
~
.q-
.,...
..q-
#5 CONT
18 GAUGE
EDGE FORM
;r FLASHING
C.L (2) 5/8" DIA M07 ALL THRD j
AT 6" GAGE (lWO BOLTS PER
CONN~ EMBED 5" AND SECURE WITH
nHIUT HIT HY -150 ADHESIVE
(OR AN APPROVED EQUAL)
HIGH WALL
1"
_~ r--\ ,
.e?'"
\1 \.r-\I
\ r--\ I
...
:;-
-x -x
x- x -x x
W8X21
x
x----x--
.
\~...
. ~ 2"
-'
I
~,
- /
/ .I
~ .I
__._L
.,-'--
.I .I
/ .I
/ .I
;I t.;tJ j
,(..-, -
.I -,.
;I ;I
/ ;I
- ;I
j ,
-'_ _t.
--. -;
/ ;I
.I .I
.I .I
~ .I
~ =u.-;
/ ..1
--t.-...f ;I
~
-----:-
8" SOUD GROUTED CMU WALL
SEE SPECIFICATIONS FOR REBAR
lOCATION AND SPACING
NOTE:
SEE SECTION n151 n FOR
ALL MATERIAL CALL OUTS
I-
::J~
00
0::::-1
0-1
:: <(
LOW WALL
~. ~c~:~3;;~1~0~L CONN - HIGH WALL
@.12'.....6~3...;~ BEAM TO WALL CONN
~ SCALE: 3/4" = l' - 0"
DRAWING NO.
f,q..,
L ...
~~ j DRAWING NO.
REFERENCE
REF REV
NO. NO.
BY
DATE
REFERENCE
, .(. COMPOSITE METAL 1 1/2"
ROOF DECK - -
, . SEE SPECIFICATIONS
;~,x x fX' X -x. x- x .x xl- -x -f
-.. ~.--~------.-~----+. -,
/. r . ~l
~- ii\ ~~ C4X5.4 ! ~ I
~ ~\:F.B. 1/2 X 5 X 0'_9"L...~W8 ROOF BEAM
-; ~ FOR EMBED -3/8 X 4 F.B. CO. N. N PLATE
~ ~ SEE DET "146" FIELD ATTACH C4 TO 3/8 F.B. WITH
~= =~ 1/4" FILLET WELD TO TOP & BOT FLG
I ;
~ ~... 8" SOLID GROUTED CMU WALL
~~ _~ SEE SPECIFICATIONS FOR REBAR
-; -- -; LOCATION . AND SPACING
/ ;
I ;
~ ;
~ 1l-~'
, ;
; .I
_C-y
SINGLE PLY ROOF
SEE SPECIFICATIONS
(f4"8\EN) W.ALL LA TERALSTRUTS ,
~ SCALE: 3/4" = l' - 0"
'( ,
#5 CONT~. .
18 GAUGE ~\ COMPOSITE METAL ROOF DECK
~D:E FORM~. _;;: . x-t-x S~ SPxECIFI~ATI~~S x x_I-
~ g I@ ~ \' \ I \ r-\ I \ I \, 1 I ,-~...c:::l...?-
0-1 _ ": .
~<( 2"~:... .. t). .W8X21
~:=f/1/4V. . .
~. ~PL 3/4 X 5 X 0'-11" MILL TOP SURFACE
~'=_:~ AT 1.90 DEGREES (0.40" TO 12")
/ ....~
~: ,...... '(2) 5/8" DIA X 1'-4" A307 BOLTS
~-=-'_~ AT 8" GAGE
~ ;'
; I
/ I
;I .I
A!~,_~
"j-- ;-
.I I
.I .I
~ /
-,_._t.
-- ;
~ /
, ;-1. _
~EGON~
~"A (o.'b ~
~~ 7i1J. 14. \~ ,p
~4'CF' V~\~
(,; C.
REVISIONS
B
A
REV
NO.
PETE 12/5/08 ISSUED FOR BIDDING PURPOSES ONLY
PETE .~!~,~..l9,~...~??~~I?....~2~, INFORM,i\ TlON <?Nl Y
BY DATE REVISIONS
RENEWS 12-31-08
I CCP JOB NO.
08-128
~
"
~
.q-
~
j.......FOR..BIUnINa.._.._.
1 PURPOSES ONLY
I..,.,......~~ECEMBE~ 05, 2008 ..'" ..i
NOTES;
1. ALL WELDS ARE 1/4" FILLET WELDS ALL AROUND
UNLESS OTHERWISE NOTED ON THE DRAWINGS
2. FOR SPECIFICATIONS SEE DRAWING NO. KGS-265-D
,
i Weyer~1aeuser
RIVER 'vi A TER INTAKE PROJECT
w~~~~, MCC BLDG ~ EQUIPMENT FOUNDATIONS
Containerboard Manufacturing, Springfield, Oregon SECTIONS AND DETAILS
lORAWNBY:PETE
r CHECKED BY:
).
I APPROVED BY:
i SCALE: AS NOTED
08-11-08' t ".", ."
: FILE: KGS-264-D-B
: DRAWING NO.
SHEET
OF
REV
e.C. Peterson Engineering
,,, '. ",' -.", ",.. """'"''''
Consulting Engineers
2644 N.E. 26th Ave
Portland, Oregon 97212
Phone (503) 287-5532
Fax (503)282-7226
DATE
2f) of 2/ pCt~es
GENERAL CONCRETE NOTES
1.
