TYPE II TENTATIVE LAND DIVISION,
PRE-SUBMITTAL CHECKLIST
Project Name: Dukes & Dukes Partition
Project Proposal: 2 Lot Residential Partition
Case Number: PRE2010-00008
Project Address: 740 28th Street
Assessors Map and Tax Lot Number(s): Map 17-03-36-11, TL 11300
Zoning: Low Density Residential (LOR)
Overlay District(s): Drinking Water Protection (DWP)
Applicable Refinement Plan:
Refinement Plan Designation:
Metro Plan Designation: Low Density Residential (LOR)
Pre-Submittal Meeting Date: June 8, 2010
Applic::ation Submittal Deadline: December 5, 2010
Associated Applications: DRC2005-00072; ZON2010-00002
ex ...!ol!':.selU'f1IGt::X':~D~PEXll:Ir!ORMENOO.:Rl:XlXE;W"OOE;AM!:0'.::j'
POSITION REVIEW OF NAME
Pro"ect Planner Land Use Plannin And Limbird
Trans ortation Plannin En ineer Trans ortation Jesse Jones
Public Works Civil En ineer Utilities Eric Walter
Public Works Civil En ineer Sanita & Storm Sewer Eric Walter
De ut Fire Marshal Fire and Life Safet Gilbert Gordon
Communit Services Mana er Buildin Dave Puent
>;i,:!;,:ji:::1jpm~J;~fu[tjlY!Drf:~*~j
PHONE
726-3784
726-3720
736-1034
736-1034
726-2293
726-3668
:ARP'UCAI'\lT~$i'QEXlE"O'RMEl'\lif:REXllEW..OOEAM: ;<'Y+'.;;,::';;;;:':'" " ,...".........,..;;"q....d.. .. nJ;y~~j'~~~r;~5~zi~;r7+r L~~::;i:!;f:;(;:'
;~0:(.n.."7; ,<jL:r~ . . /:;;:;"H;;:S"
"'.:0.jL
Owner Applicant
David & Laurie Dukes Aaron Grimes, Sr.
Dukes & Dukes Construction Olson & Morris Engineering
2955 Yolanda Avenue 380 Q Street
Sprinqfield OR 97477 Sprinqfield, OR 97477
Revised 9/24/07
Date Received:
Planner: AL
60/ ,kilO
!
/
. .
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
PLANNING
o Application Fee discuss the applicable fees
~
Incomplete See Planning
Note(s)
o One additional copy of the Land Division Plan reduced to 8'!2"x 11"
Complete
ll"0l
tb9
8 'I," x 11" Copy of Land Division Plan
o Copy of the deed and a preliminary title report issued within the past 60 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property. owner is required.
Complete
Incomplete
See Planning
Note(s)
1
l::3
~.
o Tentative Land Division Plan
Complete Incomplete See Planning
Note(s)
~
~
F3'I
IZ:SJ
*Comment
Bl
E8J
*Comment
~
I?'I
E;t
~
Bl
~
2
6/7/10
Deed and Preliminary Title Report
Prepared by an Oregon Licensed Land
Surveyor in accordance with ORS 92
All existing and proposed easements
Dimensions and size of each parcel and the
approximate dimensions of each building site
indicating the top and toe of cut and fill
slopes to scale
Location, widths and names of all existing
and proposed streets, alleys, dedications or
other right-of-ways within or adjacent to the
proposed land division
Location of existing and required traffic
control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units
and similar public facilities
Location and width of all existing and
proposed sidewalks, sidewalk ramps,
pedestrian access ways and bike trails
Location, size and type of plantings and
street trees in any required planter strip
Date Received:
Planner: At
h~/,?olb
/
2
.
.
1M
~
frl
~
Location and size of existing and proposed
utilities on and adjacent to the site including
sanitary sewer mains, stormwater
management systems, water mains, power,
gas, telephone, and cable TV. Indicate the
proposed connection points.
o Phased Development Plan required if redivision is proposed. The plan must include
the boundaries and sequencing of each proposed redivision. Any redivision must
progress in a sequence promoting street connectivity between the various phases of the
development and accommodating other required public improvements.
Complete
~
Incomplete See Planning
Note(s)
b]
Phased Development Plan
Planning Notes:
1. Please provide a copy of the deed and a current title report with the tentative
partition submittal (no copy of deed submitted and title report is about 6 months old).
2. Show or describe the location of required street tree plantings on the tentative
partition plan.
Additional comments not related to the completeness of the application:
. Please provide copies of easement documents #81214 (1959) and 85-42219.
. A 7-foot wide public utility easement may be required along the 28th Street frontage of
the site.
