Loading...
HomeMy WebLinkAboutMiscellaneous Plans 2006-12-30 . ( , ('-...v/ ": ~) .~ G(J(Vl2tJJ6~37f .1" ' 331 ~ rn~ fir- ~ ( .' , PLAN #52196V FOR Suntel Home Design In return for payment of a one-time fee, [g'~ Designs & Engineering, Inc. grants you a limited license to use the Analysis to construct one-single house at the address shown , below. This lateral analysis is not to be usedfor any master-plan approval process. . Site Location: 3313 FaloB Drive, Sprinfield, Oregon Copyright # 7806 (please refer to this number when requesting customer support) , ' ",I'~ . NOTICE: If the Building Department accepts the Analysis without an engineer's original ',',wet-stamp" seal signed with red ink or lor different site location than shown above, then it is agreed that such Building Department accepts total liability out of or in connection. with this Analysis. CALCULATIONS VALID WITH ORIGINAL STAMP ~."~i"'lIII\.I' . 27 ~8: ~(l) D. ~ UZ'. I EXPlRAl1ONomt(l~1b :!Ji~ DESIGNS & ENGINEERING, INe. AND CAN NOT BE USED AFTER AUGUST 2005 Phone: (503) 533-5100 Fax: (503) 533-5885 1665 . i . . '-- .- l i!J'~ ProjCCt: Paxton..V By: RIO ~7eet No. " ?~..~~~~~~..~_~_~~~~~~~..I~~...~~~~~_......_..__......~~I~~~~~:~~~_~~:I~~~~~~~;..~i~~............__....~~~~~~I~~f........___............i I ~ I LATERAL ANAL YSIS ANALYZE BUILDING FOR ONLY WIND & SEISMIC FORCES according to the 2004 OREGON STUCTURAL SPECIALTY CODE WIND ANALYSIS FOR EXl'OSLlRE "13" 100 MPH (3-sec Gust) SEISMIC ANALYSIS FOR ZONE 01 LIABILITY LIMITATIONS /!li,lle?/ Designs & Engineering. ("FDE") was retained in a limited capacity for this project. Design is based upon information provided by the Client, who is solely responsible for accuracy of same. No responsibility and liability is asslillled to FDE for items beyond that shown on these sheets. No construction observations nor soils investigations perfonned by FDE. INDEMNIFICATIONS BY BUILDING DEPARTMENT Building Depa11ment agrees to defend, indemnify and hold hann\ess FDE from any loss, costs, damage, expense, including attorney fees upon trial or appeal, for liability arising out of or in connection with FDE's Analysis unless Analvsis is used for soecific site location shown on cover oal!e and contains an. oritrinal enl!ineer's "wet..stamo" seal shmed with red-ink (no ohotocoov allowed\. OWNERSHIP OF DOCUMENTS All documents produced by FDE shall remain the property ofFDE and shall not be used unless accompanied by ar original engineer's wet-stamp issued from FDE. I . I ! , ',-"" I .". .I'llC'. ttJ':'I~UV-JUVJ.)-UI-V.K Ui.ll~: l/~UVJ ..~/ I D.:signs & Enginc.:ring, Inc. Client: Suntd Hom.: Design Job No. 1601 ........................ I , 8 -------~--_._-_.._------------------------------------------------------------------------------------------- ./ ~ .. ,/,~~~'fl7fl:~r .",'lrfi'1Ti1-~~ 1IIIn ~ C,.,.., "J ~ -.- :.....: . ,'. .e==' '[I,";;;........ ~: I:":r;- """~ M"'c.;' . L;Irr'r';~':a"""~, ....~. ...>V,~. ~ ;-"'T-:'. ~"" ''1 -~,~ V.'f1fl~1K' '. . \ _. ~. . '..' .",~, ._._.~.- r, , I III -,-t?!r-r" T,{ ,. f '. ., ." ... ; .. ... ..., I !J1", I ~ ~ , ~. I -~- . --- j -10- ,lOll!' ....,- '1 ! ~ ..t ,.1Il11~llf!r;~m1 ~I: . . : "---!'h. I il" I . I ,[I i) I III III! I, i, : : , i i = ~i!ll!gill :wI!11 Ii! ~,~ ri1t,W 11""11 II I I ~.: - ~~~.:f="'" ~f,1 .-J~illl'li.;I:IT: I!~dl:#'!il['iil:r!.iilnftjl'l :.d, '. ,;~. :,!:__ ) .. . !!ii'1 II 11m '"m'." I 'I' ". .. .. <, -"""""" ........ I :;, :~j ; I I ':. II; . 'll~~:.~U~J 1, ~~ __..J . . - - -u.- _ ~')(.\~ ~ ~ 0::3"'-'l'J \"'"0 '::;;\\2-0@~~~ \ e>{2 ~t-\.~wAlfS. } " ~-"-",. -I""" ., ' /' ~ W~ " .....O.IA - FQC)rlT eLev A TIC)n SCALE: 1/4" = r-o' ffijJ ~ [U1] [0 r ------rr-:. .' .~.:\ I ~ UPFE~~~ , " MAIN Fb...OP,B LINE J o EIfEl] . .' ~I eLeV A TIOn r . LeFT SCALE: 1/S' = r-o' ~ / .. ,\.j . " eT~e' . " l- ''''I,i.:;l,;ll'''IU. -...vJ"'....... JU,I'I.\VlI-" 1..,))". ~'\. .... file: #52l96Y..100B-DI-OR Date: 1/2005 31 'D.:signs & Engineering. In.:. Cli~nt: Suntd Home Design Job NO:..J..~9..!................__......I'8 ~ -------~.--~.._------------------------------------------------------------------------------------ UFFER ~L09R r LINE , lZJ [I] /, II ,/ " ~. ~ A3 .- MAlt!..~L09& I LINE I t" I ... 'I 11-' t1 ff Q ji ~'i J It 'J I, .. fT.(1 Ul :DrT-1 '[I I ~ \ =,J QcAQ cL ev A Tlc>n SCALE: 1/8' = r-o' ~:n=,. ~?;iliWillJ [3T ;~r" ,,: Ell IlCJ . I A3 -. lat _A=' ~ "7 l~l I ,v . '.~.:... 1 I , '='~ I ~FER FLOOR I .::::::;: 'TINE'- , , .18 . J'1AIN. El..9.9R r", LINE QIGHT cLcV A TIOn SCALE: 1/8' = r-o' . /... ....,j , . . ' -- _....:'~..... ..-:'.0...-----.." '-U....IIL. .JUIU...III\lIlI... 1........"0.. .....u .,..... ......... . I _________M_.________._____~------.--------------------___________________.______________________._____________________J_, '~I ~ C? i i 'I ( ~~i . ~ f~~. f'-r-~-TI I _.~.~: -.........-.... '==f""""'-"ii -, t --- ..---- -t--_. I _, ._'_ _'_'_' _"_'_'_'_ - .-,-,-.. 1 1 -l---.------- - M.b.11 1 I.... =:d ,Vi' 1 i !---F;;?\-. ,---- -t-=~ <0 l;.i==r~=,:=:= _~ .~t~==11 :: 1 I 1 0 .' --- ~'-r-. --_=_~~ j--, I j. i i fi _. .' _'_'_'_ . ,_,_._._._' ,I ' . ,I _.~...:~..-=--:~ ',-::-'_'.____'_' I. 11..l..J...l .._'_ - -1- - 7/'''- - - - -I' tl' - ~ i Iii i _ .______ :..:..=..._ ' __ , 1 1":==61 I I -'~'i~ -=-= =:~- ",-.itJ_~==... :..~ n~.~:.._.