SPECIFICATIONS
DESIGN, MAl t..tdAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE FOLLOWING
CODES. AND STANDARDS CONTAINED THEREIN. UNLESS OTHERWISE MODIFIED ON THE
DRAWINGS OR IN THE SPECIFICATIONS.
2006
ACI 211
ACI 301
ACI 302
ACl 305
ACI 306
ACI 308
ACI 318
ACI 347
ACI 504
ACI SP-66
AWS 01.4
MSP-1-01
INTERNATIONAL BUILDING CODE
STANDARD PRACTICE FOR SELECTING PROPORTIONS FOR NORMAl, HEAVYWEIGHT,
AND MASS CONCRETE
SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS
GUIDE FOR CONCRETE FlOOR AND SLAB CONSTRUCTION
HOT WEATHER CONCRETING
STANDARD SPECIFICATION FOR COLD WEATHER CONCRETING
STANDARD PRACTICE FOR CURING CONCRETE
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE
GUIDE TO FORMWORK FOR CONCRETE
GUIDE TO JOINT SEAlANTS FOR CONCRETE STRUCTURES
DETAlUNG MANUAL
STRUCTURAL. WELDING CODE-REINFORCING STEEL
MANUAL OF STANDARD PRACTICE
(CONCRETE REINFORCING STEEL INSTITUTE)
RECOMMENDED PRACTICE FOR "PLACING REINFORCING BARS" .8th EDmON
CRSI-P1
2.
.QQNCKt..1 to.: MIX
CONCRETE SHALL DEVELOP A MINIMUM OF 4,000 PSI COMPRESSIVE STRENGTH IN 28 DAYS
UNLESS NOTED AND SHALL HAVE A CEMENT . CONTENT OF NOT LESS THAN 564. POUNDS (6
SACKS) PER CUBIC YARD. THE PROPORTIONS OF THE MIX SHALL BE IN CONFORMl1Y WITH
ACI 211.1 AND 301.
3.
GENERALlY, . THE AGGREGATE SIZE SHAlL BE AS FOLLOWS:
MAXIMUM SIZE
COARSE AGGREGATE
(INCHES)
1 1/2"
1"
1"
1 1 (2"
3/4
TYPE OF
STRUCTURE
FOOTINGS
SLABS. ON GRADE
WALLS. MORE THAN 1 0"
WALLS MORE THAN 18"
ALL OTHERS
4.
PROPORTIONS OF AGGREGATE TO CEMENT FOR ANY CONCRETE MIX SHALL BE SUCH AS TO
PRODUCE A MIXTURE WHICH, CONSISTENT WITH THE. METHOD OF PLACING, WILL WORK
RtADILY . INTO CORNERS AND ANGLES OF THE FORMS AND AROUND REINFORCEMENT
WITHOUT PERMlmNG THE MATERIALS TO SEGREGATE OR EXCESS WATER TO COLLECT ON
THE SURFACE.
MAXIMUM WATER/CEMENT RATIOS FOR CONCRETE WHEN STRENGTH DATA FROM FIELD
EXPERIENCE OR TRIAL MIXTURES ARE NOT AVAILABLE:
CONCRETE
STRENGTH
NON-AIR ENTRAINED
CONCRETE
AIR ENTRAINED
CONCRETE
5.
4,000 PSI 0.44 0.35
AIR ENTRAINMENT SHALL. BE 5. PERCENT (PLUS OR MINUS 1.5 PERCENT) UNLESS
OTHERWISE NOTED.
CONCRETE SLUMP SHALL BE 3" TO 4".
TOLERANCE FOR CONCRETE SLUMP MORE THAN 2" THROUGH 4" SHALL BE PLUS OR
MINUS 1 INCH, PER ASTM C94.
ADMIXTURES TO BE USED IN CONCRETE SHALL BE SUBJECT TO PRIOR APPROVAL BY THE
ENGINEER.
.B.EINFORCEMEtU
REINFORCING ::>1t..l:.L SHAlL BE DEFORMED BARS CONFORMING TO ASTM A615 GRADE
60 FOR ALL MAIN REINFORCING AND GRADE .40 ALL FOR TIES AND STIRRUPS. ALL
REINFORCING STEEL THAT. IS TO BE WELDED SHALL BE DEFORMED BARS CONFORMING TO
ASTM A706.
FIELD BENDING OF REINFORCING STEEL SHALL NOT BE DONE WITHOUT AUTHORIZATION OF
THE STRUCTURAL ENGINEER.
REINFORCING ::> I t:.t:.L SHALL NOT BE BENT OR DISPLACED FOR THE CONVENIENCE OF OTHER
TRADES UNLESS APPROVED BY THE STRUCTURAL ENGINEER.
PROVIDE A MINIMUM COVER OF 3 INCHES FOR REINFORCING STEEL WHEN THE CONCRETE
IS PLACED DIRECTLY AGAINST THE GROUND.
PROVIDE A MINIMUM COVER. OF .2 INCHES FOR BARS LARGER THAN NO. 5 AND 1-1/2
INCHES FOR NO. 5 BARS OR SMALLER IF AfTER REMOVAL OF FORMS THE CONCRETE IS
EXPOSED. TO THE WEATHER OR IN CONTACT WITH GROUND.
THE PROPER TYPE AND QUANTITIES OF ACCESSORIES SHALL BE FURNISHED TO HOLD THE
REINFORCING ~1l:.t.L IN PLACE WHILE THE CONCRETE IS BEING PLACED.