. Site is within the 5-10 year Time of Travel Zone for the Maia drinking water wellhead.
. All requirements of the Site Plan approval (Case DRC2005-00072) remain in effect,
including but not limited to: provision of adequate off-street parking, site landscaping,
and installation of a wood perimeter screening fence.
6/7/10
Date Received:4~
Planner: AL
3
. .
LAND DIVISION TENTATIVE PLAN APPLICATION
PRE-SUBMITTAL CHECKLIST
Engineer: Eric Walter
Case#: PRE20l0-00008
PUBLIC WORKS ENGINEERING
Complete
o Site Assessment of Existing Conditions
I2J
I2J
I2J
I2J
I2J
I2J
I2J
I2J
Revised 10/25/07
Incomplete See PW
Note(s)
~
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing site
features including buildings, curb cuts, trees, and
impervious surface areas, clearly indicating what is
remaining and what is being removed. For existing
structures to remain, also indicate present use and
required setbacks from proposed property lines
The name, location, dimensions, direction of flow and
top of bank of all watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
The lOO-year floodplain and f100dway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map Revision
The Time of Travel Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Development Services Department
Physical features including, but not limited to trees 5'"
in diameter or greater when measured 4 V2 feet above
the ground, significant clusters of trees and shrubs,
riparian areas, wetlands and rock outcropping!;
Soil types and water table information as mapped and
specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must be
submitted concurrently if the Soils Survey indicates
the proposed development area has unstable soils
and/or a high water table
~
~
t.zS
~
lliW
ro
~
~..
:."*':..
_.. .
Date Aeceived:
Planner: AL
(,/!/#16
I /
.
.
o Land Division Tentative Plan
Complete Incomplete See PW
Note(s)
l:8l
f';::0;f
If:l
~"
,'by
,"~;.
Prepared by an Oregon licensed Land Surveyor in
accordance with ORS 92
1, 2, 3 Location and width of all existing and proposed
easements on and abutting the property
Boundaries of the entire area owned by the property
owner, of which the proposed land division is a part,
as well as dimensions and size of each parcel and the
approximate dimensions of each building site
indicating the top and toe of cut and fill slopes to
scale
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
public facilities
Location and size of existing and proposed utilities on
, and adjacent to the site including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable 1V.
Indicate the proposed connection points
l:8l
f';::0;f
~
l:8l
l:8l
~
l:8l
fIT!
Utt:ti
o Stormwater Management Plan
Complete Incomplete See PW
Note(s)
l:8l
l:8l
f';::0;f
u
~
IE]
4
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
part of the storm water management system
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size and location of stormwater management
systems components, including but not limited to:
drain lines, catch basins, dry wells and/or detention
ponds; stormwater quality measures; and natural
drainageways to be retained
l:8l
l:8l
r:;;;;]
11!lli:I.
~
l:8l
r,:;;:J
liliill
Existing and proposed spot elevations and contours
lines drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Amount of proposed cut and fill
IE]
~
o Stormwater Management System Study - provide four (4) copies of the study with
the completed Storm water Scoping Sheet attached. The plan, calculations, and
Date RecEi,lved: ~/IJoI"
Planner: AL
Revised 10{25{07
.
.
documentation must be consistent with the Engineering Design Standards and
Procedures Manual.
Complete
Incomplete
See PW
Note(s)
~
l""l
~
Scoping Sheet and attached Stormwater Management
System Study
PW Notes:
1. Plans indicate a proposed 5' wide SUB easement for water and electric utilities. SUB
Water and Electric were contacted and SUB found this width acceptable for
proposed partition.
2. A 7' wide PUE will be required along the street fronting proposed partition. Plans will
need to be revised to include a proposed 7' PUE easement.
3. The original site plan for this development required a water quality bioswale be
constructed at the south/east corner of property; however this water quality
swale did not appear to be constructed. This bioswale will need to be constructed
and inspected per original site plan. Because proposed partion will create
separate lots, this storm water quality bioswale will be required to be located in a
storm water easement. Please revise plans to include this required easement.
4. Verify that 6" storm water pipe (as required by original site plan and located at end
of bioswale from catch basin to 10" pipe), was installed and please include this
pipe on the Storm Water Management Plan sheet 3.
Additional comments not related to the completeness of the application:
.
Revised 10/25/07
Date ~eceived:-4"4 ,..6..0/0
Planner: AL I
. .
LAND DIVISION TENTATIVE PLAN APPLICATION
PRE-SUBMITTAL CHECKLIST
Transportation Engineer/Planner: Jesse Jones Case#: PRE2010-00008
Applicant: Dukes and Dukes Construction
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on a Lane County or an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete See Transportation
Note(s)
r8J
12:'1
~
Copy of ROW Approach Permit Application
o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 AA. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, Metro Plan and state land use and transportation policies and
objectives.