- ---- ~- -I" '~-.-. I 1 I II ._._.____ .--+-.M"'a; 1 'I I] _ .______ .tiEToP~A[[.v.:. l' ill I ~ ll. _ - - -.... ~ - ~~;'OG.3T~R~~ DsJ:4 t- I , I I ' . 1 I It I ':"f~-'---: -'-6I-lEARTi<i.iss$-- 1'1= 1-"'~ ~H5TC40EA.5IDE - 'I,-jt -: -._-.-:....~_~~_~:: 'u ,,_.~~r ~~I-l~~EN _" __.~ ".''''' -. 6I-lEAR ~I ~l-' -' ~ I- WAL.L SLOCKING =- ~.=.=~'~.:~.:-~-."-i......~ ~_.-~- :~'-:='=:=fj~-'- EXTEr;; ~-~~3^ -- - -' - - _"'iA~"" - --;:Lt- Dc:IID'< roGi1~R'-' ~...... -' -'- -r~ ~~,.......... -. -' ~- _' TRU:, 9,R 6I-:iEA~LL5 _.....' _. _. _. _' ~." (-==~ (g) ._.._+___ j I i ~ I >1 I.i uppeQ FLOOQ PLAn ../ j ) 'J" .. , 'e:F~~' ... . File: #5:!196V-I0013..DI..OR Dale: 1/:!005 . 5/ D.:si:;ns 8:. Engineering. Inc. Cli.:nt: Sun!.:! 110m.: Design Job No. 1601 718 . ~-----~._---_._..._---_._----_._--------------------------------------------------------------.------------------------- ~ CV 0 i i .~ i71. i . ~ " I J I BEAH I -- II -~ ii I '~"';.., - ri~lf~ II:TTr J . 1:1 i ~LL I . . . I '1 I lorr ~ I I' 'iD, II I i I I ill i D! , i . [DII I [iJ i j ! i I~! I i I I I' i i II i i i i i !ft..f+fl i I ( r.- I ; /,\ II I: I I ' n I ,. I ! !IQ? ;1t! II I ~iciJll!I~!" i i(ir- /; ! I r j ! ~ )"~.....'-, '_' ~!-..J...._~II,'-'_~.. _._.._._ , " ~ j I BEAH, r ' , 'I . YJG / ~"lml . --~---C' _%~~~~?~~~~~~;o ;-t~~~;~--~-- .J~)j / / / / / // / / /7lY / ~~/ / / / /" "~//////// ///(/V/ ~///// I IN SHADED AREA..-/' / / / / / / ///// ~:;2~>, / / . / / / i), PROVIDE SPJ:CIA~ / / / / / / N 9' / r.1 - ~, F~OOR NAI~ING. SEE / ~ / / / / / / /f // / . / tlJ (OPEN fbl SCl-IEDU~E FOR INFO / " / / / / / / / / I jQ TO ABOVE) L::.J..... _ J_,/// //, _ '/ - - v / / -~--- ;.;'/;:~~;/~~~~~ - ~\-J--~.;;.>~~r~N)--..- :;/,/LL'.J!.-'- - - ." - - ~lr or: / ~ BE.oM4 ill EXTEND F~OOR 14 - - ie!lL 4x4 wi ECC44 , ~14Go OUT TO ~ \ 1--- FfWNT WAL~ BE~OW I. __ ._._.~<; j6l:!A L 3e>~_.._._ ....-._.-..~ ~ENGT~ TO 'OF WAL~ PLATE' I'!e 1AINING TO 4X FLOOR E ~OCKING 0' '< SEE DETAIL "'3 ExTEND !-lEADE OYER ENDWAL~& I\Aln FLOOR PLAn j , ~-. . .'-,/ , .1ksi:,!llS &. EngillC.:-rill'o'. Inc, ('I' III 'rP/1 e _ . "1~'ll;;JS~I;:~' ';~1; ;;;Si;:l' j;t;"No','16oi " e;' ---_.-~~--------~._----------------------------------------------------------------------------------------------------- cp cp i i . ~~ ~.1r.---~---, ~? f/;L-.-..!. -- -... - - - - - - ...~-:-..=.r.- -] ll::::::..- -~ - - -,.-.- ~ I r-----------J '! ~-'------ll I I I I I I I I I ' I .J I I I :[11 I ! I Ll=i1 ' I ~~I I I :' ~ I' I I I.. : f8\-._..1 !!'- - - - - - - · - .-.-+.-..-..-._.-1..]1._.- ~ !ir=:="':~'~::i~.': 0' !. : I :1 ~:I~I Qr I ,I II " 1!;#' I . I ". f , I I ' vV ,-J i '.,., r'l I @-..-,-..