STANDARD REBAR HOOK LENGTHS: #4=8", #5=10",#6=12", #7=14". #8=16" &; #9=19"
LAP SPLICES FOR ~3 THRU #6 BARS 49 DIAMETERS OR 2'-0" MINIMUM
LAP SPLICES FOR 7 THRU #11 BARS 62 DlAMt.1 t.t<~ MINIMUM
LAP SPLICES FOR 3 THRU 1/6 TOP BARS 64 DIAMETERS MINIMUM
LAP SPLICES FOR 7 THRU #11 TOP BARS 80 DlAMl:.1t.KS MINIMUM
NOTE: TOP BARS ARE BARS WITH MORE THAN 12 INCHES OF CONCRETE BELOW.
PROVIDE CORNER BARS FOR ALL HORIZONTAL WALL STEEL AT ALL CORNERS AND
INTERSECTIONS. CORNER BARS TO BE SAME DIAMETER AND SPACING AS HORIZONTAL
REINFORCING. CORNER BAR LENGTHS SHALL BE 48 BAR DlAM!:.. t:.KS OR 2'-0" MINIMUM
PRIOR TO SHIPPING OF REINFORCING STEEL TO THE FIELD, SHOP DRAWINGS SHALL BE
SUPPLIED TO THE ENGINEER FOR. REVIEW.
,ANCHOR BOl..IS
ALL ANCHOR BOLTS SHALL BE SUPPUED AND INSTALLED BY THE CONCRETE CONTRACTOR.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19. ALL ANCHOR BOLTS SHALL BE A307B UNLESS OTHERWISE SHOWN ON THE PLANS OR NOTED
IN THE SPECIFICATIONS.
20. ALL ANCHOR BOLTS SHALL BE SET WITH TEMPLATES.
.FORMWORK
21. FORMWORKSHALL BE IN ACCORDANCE WITH ACI-301 AND ACI-347.
22. ACI SPECIAL PUBUCATlON 4 SHALL BE USED. AS A GUIDE.
23. WHERE WOOD FORMS ARE USED, THEY SHALL BE PLYFORM OR GRADED EXTERIOR TYPE
PLYWOOD. GRADE B-B OR Bt.t1t:.R.
C;ONSTRUCTlO~
24. PLACING OF CONCRETE SHALL BE IN ACCORDANCE WITH ACI-301 AND ACI-304.
25. PUMPING OR PNEUMATIC CONVEYING EQUIPMENT SHALL BE OF. SUITABLE KIND WITH
ADEQUATE PUMPING. CAPACITY. PNEUMATIC PLACEMENT SHALL BE CONTROLLED SO THAT
SEGREGATION IS NOT APPARENT IN THE DISCHARGED. CONCKt:.. i. THE LOSS OF SLUMP IN
PUMPING OR PNEUMATIC. CONVEYING EQUIPMENT SHALL NOT EXCEED 2 INCHES. CONCRETE
SHALL NOT BE. CONVEYED THROUGH' PIPE MADE OF ALUMINUM OR ALUMINUM ALLOY.
26. ALL EXPOSED EDGES OF CONCRETE SHALL HAVE A 3/4 INCH 45 DEGREE CHAMFER.
27. REFER TO MECHANICAl, PIPING AND ELECTRICAL DRAWINGS FOR EMBEDDED ITEMS.
28. SPECIAL INSPECTION SHALL BE PROVIDED FOR All CONCRETE WORK WITH CONCRETE
STRENGTHS IN EXCESS .OF 2.500 PSI, EXCEPT FOR NON.....STRUCTURAL SlABS ON GRADE.
INSPECTION SHALL INCLUDE. REINFORCING PLACEMENT AND CONCRETE TESTING IN
ACCORDANCE WITH IBC CHAt"' I t..t< 17. INSPECTORS FOR THIS WORK SHALL BE EMPLOYED
BY THE OWNER.
DRAWING NO.
REFERENCE
REF DRAWING NO.
NO.
REFERENCE
GENERAL STEEL NOTES
1.
SPECIFICATIONS
DESIGN FABRICATION AND ERECTION OF ::> I KUCTURAL STEEL SHALL BE IN ACCORDANCE WITH
THE "MANUAL. OF ::>1l:.t..L CONSTRUCTION" OF AMERICAN IN~IltUTE OF STEEL CONSTRUCTION.
THIRTEENTH EDITION, UNLESS OTHERWISE MODIFIED ON THE. DRAWINGS OR IN THE SPECIFICATIONS.
MATERIAL SHALL MEET THE REQUIREMENTS OF THE FOLLOWING SPECIFICATIONS. UNLESS
NOTED OTHERWISE:
2.
WIDE FlANGE SHAPES
H-P1LES
M, S. C. MC &; ANGLES
PLATES AND BARS
PIPE
STRUCTURAL TUBING
WELDED STEEL
ELECTRODES
MACHINE BOLTS
HIGH STRENGTH BOLTS
ASTM.A992
ASTM A572 GRADE 50
ASTM A36
ASTM A36
ASTM. A53. TYPE E OR S, GRADE B
ASTM A500, GRADE B. Fy=46 KSI
AWS 01.1
AWS E70XX
ASTM A307
ASTM A325
lWO COPIES OF CERTIFIED MILL TEST REPORTS ON ALL ASTM MATERIALS. USED IN THIS
WORK SHALL. BE FURNISHED TO THE SPECIAL INSPECTION AGENCY.
~ECTlONS
ALL SHOP CONNECTIONS SHALL BE WELDED OR MADE WITH HIGH STRENGTH BOLTS UNLESS
NOTED OTHERWISE.
