HomeMy WebLinkAboutNotes, Work PLANNER 6/3/2010
~ .....
. .
LAND DIVISION TENTATIVE PLAN APPLICATION
PRE-SUBMITTAL CHECKLIST
Engineer: Eric Walter
Case#: PRE20l0-00008
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete Incomplete See PW
Note(s)
Iil
R:'I
~
~
~
Iil"
t:"'.'
"ffif
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing site
features including buildings, curb cuts, trees, and
impervious surface areas, clearly indicating what is
remaining and what is being removed. For existing
structures to remain, also indicate present use and
required setbacks from proposed property lines
The name, location, dimensions, direction of flow and
top of bank of all watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
The 100-year floodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map Revision
The Time of Trav"el Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Development Services Department
Physical features including, but not limited to trees 5"
in diameter or greater when measured 4 V2 feet above
the ground, significant clusters of trees and shrubs,
riparian areas, wetlands and rock outcroppings
Soil types and water table information as mapped and
specified in the Soils Survey of Lane County. A
Geotechnical Report prepared byan Engineer must be
submitted concurrently if the Soils Survey indicates
the proposed development area has unstable soils
and/or a high water table
1%1
~
~
1%1
@@
~
1%1
~
~
1%1
tE1t
R:'I
t:&;J
Iil
~
Iil
Revised 10/25/0,.. ,
uais, ({eceived:
Planner: AL
d,~~/o
/ /
.
o Land Division Tentative Plan
Complete Incomplete See PW
Note(s)
IX7,1
kZSJ
!';iiJ
!.2EJ
1'0!1....
liCSI
1, 2, 3
~
r;;m
~
~
I'iiI
l!!E!I
1'0!1.....
12:S.I
r;;m
~
o Stormwater Management Plan
Complete Incomplete See PW
Note(s)
~
IX7,1
liCSI
~
~
~
~
~
!';iiJ
L:ili0J
I'iiI
lJE!ij
IX7,1
I22SI
4
r;::;ct....
lLSI
III
~
~
.
~ ..
Prepared by an Oregon licensed Land Surveyor in
accordance with ORS 92
Location and width of all existing and proposed
easements on and abutting the property
Boundaries of the entire area owned by the property
owner, of which the proposed land division is a part,
as well as dimensions and size of each parcel and the
approximate dimensions of each building site
indicating the top and toe of cut and fill slopes to
scale
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
public facilities
Location and size of existing and proposed utilities on
and adjacent to the site including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV.
Indicate the proposed connection points
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
part of the stormwater management system
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size and location of stormwater management
systems components, including but not limited to:
drain lines, catch basins, dry wells and/or detention
ponds; stormwater quality measures; and natural
drainageways to be retained
Existing and proposed spot elevations and contours
lines drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Amount of proposed cut and fill
o Stormwater Management System Study - provide four (4) copies of the study with
the completed Stormwater Scoping Sheet attached. The plan, calculations, and
-.,
Revised 10/25/07
eel..u (;':'Cl;)ivea:_,lj.l%
Planner: AL /
.'
.'"
documentation must! consistent with the Engineering tSign Standards and
Procedures Manual.
Complete Incomplete See PW
Note(s)
~ ~ Scoping Sheet and attached Stormwater Management
System Study
PW Notes:
1. Plans indicate a proposed 5' wide SUB easement for water and electric utilities. SUB
Water and Electric were contacted and SUB found this width acceptable for
proposed partition.
2. A 7' wide PUE will be required along the street fronting proposed partition. Plans will
need to be revised to .include a proposed 7' PUE easement.
3. The original site plan for this deveiopment required a water quality bioswale be
constructed at the south/east corner of property; however this water quality
swale did not appear to be constructed. Thisbioswale will need to be constructed
and inspected per original site plan. Because proposed partion will create
separate lots, this storm water quality bioswale will be required to be located in a
storm water easement. Please revise plans to include this required easement. .
4. Verify that 6" storm water pipe (as required by original site plan and located at end
of bioswale from catch basin to 10" pipe), was installed and please include this
pipe on the Storm Water Management Plan sheet 3.
Additional comments not related to the completeness of the application:
.
Revised 10(25/07
. ....C' '::'-~cjveu:-1p.~
Planl1er: AL