Loading...
HomeMy WebLinkAboutApplication APPLICANT 2/14/2008 . Date ReceiveP City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 FEB 1 4 2008 Tree Felling Permit Original Submittal Required Project Information (Applicant: complete this section) A Iicant Name: Eu ene Water & Electric Board Com an : Phone: 541-341-1844 Fax: 541-484-3762 Address: 500 E. 4th Ave, Eu ene, OR 97401 A Iicant's Re h Phone: 541-341-1844 Com an : Address: Eu ene Water & Electric Board Fax: 541-484-3762 500 E. 4th Ave, Eu ene, OR 97401 Owner: Eu ene Water & Electric Board Phone: 541-341-1844 Com an Fax: 541-484-3762 Address: 500 E. 4th Ave, Eu ene OR 97401 17-0Z-( -00 ASSESSOR'S MAP NO: 1702-1900 TAX LOT NO S 3300 Disturbed area"" 16,500.=.O.31?a.u#' Acres 0 S uare Feet ~ Description of Pro osal: If you are filling in this form by hand, please attach your proposal description to this application. See narrative and lot lans. Associated Cases: '. au 1-,- OG-C::i Si ,1~ +0 W Case No.: c IS- Date: 1- Reviewed b : A lication Fee: Technical Fee: $ Posta e Fee: $ TOTAL FEES: $ PROJECT NUMBER: prz. I ~~ / J/b<;(PJ 'iM ~ d?-w;('- fJ. ~ {V\c...;. '" 0 l~C-. Revised 1/1/08 Molly Markarian 1 of 7 . . Signatures The undersigned acknowledges that the-information in this application is correct and accurate. Applicant: Wpk?~ ~ sign~ Wally McCullough - Senior Eng. Water Div. Print Date: L~/ - If the applicant is not the owner, the owner hereby grants permission for the applicant to act,in his/her behalf. Owner: Date: Signature Print Date Received: FEB 1 4 2008 Original Submittal Revised 1/1/08 Molly Markarian 2 of 7 . . Tree Felling Permit Submittal Requirements Checklist NOTE: If you feel an item does not apply, please state the reason why and attach the explanation to this form. o . Submitted Concurrently with Site Plan Review or Land Division applications, where applicable. A site plan minor modification review has been completed for the proposed project. See case number DRC2007-00074. In the application for this minor modification it was stated that a tree felling permit would be applied for if required based on final site surveying. This application is being based on the findings of that survey. Application Fee - refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development Services Department. The applicable application, technology, and postqqe.lees ared, collected at the time of complete application submittal. uate KeCelVe . o ~ o o ~ Tree Felling Permit Application Form FEB 1 4 2008 Copy of the Deed 0" II ~lJbm' b This was provided with the minor modification application I1Rl'l~s7Ivni)}Y1 Jtu' herein. Copy of a Preliminary Title Report issued within the past 30 days documenting ownership and listing all encumbrances. This was addressed with the minor modification application and is not included herein. Narrative explaining the proposal and any additional information that may have a bearing in determining the action to be taken, including findings demonstrating compliance with the Tree Felling Permit Criteria as specified in SDC 5.19-125 (see page 4 of this application). NOTE: Before the Director can issue a Tree Felling Permit, information submitted by the applicant must adequately support the request. All of the Tree Felling Permit Criteria must be addressed by the applicant. Incomplete applications, as well as insufficient or unclear data, will delay the application review process and may result in denial. In certain circumstances, it is advisable to hire a professional planner or land use attorney to prepare the required findings. The Director or the Public Works Director may require the applicant to provide the services of a professional forester (approved by the City), licensed hydrologist, or licensed landscape architect in order to address the standards in SDC 5.19-125 for undeveloped property greater than 10 acres in size or 15% slope or above an elevation of 670 feet. The Eugene Water & Electric Board is undertaking an expansion of their Water Filtration Plant. See Minor Modification Case Number DRC2007-00074. As part of this expansion filter backwash system will be improved and filter to waste recycle system will be constructed. These improvements require the construction of two pipelines and an equalization tank. These are shown on the attached Drawings C2, C4, and C19. . The locations of the pipelines and tank require the removal of numerous trees which are shown on attached Drawing C4. Alternative alignments and locations were evaluated to minimize this removal, however, due to conflicts with the future Revised 1/1/08 Molly Markarian 40f7 .. . construction of a significant backwash handling facility the proposed location was selected, The proposed pipelines and tank were located to place them near existing constructed facilities, The tank is adjacent to an existing backwash pond and the pipelines are near a recently constructed reservoir overflow channel. The trees to be removed will be replaced with new trees planted in the vicinity of those removed. These are shown on attached Drawing C22. . The trees to be removed are tabulated below followed by a summary of the trees to be planted, Trees to be Removed Tree # Survev PI Tvne Size fin) 1 55610 Deciduous 8 2 55499 Deciduous 14 3 55705 Coniferous 30 4 55701 Deciduous 14 ~ 5 55703 Ceniferous 14 " .s " 6 55704 Ctmiferous 6 0- 7 55702 Coniferous 30 0:; i3 8 55510 Deciduous 10 ~ 9 55511 Deciduous 10 10 55509 Deciduous 8 "' 11 55691 Deciduous 6 00 " 12 55690 Deciduous 20 0 :;: 13 55686 Coniferous 18 '0 14 55685 Ccmiferous " 14 ;> 0 15 55684 Coniferous 8 S " 16 55683 Coniferous 7 ~ 17 55682 Coniferous 18 18 55681 Coniferous 12 19 51830 Deciduous 8 20 51831 Deciduous 8 21 51694 Deciduous 6 ~ " 22 51597 Deciduous 12 '" 0 "'0 .C " "'"lj 23 . 51687 Coniferous 12 6] ~ 24 51549 Coniferous 12 S '" I- ~$ 25 51550 Deciduous 18 26 51551 Deciduous 12 Trees to be Planted I "0 Q) ~ > '~ ~ - .l!! Q) - 0::: - 'E Total Q) fB .a - ::J 1tI I.L (/) 0 'iii c '6> 'C: 0 Revised 9/26/07 Molly Markarian 5 of 7 It . [gJ Three (3) Copies of a Plot Plan drawn to scale to include: Construction Drawings Gl, G2, C2, C4, C19, and C22 are included with this application to illustrate the proposed improvements and the tree removal/replacement. [gJ The species or common name of the trees The trees to be removed are listed in the narrative above. The trees to be planted are shown on attached Drawing C22. [gJ The location of trees to be removed and their sizes The location of the trees to be removed is shown on attached Drawing C4. The size of each is listed in the narrative above. [gJ The method of tree removal and the hauling route to be used Trees will be removed as part of the specified clearing and grubbing process for the propose pipelines and tank. The hauling wili be incidental to the construction traffic and is anticipated to be through a dedicated contractor entrance road on the site, to Hayden Bridge Road, to Marcola Road. [gJ A description of any plan (Vegetation and Re-vegetation Report) to replace, landscape, or otherwise reduce the effect of the felling that addresses the applicable criteria in SDC 5.19-125. See attached Drawing C22. In addition, seeding of all disturbed areas is specified as part of the construction project. o Copy of the Plot Plan Reduced to 8112" X 11", which will be mailed as part of the required neighboring property notification packet. A reduced size plot plan will be provided after discussing the appropriate format with City staff. Date Received: FEB 1 4 2008 Original Submittal Revised 9/26/07 Molly Markarian 6 of 7