ALl HIGH STRENGTH BOLTED CONNECTIONS SHALL BE BEARING TYPE WITH THREADS
INCLUDED IN THE SHEAR PLANE UNLESS NUII:.tJ OTHERWISE. BOLTS SHALL BE TIGHTENED
TO A "SNUG TIGHT" CONDITION IN ACCORDANCE WITH AlSC SPECIFICATIONS
5.1 IF 1/8" OVER-SIZE HOLES ARE DESIRED DUE TO. STEEL BEING GALVANIZED. THEN
FRICTION TYPE CONNECTIONS WILL BE REQUIRED RATHER THAN BEARING TYPE
CONNECTIONS
5.2 WITH FRICTION TYPE CONNECTIONS. THE FAYlNG SURFACES AT EACH CONNECTION
NEED TO BE ROUGHENED BY MEANS OF HAND WIRE BRUSHING. POWER BRUSHING
IS NOT PERMII I t..tJ.
5.3 BOLTS NEED TO BE TORQUED IN ACCORDANCE WITH AlSC SPECIFICATIONS FOR
SLIP-CRITICAL (FRICTION TYPE) CONNECTIONS.
GUSSET PLATES SHALL BE 3/8" MINIMUM THICKNESS.
NO FIElD BURNING OF BOLT HOLES WILL BE ALLOWED.
.cONSTRU~TlON
ERECT08~SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING NEEDED FOR STABIUTY
UNTIL STRUCTURE IS COMPLETE.
STEEL ENCASED IN CONCRETE SHALL NOT BE PAINTED.
STAIRS AND PLATFORMS SHALL BE SHOP ASSEMBLED WHERE SHIPPING AND ERECTION WILL
PERMIT.
.sHOP DR(\WI~
SHOP DRAWINGS SHALL BE SUBMIIIl:.D TO THE ENGINEER FOR APPROVAL Bt:.ruRE STARTING
FABRICATION.
WELDING
WELDER Ct..t< IIFlCATION PROCEDURES SHALL BE AS FOLLOWS:
A. ALL WELDERS SHALL BE CURRENTLY CERTIFIED AND REGI::>It:.KED BY THE LOCAL BUILDING
OFFICIALS AND/OR THE AMERICAN WELDING. SOCIETY AND. IF REQUIRED, ALL. WELDERS
SHALL HAVE THEIR CERTIFICATION FURNISHED TO THE 1t.::>IING AGENCY.
B. A COPY OF CI:.K IIFlED WELDING PROCEDURES NOT PRE -QUALIFIED BY AWS. SHALL BE
SU8MuI eu FOR REVIEW.
FIELD WELDING WILL BE ALLOWED ONLY WHERE NOTED ON THE PLANS.
EXISTING. AND NEW STEEL SURFACES TO BE WELDED. SHALL BE CLEANED OF PAINT. GREASE,
SCALE. OR OTHER FOREIGN MAl t..KIAL
ALL flELD WELDS SHALL BE WIRE BRUSHED AND CLEANED. THEN PRIMED.
NO WELDING WILL BE PERMlIlI:.D TO EXISTING BEAM FlANGES EXCEPT AS INDICATED ON
THE PlANS.
.YlE..~.pING INSPECTION PROGRAM
FOR . THE FIRM DESIGNATED TO. PERFORM .THE SPECIAL INSPECTION ACTMTIES, SEE l'It:.~t~
AND SPECIAL INSPECTIONS"
THE SPECIAL . INSPECTION AGENCY SHALL BE EMPLOYED BY THE OWNER, THE ENGINEER OF
RECORD, OR AN AGENT OF THE OWNER. BUT NOT THE CONTRACTOR OR ANY OTHER
PERSON RESPONSIBLE FOR THE WORK.
.sHOP WEl.DING
THE SPECIAL INSPECTOR SHALL VISIT THE FABRICATION SHOP TO OBSERVE AT-UP PRIOR
TO THE COMMENCEMENT OF ANY WELDING.
AT THIS llME THE SPECIAL. INSPECTOR SHALL:
VERIFY MAl t..tdALS BEING USED FOR THE WORK
VERIFY THE INTENDED WELDING PROCESSES AND PROCEDURES TO BE USED
VERIFY WELDER QUALIFICATIONS AND CERTIFICATIONS
OBSERVE THE BEGINNING OF THE WELDING. PROCESS
AFTER THE. SHOP WELDING IS COMPLETE. THE SPECIAL INSPECTOR. SHALL RETURN TO
VISUALLY INSPECT THE WELDS. .
21. THE TESTING lAB. SHALL PROVIDE A COPY OF SUCH INSPECTION RESULTS TO THE ENGINEER
VERIFYING THAT THE WELDING WAS PROPERLY PERFORMED AND IN ACCORDANCE WITH THE
PLANS.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
FIELD WEt-DING
22. THE SPECIAL INSPECTOR SHALL VISIT THE JOB SITE AT THE BEGINNING OF ANY ON-SITE
WELDfNGWORK. AT THIS TIME THE SPECIAL. INSPECTOR SHALL:
VERIFY MATERIALS. BEING USED FOR THE WORK
VERIFY THE INTENDED WELDING PROCESSES AND PROCEDURES TO BE USED
VERIFY WELDER QUAUFlCATIONS AND CERTIACATIONS
OBSERVE THE BEGINNING OF THE WELDING PROCESS
23. At I t.t( THE FIELD WELDING IS COMPLETE, THE SPECIAL INSPECTOR SHALL RETURN TO
VISUALLY. INSPECT THE WELDS.