~ -l-._._,~ ~ ~ -- - - --',! ~_._._.._.-l.. L_._ l~( L_-:.r-...., I ' I I . I II I I I 1"'1 .1 I I I II I I I I II : I ~ ~. I I I r-.., I I " I I I I ~ ( II ~.I L_..J I I I " E>';/ I I I' I I . @- I I '\;1,'" I ---..,~____~. J I D ..-' ......-.-..-..-.-..-+ .._.1". ..--"""","",'-.- I ...-....--' .7". ( 1 r. 1 ~~ ~~$" 1 ~ ~ ~ ~7 ~~ I I I I r~ ;, I L"'--SEE @-7- @-, 0) ------------- ...-.--- --.----..... SEE DETAIL 09 EXTEND HEAPE OVER ENDUJALL5 FounDA Tlon PLAn \i /' . I .. "", , . a~ l'roJCct: l'axton- v 0)': .<"1' .~,lt:"l "U; '. .' File: #52196V-100B-DI-OR Date: 1/2005 ~ ..Dcslgns & Englllecnng, Inc. Client: Suntel Home Design Job No. 1601 18 ----------------------------------------------------------------------------------------------------------------------- - WIND ANALYSIS USING 2004 O.S.S.c. PROJECTED-AREA-METHOD. Exposurc B. 100 mph Basic Wind Speed 1'= Cc x Cq x Qs x I Cq := 1.3 Qs := 16.4 j := 1.0 Height Above Ground Coefficient '. 00-15 ft. 15-20 ft. 20-25 ft 25-30 fl. 30-40 1'1. Cel := 0.62 Ce2 := 0.67 Ce3 := 0.72 Ce4 := 0.76 Ce5 := 0.84 Find wind pressure for each height category: PI := Cel.Cq.Qs.j P2 := Ce2.Cq.Qs.I P3 := Ce3.Cq.Qs.I P4 := Ce4.Cq.Qs.I P5 := Ce5.Cq.Qs.j PI = 13.22 psf P2 = 14.28 psf P3 = 15.35 pst' P4 = 16.2 psf P5 = 17.91 psf :~ ,... I. .. "oJ , i!;edlR/v .' Dcsiglls & Engineering, Inc. Project: p(Lxlon- V By: RF File: #52196V-100B-D1-0R Date: 1/2005 Client: SunleI I-Iome Design Job No. 1601 ------------------------------------------------------------------------------------------------------------------------- silcct NJ. a/,S FRONT & REAR WALLS Height Above Ground Projected Area 4-15 Ii. I5-20 ft. 20-25 n. 25-30 ft. 30-40 Ii. A I := 530 sq. Ii. A2 := 225 sq. ft. A3 := 220 sq. ft. A4 := 200sq. ft. AS := 0 sq. 11. Find wind forces at roof and second-floor ievcI: FRwl := P5.A5 + P4.A4 + P3.A3 + P2.A2 FRwl = 9.83 x 103 pOllnds F2wl := PI.AI F2wl = 7.01 x 103 pounds SIDE WALLS Height Above Ground Pro j ecled Area 4-15 ft. 15-20 n. 20-25 ft. 25-30 ft. 30-40 ft. Al := 400 A2 := 180 A3 := 170 A4 := 110 A5:= 0 Find V.111d forces at roof and second-floor level: sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. FRw2 := P5.A5 + P4.A4 + P3.A3 + P2.A2 3 FRw2 = 6.96 x 10 pOWlds F2w2 := PI.AI 3 F2w2 = 5.29 x 10 pounds ,~ ; i. .. "--r- . e!JI'~ Proj.:ct: Paxton-V By: RF Sllc.:t No: .~::~~~~~:_~_~~~~~~~~~~~'_~~~~~_...._..........__~~~;~~!:~~~~~~~~~~~~~;_~i~~____....____~~~~?~:l~~f....