Complete Incomplete See Transportation
Note(s)
r8J
12:'1
~
Traffic Impact Study
o Land Division Tentative Plan
Complete Incomplete See Transportation
Note(s)
~
!'iGl.'
~
Location of existing and proposed street
lighting, including type, height, and area
of illumination
Location of existing and proposed transit
fad Iities
Location and dimensions of existing and
proposed driveways
Location and width of all existing and
proposed sidewalks, sidewalk ramps,
pedestrian access ways, and bike trails
Location, widths, conditions, and names of
all existing and proposed streets, alleys,
dedications, access easements or other
right-of-ways within or adjacent to the
proposed land division. Proposed streets
should also include approximate radius of
curves and grades and relationship to any
Date Received:.6/~/;}o(D .
Planner: AL /
I2Sl
~....
~"<:
'~""'.
!'iGl
~
~
I2Sl
~
r8J
~
Revised 10/25/07
.
.
~
ra
~
projected streets as shown on the Metro
Plan, TransPlan, Conceptual Development
Plan, or Conceptual Local Street Map
Location of existing and required traffic
control devices
Transportation Notes:
1.
Additional comments not related to the completeness of the application:
.
Revised 10/25/07
Date Received;~
Planner; AL
bjt/~/O
7
. .
TENTATIVE LAND DIVISION APPLICATION
PRE-SUBMITTAL CHECKLIST
Deputy Fire Marshal: Gilbert Gordon
Case #: PRE2010-00008
FIRE
o Tentative Land Division Plan
Complete Incomplete See Fire
Note(s)
1:'71
~
tiJ
Location, widths and names of all existing and
proposed streets, alleys, dedications or other right-of-
ways within or adjacent to the proposed land division
Location of existing and required fire hydrants
~
1:'71.
1.!!;1
Fire Notes:
1.
Additional comments not related to the completeness of the application:
. Access and water supply are pre-existing.
Revised 9/24/07
Date ~eceived;.. Wt1t7/D
Planner; AL
. .
ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR
PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable Not
Applicable
~ ~
~
[;JJ ~
[;JJ ~
~ [;JJ
~ ~
~ ~
l6iJ ~
~ [;JJ
[;JJ .~
6/7/10
Proposed deed restrictions and a draft of any Homeowner's
Association Agreement
Additional plans and documentation for submittal of a Cluster
Subdivision proposal as specified in SDC 3.2-230
Riparian Area Protection Report For properties located within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
tributaries of WQLW
A Geotechnical Report prepared by an engineer must be
submitted concurrently if there are unstable soils and/or a high
water table present
Where the development area is within an overlay district
applicable, address the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC 5.19-100
A wetland delineation approved by the Oregon Division of State
Lands must be submitted concurrently where there is a wetland
on the property
Any required federal or state permit must be submitted
concurrently or evidence the permit application has been
submitted for review
Where any grading, filling or excavating is proposed with the
development, a Land and Drainage Alteration permit must be
submitted prior to development
Where applicable, any Discretionary Use or Variance as specified
in SDC 5.9-100 and 5.21-100
Date, Received;,*~/'
Planner: AL
4
.
.
THIS APPLICATION IS:
o COMPLETE FOR PROCESSING
I2;;J INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
This s not a decision on your application. Springfield Development Code Section 5.4-
105 and Oregon Revised Statutes 227.178 require the City take final action on a limited land
use decision within 120 days after the application is deemed complete. The 120-day
processing period for this application begins when all the missing information is submitted or
when you request that the City proceed without the information. You must indicate by either
signing this form or by submitting a written response to the City within seven days of the
date of this form asserting your intentions regarding the provision of the missing information.
If you indicate herein or in your written response that the missing information will be
submitted, then you have'180 days from the date the application was submitted for Pre-
Submittal Review to provide the City with the missing information. If you refuse to submit
the missing information, then upon receipt of the full application packet and processing fee,
the City will deem the application complete for purposes of starting the 120-day clock and
begin processing the application. No new information may be submitted after the start of
the 120-day period unless accompanied by a request for an extension of the 120-day
processing time. Upon receipt of a request for extension, the City may extend the 120-day
period for a reasonable period of time. The City may also require additional fees if the new
information is submitted after the Notification to Surrounding Property Owners is sent out
and a second notification is required or if the new information substantially affects the
application proposal and additional review is required.
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the lSO-day timeline.
~,.f ~-
Owner/Applican s Signature
6/7/10
Date Received; ~1,6'b/l>
Planner: AL
5