24. THE 1t..::>uNG lAB SHALL PROVIDE A COPY OF SUCH INSPECTION RESULTS TO THE ENGINEER
VERIFYING THAT THE WELDING WAS PROPERLY PERFORMED AND IN ACCORDANCE WITH THE
PlANS.
25. ANY RE-WORK REQUIRED SHALL BE AT THE CONTRACTORS EXPENSE.
.c.QATlNQ
26. ALL STRUCTURAL STEEL SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A123
ALL FIELD WELDS . SHALL BE WIRE BRUSHED AND CLEANED, .THEN TREATED WITH "zRC"
GALVANIZING COMPOUND (OR AN APPROVED EQUAL) AND APPUED IN ACCORDANCE WITH
THE MANUFACTURER'S SPECIFICATIONS
. IU
I
I
REF REV
NO. NO.
BY
DATE
REVISIONS
CONCRETE MASONRY BLOCK
GENERAL STRUCTURAL NOTES
.sfECIFlCATlONS
DESIGN, MAIl:.KfAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE FOLLOWING
CODES, AND STANDARDS CONTAINED THEREIN, UNLESS OTHERWISE. MODIFIED ON THE
DRAWINGS OR IN THE SPECIFICATIONS.
2006 INTERNATIONAL BUILDING CODE
ACI 530-05 BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES
ACI 530.1-05 SPECIFICATIONS FOR MASONRY STRUCTURES
CONCREfE BLOCK
ALL HOLLOW CONCRETE BLOCK SHALL BE MEDIUM-WEIGHT UNITS CONFORMING TO THE
REQUIREMENTS OF ASTM C90ANDSHALL HAVE A NOMINAL FACE OF 8" X 16".
LINEAR SHRINKAGE SHALL NOT EXCEED 0.065 PERCENT. . MASONRY ASSEMBLY STRENGTH
SHALL BE 1.500 PSI. STRENGTH OF INDIVIDUAL MASONRY UNITS SHALL. BE 1,900 PSI.
jZROUT
GROUT FOR ALL REINFORCED HOLLOW UNIT MASONRY WALLS SHALL BE COARSE GROUT
WITH A MINIMUM COMPRESSIVE STRENGTH OF. 2.000 PSI AT 28 DAYS. GROUT SHALL BE
PROPORTIONED IN ACCORDANCE WITH IBC TABLE 2103.12. SLUMP. SHALL BE 10".
COARSE AGGREGATE (PEA. GRAVEL) SHALL BE 3/8" MAXIMUM IN SIZE AND SHALL CONFORM
TO ASTM C404.
WHERE.VER POSSIBLE, GROUT SHAlL. BE BATCH ED, MIXED, AND DELIVERED IN ACCORDANCE
WITH THE REQUIREMENTS FOR READY MIXED CONCRETE. ASTM. C94, "STANDARD
SPECIFICATION FOR READY-MIXED CONCRETE". READY MIXEOGROUT SHALL BE
CONTINUOUSLY AGITATED AFTER MIXING UNTIL PLACEMENT.
MIXING OF GROUT ON THE JOBSITE. WILL NOT BE ALlOWED UNLESS UNUSUAL CONDtTlONS
EXIST THAT WOULD REQUIRE SPECIAL CONSIDERATION. IF SUCH CONDmONS EXIST. THE
CONTRACTOR SHALL CONTACT THE OWNER OR HIS REPRESENTATIVE FOR THE APPROVAL OF
MIXING GROUT AT THE JOBSlTE.
WHEN A BATCH MIXER IS USED ON THE JOBSITE. ALL MATERIALS SHOULD BE THOROUGHLY
MIXED. FOR A MINIMUM OF 5 MINUTES. GROUT NOT PLACED WITHIN ONE AND ONE HALF
HOURS AFTER WATER IS FIRST ADDEO TO THE BATCH SHOULD BE DISCARDED.
MORTAS
ALL MORTAR FOR REINFORCED MASONRY SHALL BE TYPE "s" AND SHALL HAVE A MINIMUM
COMPRESSIVE STRENGTH OF 1 ,800 PSI AT 28 DAYS.
ALL MORTAR SHALL BE MIXED BY MECHANICAL MEANS. SHOVEL MEASUREMENT WILL NOT
BE ALLOWED.
MORTAR PROPORTIONS SHALL BE BASED ON lABORATORY OR FIELD EXPERIENCE. WHEN
THE PROPORTION OF INGREDIENTS IS NOT SPECIFIED.. THE PROPORTIONS BY MORTAR TYPE
SHALL BE USED AS GIVEN IN TABLE NO. 2103.8(1) OF THE INTERNATIONAL BUILDING CODE.
.BmJFORCEMEN"(
ALL REINFORCEMENT FOR MASONRY WALLS SHALL BE GRADE 60 CONFORMING TO
ASTM A615.
UNLESS OTHERWISE NOTED ON THE PlANS, REINFORCE ALL. 8" CMU WAlLS WITH 1-#5
AT 4'-0" MAXIMUM ON . CENTER HORIZONTALLY AND .1-#5 AT EACH CORNER AND AT 2'-0"
MAXIMUM ON CENTER VERTICALLY. ALL VERTICAL .REINFORCING SHALL BE HELD IN THE
CENTER OF THE WALL WITH MECHANICAL BAR POSIllONERS.