__________~/l ~ SEISMIC ANALYSIS USING 2003IBC SIMPLIFIED ANALYSIS PROCEIHJRE Data: 1=1.0 Sd:= 0.75 R:= 6.5 r := 0.45 (worst case) E = Earthquake Base Shcar = 1.2 p Qd 1.4 = 1.2 p (Sd WI 1.4R) W.:ights: Roof Dead Load = 15 psf (Composition Roof Covering) Floor Dead Load = 10 psI' Partitions = 10 psf Exterior Walls + Windows = 10 psf (Average) Mass Calculations: Aroof := 1550 ft^2 A2ndFloor := 1350 ft^2 Al stFloor := 1800 ti^2 h2 := 21 n . Aroofwall := 700ti^2 A2wall := 1400 ti^2 Alwall := 0 ft^2 hi := 10ft Mroof := 20. Aroof + 10. Aroofwall M2 := 20.A2ndFloor + 10.A2wall . 4 Mroof = 3.8 x 10 4 M2 = 4.1 x 10 pOllnds pounds 20 p:= 2- r."; A2ndFloor p:=if(p< 1,I,p)p= 1 Sd E := 1.2.p. . (Mroof + M2) 1.4.R 3 E = 7.81 x 10 pounds Distribute Seismic Shears 0:= Mroof.h2 + M2.hl 6 D = 1.21 x 10 Mroof.h2 FRe := .E D 3 FRe = 5.16 x 10 pounds M2.hl F2e := .E D 3 F2e = 2.65 x 10 pounds '; :' .. r# .. ../ , . '. i!JI~ Project: Pax lon-V By: RI' Slleet No. "~~~~~~::~_~_:~~~~~~~~~~'_~~~:~_......__..........~~~;~~!:~~~_~~r~~~~~~~;~i~~______m_~~~?~:I~~f____......_____I_~ I, ~ INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH; Analyze entire brace wall line as a series of perforated shearwall panels using worst-case "maximum opening height ratio. Individual perforated shearwall panels extend between plan discontinuity. Overturning for such panel is calclilated by rational analysis. Reference Section 2305.3.7.2 - 2003IBC Unadjusted in-40699Ee shear force for brace wall line, FRe = 3000# Percent full-height sheathing = 8 ft. I 16 ft = 50% Maximum opening height ratio = 4ft 18ft = 0.50 Shear-resistance adjustment factor, Co = 0.8 (Ref: Shear-resistance adjustment factor table) Amplified in-40699Ee shear, V = Unadiusted shear force for brace wall line Shear resistance adjustment factor x Total length of full-height walls = FRe I (Co x L) = 3000# I (0.8 x 8 ft) = 468 plf Uplift at perforated shearwall ends calculated based on rational analysis (use only 50% of first individual full-height wall weight for dead load) 2/3 average weight of full-height wall segments and portion of roof framing, Wd = 110 plf 2/3 dead-load reaction at end of shearwall or comer restraint, RI = 400# Uplift at end of perforated shearwalls, Pu == Vfx hI - Wd x (0.5 Ll) - RI = 468 plf x 8 ft - 110 plf x (0.5 x 4 ft) - RI = 3100# Uplift between wall ends, 1.= V- Wd = 468 plf - 110 plf= 360 plf Wall bottom plate (I 1/2" thickness) to rim joist. Use 20d box nail (0.146 by 4 inches). Lateral resistance = <I>YZ' 11.4 = 135# per nail and withdrawal resistance'!>YZ' 11.4 = 130# per nail. Nails for shear transfer = (shear force, V) I OYZ' = 468 plf I 135# per nail = 3.5 nails per foot Nails for uplift transfer = (uplift force, t) I OYW' = 360 plf 1130# per nail = 2.7 nails per foot Net spacing for shear and uplift = 3" o.c. Rim joist to wall top plate. Use 12d sinker nail (0.131 by 3 in.) toecnailed to provide shear transfer. Lateral resistance = <I>YZ' = 150# per nail (default maximum for seismic loads) Simpson "L TP5" capacity = 630# Net spacing for shear using LTP5 clip and 16d toenails at 8" O.c. = 630# I (468- 150#) = 24" O.c. Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced moments and shears. Continuity of load path is provided by holdowns at ends of the perforated shear wall. Use Tvne "C" shearwall wi HTT22 holdowns. 16d at 3" o.c. sole nlate nailinl! and LTP5 clins at 24" o.C. I'" ... ~ 1\...., i!J1~ I Sheet No. "/'8 Project: Paxton-V By: RF File: #52196V-100B-DI-OR Date: 1/2005 Client: Suntel Home Design Job No. 1601 ----------.---------------------------------------------------.------------------------------.-------.------------------- .' Designs & Engineering. Inc. FRe. ~lZ'00- RI.4iZ1iZ1- ~ ~ ~ . l-40LDou.N \ Pu . 31ez>0- ~ I 4'-/Zl" J P$,W. eeCl~ j, L A'_M" I 4'-/Zl" } p.e'w. 5sClment j, ~__rn""'I"'''' ~11 ELEV A TION OF. PERFORATED SHEARWALL MAXIMUM OFENlNU f-IEIG\..lT RATIO AND f-IEIGf-IT WALL f-IEIGf-IT "" W2 ''''' ,"'. " e'-". 2'-S. 4/.". So'."''' 6'.". S'-". I Pcsreetlt Fullol-4eight &hctathlns 6hs.sr Ra,l'tllnce AOJu't/IUSfIt FlIClot - '''' ".6' "", lZl.43 "... ''''' '''' 1'D,11 o.s. "A5 "... ,"" '" 1'D.1"" ".s. "A' 1'D.42 ...... '" 1'D.11 ".6' "", ".4~ """ '" "J!A) ".6' "", ".... ."" '" ".., ".11 ".6' "". ,"" '" ".., r2'.11 ".6' ".6, ~ '" r2'.l31 ".., ltD.11 e.11 SHEAR RESISTANCE ADJUSTMENT FACTOR , \:.'..~ . ...r ~~ ProJect: I'axton-V By: RF Sheet N~: '. ~~~_~~~~_~_~_=I~~~~:_~~~~~_~~_~~___________~~~;~~~:~~~~~~!ii~~~~~;ii~~__________~~~?~~I~~f____......____~_~ /J s H\VESTIGATE UPPER-FLOOR SHEAR WALLS: Line "A II Rear Walls: Summation of full-height walls lengths = . Total length ofhmce wall line = % full-height sheathing = S := ...!::..IOO ~ TL L:= 20 fl. TL := 34 fl. S = 58.82 percent Diaghragm stress = v := 0.5. FR TL Shearwall stress = v:= 0.5.~ 0.8.L v = 144.58 I'll' Uplift for shearwalllength = L1 := 3 ( worst case) Pu:= v.8 - .5.Wd.LI.~ RI ft. v = 307.24 I'll' Weight = Wd:= 110 pIt' RI := 400 # Pu = 1.89 x 103 pounds Use Tvue "8" Shearwall wi MSTC40 holdo\~11S Line "B" Summation of lull-height walls lengths = L:= 19 ft. Front Walls: Total length of~race wall line = TL := 34 ft. % full-height sheathing = S := ...!::..I 00 S = 55.88 percent ~ TL D' h FR v = 144.58 I'll' tag ragm stress = v := 0.5.- TL Conventional FR Shearwall stress = v := 0.5.- v = 258.73 pIt' L Seismic Shearwall = FRe stress wi aspect v := 1.75.0.5.