UNLESS OTHERWISE NOTED ON THE. PLANS, REINFORCE ALL OPENINGS IN BLOCK WALLS AS
FOLLOWS:
2-#5 IN FULLY GROUTED UNTEL BEAM OVER OPENINGS, BAR LENGTHS TO BE
OPENING WIDTH PLUS 5'-0"
2-#5 IN FULLY GROUTED Vt..KIICAL CELLS AT JAMBS, BAR LENGTHS TO BE FULL
HEIGHT OF THE WALL
2-#5 IN FULLY GROUTED BONO BEAM. BELOW OPENING. BAR LENGTHS TO BE
OPENING WIDTH PLUS 5'-0. ,
SPLICES SHALL BE LAPPED 48 BAR DIAMETERS OR 2'-0" MINIMUM UNLESS DETAILED
OTHERWISE ON THE DRAWINGS.
PROVIDE 2'-6" x 2'-6" CORNER BARS FOR ALL HORIZONTAL. WALL STEEL AT ALL CORNERS
AND INTERSECTIONS. CORNER BARS TO BE THE SAME DIAMETER. AS HORIZONTAL
REINFORCING.
CONSTRUCTION - AS FOLLOWS:
A. LAY IN RUNNING BOND. JOINTS SHALL BE 3/8".
B. PLACE ALL UNITS IN MORTAR WITH FULL MORTAR BEDDING.. (WEBS AND FACE SHELLS)
C. TOOL ALL JOINTS CONCAVE.
D. ALL BLOCK WALLS. SHALL HAVE HORIZONTAL AND Vt.KI tCAL REINFORCEMENT AS SHOWN
ON THE DRAWINGS OR AS NOTED ABOVE.
E. FLUSH END BLOCKS SHAlL BE USED AT EXPOSED CORNERS AND JAMBS.
F. NO FROZEN MATERIAL NOR MAIt.t<IAL CONTAINING ICE SHALL BE USED. WHERE THE
MEAN DAILY TEMPERATURE FALLS BELOW 40 DEGREES FAHRENHEIT. WATER, MORTAR
AND MASONRY SHALL BE MAINTAINED AT A TEMPERATURE NOT LESS THAN 40 DEGREES
FAHRENHEIT DURING LAYING AND UNITS SHALL BE PROTE\;It:.u FROM FREEZING FOR 48
HOURS AFTER LAYING.
G. CONTROL JOINTS SHAlL BE LOCATED IN ALL WALLS AT A SPACING NOT TO EXCEED
TWO TIMES THE HEIGHT OF THE WALL, OR AS SHOWN ON THE DRAWINGS. HORIZONTAL
REINFORCING SHALL BE CONTINUOUS THROUGH VERTt<'AL CONTROL JOINTS. THE MORTAR
AT CONTROL JOINTS CAN EITHER BE LEFT OUT ENTIRELY. OR DEEPLY RAKED BACK SUCH
THAT THE JOINT IS ABOUT 3/8 IN WIDE AND 3/4 INCH DEEP. THE CONTROL JOINTS
SHALL BE FILLED WITH A FlEXIBLE CAULKING COMPOUND.
COATING
17. PRIMER: CEMENTlTIOUS OR 100 PERCENT UNDILUTED ACRYLIC LATEX BLOCK FILLER AS
APPROVED OR RECOMMENDED BY THE COATING MANUFACTURER. .
GENERAL
1. NO DEVIATIONS FROM THESE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT WRlIlt:.N
CONSENT OF THE ENGINEER. IF DEVIATIONS FROM THE PLANS ARE MADE WITHOUT
NOTIFICATION TO AND APPROVAL FROM THE ENGINEER. THE GENERAL CONTRACTOR SHALL
RELEASE C.C. PETERSON ENGINEERING FROM ANY AND ALL ClAIMS THAT ARE IN ANY WAY
RELATED TO.. THIS PROJECT. THE GENERAL CONTRACTOR SHALL FURTHER AGREE TO
DEFEND, HOLD HARMLESS, AND INDEMNIFY C.C. PETERSON ENGINEERING FROM ANY AND
ALL ClAIMS BY ANY THIRD PERSONS THAT ARE IN ANY WAY RELATED TO THE PROJECT.
2. GENERAL CONTRACTOR SHALL VERIFY AND CONFIRM ALL DIMENSIONS AND CONDmONS
SHOWN OR IMPUED ON THE. DRAWINGS WITH THE MECHANICAL AND ELECTRICAL DRAWINGS
AND WITH THE ACTUAL PHYSICAL CONDITIONS AT THE SITE. THE CONTRACTOR SHALL
REPORT ALL DISCREPANCIES TO THE. ENGINEER FOR A RESOLUTION. THE GENERAL
CONTRACTOR SHALL NOT CONTINUE ANY. WORK RELATING TO SUCH DISCREPANCIES WITHOUT
APPROVAL OF THE ENGINEER.
3. CONTRACTOR SHALL MAKE EVERY REASONABLE EFFORT TO LOCATE ALL EXISTING UTIUTlES
AND. EXERCISE CARE TO PROTECT THEM FROM. DAMAGE DURING EXCAVATION AND
CONSTRUCTION.
SPECIFICATIONS
4. WHERE REFERENCE IS MADE TO ASTM, A1SC, ACI, OR OTHER STANDARDS AND
SPECIFICATIONS, THE LAIt..::>f REVISION OR ADOPTION IS INTENDED. UNLESS SPECIFICALLY
DESIGNATED OTHERWISE.
DESIGN, LOADS
5. WIND PER 2007 OSSC.. 80 MPH (FASTEST MILE 'WIND SPEEO)~ EXPOSURE "B"
SEISMIC PER 2006 IBC, ::>11 t:.ClASS "0"
SNOW, 25 PSF
.P9NSTRUCTlON LOADS
6. STRUCTURES HAVE BEEN DESIGNED FOR OPERATIONAL LOADS ON COMPLt.It:.lJ STRUCTURES.
DURING CONSTRUCTION, STRUCTURES SHALL BE PROTECTED BY BRACING AND BAlANCING
WHEREVER . EXCESSIVE CONSTRUCTION LOADS MAY OCCUR.
ERECTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING NEEDED FOR STABIUTY
7. UNTIL STRUCTURE IS COMPLETE.
..s.o.n.s
8. ALLOWABLE SOIL BEARING PRESSURE 1.500 PSF
9. FOOTINGS. ARE TO BE FOUNDED ON A MINIMUM OF 8 INCHES OF COMPA~ I t.u, WELL GRADED
CRUSHED ROCK.
11. BACKFILL ALL PIPE TRENCH EXCAVATIONS BELOW FOOTINGS WITH LEAN CONCRETE TO THE
BorrOM OF FOOTING.
12. ALL FILLS SHALL BE COMPA(;It..lJ BY MECHANICAL MEANS TO A MINIMUM OF 95 PERCENT
OF THE MAXIMUM DRY DENSl1Y AS DETERMINED IN ACCORDANCE WITH ASTM TEST METHOD
0-698. FILL MATERIALS SHOULD BE PLACED IN LAYERS THAT. WHEN
COMPACTED. DO NOT EXCEED ABOUT 8 INCHES.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
TESTS AND SPECIAL INSPECTIONS
14.
1.0 PROVIDE TESTS AND INSPECTIONS FOR ALL ITEMS AS REQUIRED BY. THE 2006. 1f\l1 t..KNATlONAL
BUiLDING CODE AND ALL APPUCABLE LOCAL CODES AND ORDINANCES.
2.0 THE. SPECIAL INSPECTION AGENCY SHALL BE EMPLOYED BY THE OWNER, THE ENGINEER OF
RECORD, OR. AN AGENT OF THE OWNER, BUT NOT THE CONTRACTOR OR ANY OTHER.
PERSON RESPONSIBLE FOR THE WORK.
3.0 THE FIRM DESIGNATED TO PERFORM THE SPECIAL INSPECTION ACTIVITIES FOR THIS PROJECT
SHALL BE. Dt.1 t.t<MINED BY THE OWNER PRIOR TO THE START OF THE PROJECT. THE OWNER
SHALL INFORM THE . BUILDING OFFICIAl AND THE ENGINEER OF RECORD WHO THE SPECIAL
INSPECTION AGENCY IS TO BE.
4.0 THE CONTRACTOR SHALL PROVIDE THE TESTING AGENCY WITH THEIR CONSTRUCTION
SCHEDULES TO ENSURE PROPER COORDINATION OF THE WORK.
5.0 THE FOLLOWING SPECIFIC ITEMS SHALL BE INSPE\.,leU AND/OR TESTED BY THE TESTING
AGENCY. IN ACCORDANCE WITH IBC CHAPTER 17.
6.0 .QQNCRE'(t
6.1 PLACEMENT OF REINFORCING STEEL IN CONCRETE. THE I t..~ I fNG AGENCY SHALL
BE NOTIFIED LONG .ENOUGH IN ADVANCE OF THE SCHEDULED CONCRETE POUR
SO THAT ANY REQUIRED CORRECTIONS CAN BE MADE.
6.1.1 THE ENGINEER OF RECORD SHALL ALSO BE NOTIFIED IN CASE HE ALSO WISHES
TO OBSERVE THE PLACEMENT OF THE REINFORCING STEEL PRIOR TO THE POUR.
6.2 PLACEMENT OF CONCRETE
6.3 CONCRETE COMPRESSIVE STRENGTH. SLUMP AND AIR TESTS SHALL BE TAKEN IN
ACCORDANCE WITH IBC CHAl-'Il:.K 19.
6.4 REINFORCING BARS, THREADED RODS OR BOLTS EPOXY-GROUTED INTO EXISTING
CONCRETE OR MASONRY.
15.
16.
7.0 STRUCTURAL ~ I ttl
APPLY. IN. ACCORDANCE WITH THE MANUFACTURER'S WRITTEN. INSTRUCTIONS.
BACK-ROLL IF SPRAYED
APPLY TO PROVIDE A PINHOLE FREE SURF8Cg..
COATING: POLYMERIZED ACRYUC ElASTOMERIC. COATING WITH FlONGATION (AS A
PERCENTAGE OF THICKNESS) 290%. - 330% AND A WATER VAPOR TRANSMISSION
OF 0.04 PERM INCHES
APPLY TWO COATS - MINIMUM 8-10 MILS DRY FILM THICKNESS PER COAT
OR IN MILLAGE RECOMMENDED . BY COATING MANUFACTURER.
APPLY BY METHOD RECOMMENDED BY COATING MANUFACTURER TO ACHIEVE
SPECIFIED DRY FILM THICKNESS.
APPLY TO PROVIDE A PINHOLE FREE SURFACE
MIX FIRST COAT TO BE A LIGHTER SHADE THAN THE APPROVED COLOR.
7.1 WELDING
7.1.1 ALL STRUCTURAL WELDING.
7.1.2 ALL COMPLETE PENETRAIION WELDS SHALL BE NON-Dt::>I KUCTlVELY 1t.::>It:.D BY
ULTRASONIC OR RADIOGRAPHIC METHODS UNLESS NOTED OTHERWISE ON THE
CONTRACT DRAWINGS.
7.1.3 SEE GENERAL ::>1 t.t..L NOTES FOR "WELDING INSPECTION PROGRAM.
7~2 ALL HIGH STRENGTH . BOLTED CONNECTIONS
8.0 MASONRY .
8.1 ALL MASONRY SHALL HAVE SPECIAL INSPECTIONS AS OUTLINED IN IBC TABLE 1704.5.1
FOR "LE.VEL 1 SPECIAL INSPECTIONS"
9.0 REPORTS
9.1 . COPIES OF ALL INSPECTION REPORTS SHALL BE PROMPTLY SUBMITTED TO THE LOCAL
BUILDING OFFICIAL, THE ENGINEER OF RECORD, THE OWNER AND THE CONTRACTOR.
9.2 MAINTAIN ONE COpy OF EACH FIELD REPORT. AT THE JOB SITE.
9.3 SUBMIT A FINAL REPORT AT THE COMPLETION OF EACH CATEGORY OF WORK THAT IS
INSPECTED.
~UC?V'J?
-t . of
~. ~",~"t-U PROFrS~ ~
~~.
Q2; ( rf/9623- \ f"'
B
I A
~... ..".~,... ",'.,., ...,..,.~ ~,.... ....
I REV
NO.
PETE 12/5/08 ISSUED FOR BIDDING .PURPOSES ONLY
PETE ~l! ?/~~ ISSUED FO~ INFORMA TIO'J ONLY
BY DATE REVISIONS
C. C.PetersonEngineering
,.. ."". ",.~.. , ". . ,.. '" ...."... ,,~..,. . ..,,, ,,,,,,,,,.,, "" ,,",' ..,.." ".",. "......,,, , .,." "'''''.' ...., , .... ... " ."", ."" ""'" ."" ." ,
Consulting Engineers
2644 N.E. 26th Ave
Portland, Oregon 97212
Phone (503) 287-5532
Fax (503)282-7226
RENEWS 12-31-08
CCP JOB NO.
08-128
STEEL DOORS AND FRAMES
liGHT GAUGE METAL ROOFIN'G
1. METAL ROOFING SHALL BE 11/2" . 24 GAUGE "HEFTI-RIB" BY FABRAL
lliE "HEFn-RIB" PRODUCT CAN BE OBTAINED FROM:
FABRAL METAL WALL AND ROOF SYSTEMS
45.70 RIDGE DRIVE NE
S~LEM, OREGON 97303
C0NTACT PERSON:
GENE LUNDEN
800-477-8028 OFFICE
503-880-6170 CELL
2. Al.L .METAL ROOFING SHALL BE INSTALLED IN ACCORDANCE WllH lHE MANUFAClURER'S
SPECfFlCAll0NS.
3. ThJE ROOFING SUPPUER SHALL PROVIDE ALL GUTTERS, DOWN SPOUTS. TRIM. FlASHINGS
AND CLOSURES REQUIRED TO.. PROVIDE A COMPLETE WEATHER-TIGHT INSTALLATION.
COMPOSITE METAL.!CONCRETE .ROOF
1. MCC BUILDING ROOF CONSTRUCTION. SHALL CONSiSt OF. 1 1/2" - 20 GAUGE VERCO
PLB FORMLOCK METAL DECKING (OR AN APPROVED EQUAL). WITH 4 1/2" CONCRETE
SLAB (TOTAL THICKNESS) REINFORCED WITH 6 X 6 X W2.9 X W2.9 WELDED WIRE FABRIC
LOCATED 1" CLEAR FROM THE TOP OF THE SLAB.. THE WELDED WIRE FABRIC SHALL BE
SUPPLIED IN FlAT SHEETS AND SUPPORTED ON CHAIRS SO IT MAINTAINS IT'S POSITION
DURING THE CONCRETE PLACEMENT.
2. STEEL. ROOF UNITS SHALL BE FASTENED TO lHE STEEL BEAMS AND EMBEDDED PLATES
WIlli 3/4" DIAMETER PUDDLE WELDS'SPACED NOT MORE THAN 12" ON CENTER. THE
SIDE LAPS OF ADJACENT UNITS SHALL. BE PUNCHLOKED AT 36" MAXIMUM.. ON CENTER.
ROOFING OVER CONCRETE DECK
1. ROOFING SHALL BE "SURE-WELD" AFX HOT MOPPED MEMBRANE ROOF.
2. AN ACCEPTABLE SUPPUER:
BOB . CARLSON INC.
PO BOX. 63
HILLSBORO. OR 97123
CONTACT PERSON:
TONY FREAS
503-640-3623 OFFICE
503-849-1703. CELL
3. lliE ROOFING SUPPUER SHALL PROVIDE ALL GU I I t..KS, DOWN SPOUTS,. TRIM. FLASHINGS
AND CLOSURES REQUIRED TO PROVIDE, A COMPLETE WEATHER-TIGHT INSTALLATION.
FOR BIDDING
PURPOSES ONLY
DECEMBER 05, 2008
Weyeilaeuser
.'
RIVER VI ATER INTAKE PROJECT
W"J~D.aeuser ; MCC BUILDING) CANOPIES 8c FOUNDATIONS
Container board Manufacturing. Springfield. Oregon . STRUCTURAL SPECIFICATIONS
fI5RAWN" 'SY:PETE ..,
CHECKED BY:
APPROVED BY:
SCALE: AS NOTED
08-12-08
~
. ",""". .
FILE: KGS-265- D-A
DRAWING NO.
DATE
SHEET
OF
REV
2/ of 21 pa~6