- v = 237.69 I'll' ratio penalty L Perforated .. FR Shearwall stress = v := 0.5-- v = 323.41 plf 0.8.L Uplift for sheanvalllength = L1:= 2 (worst ease) Pu := v.8 - .5. Wd.L1- Rl ft. Weight = Wd:= 110 I'll' Rl := 400 # Pu = 2.08 x 103 powlds Use TVDe "8" Sheanvall wi MSTC40 holdowns for conventional walls. Tvue "C" for oerforated Shearwalls · ,.J.... :!J1~ Project: Paxton-V By: RF Sho:ct N'o. . ~~~_~~~~~~_~_~l~~~~~:~~~~_._~~_~~___......_____~~~;~~:~~~_~~:~~~~~~~~;~~;____m___~~~~.~I~~L_............__'31, g INVESTIGATE I!PPER-FLOOR SHEARWAI.I.s: Line I Walls: Summation of lilll-hcight walls lengths = Total length of brace wall line = % full-height sheathing: S := ~.I 00 .. TL D. I FR lag lragm stress = v := 0.4-- - - TL Shearwall stress = v:= 0.4. FR L Uplift for shearwalllength = LI := 8 (worst case) Pu := v.8 - .5.Wd.LI - RI I.J~e Tvne "B" Shearwall wi no holdowns Lino: 2 Walls: Summation of full-height walls lengths = Total length of brace wall line = % full-height sheathing: S := ..!:..IOO .. TL D. h FR lag ragm stress = v := 0.5.- - - TL FR Shearwall stress = v:= 0.5.- L Uplift for shearwalllength = LI:= 13 ft. (worst case) Pu := v.8 - .5. Wd.LI - RI Use Tvoe "8" Shearwall wI no holdowns L := 26 n. TL := 36 ft. S = 72.22 percent v = 77.37 plf ft. v = 107.12 plf Weight= Wd:= 210 plf Rl := 400 # Pu = -383 pounds L := 29 ft. TL := 32 ft. S = 90.63 percent v = 108.8 plf v = 120.05 . plf Weight= Wd:= 110 plf Rl := 400 # Pu = -154.57 pounds ,..-' .J,... . , ata<<!/v ~heet No, 14/,'8 Project: Paxton- V lJy: KI' File: #52196Y.-100B-DI-OR Date: \12005 Client: SlUltel Home Design Job No. 1601 -------_...---~---_._------------------------------------------------------------.------------------------------------- '/ Designs & Engineering, Inc. lNVEST1GA TE UPPER-FLOOR SHEARWALLS: Linc 3 Walk Summation or full-height walls lengths = Total length of brace wall line = % full-height sheathing = S := ....!:..1 00 - - TL L:= 30 Ii. TL := 32 ft. S = 93.75 percent Diaghragm stress = v := 0.2. FR - - TL v = 43.52 plf ShcaL'wall stress = v:= 0.2. FR 0.8.L v = 58.03 plf Weight = 'wd:= 110 plf Rl := 400 # Uplift for shearwall hmgth = L1 := 3 (worst case) Pu := v.8 - .5.Wd.L1- Rl ft. Pu = -100.79 pounds Use Tvoe "B" Shearwall wI no holdowns . () .A". ~'UIf/fIeI'V I IVJ'''''''"~' 1 UAll.JlI- 'r I..1J. .'\.I l},IlIl".I".1 L''-'. ~~_~~~~~~_~_~_~~~~:~~_I~~~~~~~~___________~~~;~!:~~~_~~r~i~~~~~~;;i~~_____....___f~~~?~~I~~L______......~_: ~~ . . '. . 0.5.FRwl +0.3.F2wl Run/blockmg stress' v := TL O.5-FRwl + 0.3.F2wl v:= L INVESTIGATE LOWER-FLOOR SHEARW AILS: Rear Walls: Line A Summation of full-height walls lengths = Total length ofbraee wall line = % full-height sheathimi': S := ..!::..IOO ~ - TL . F2wl Olaghragm stress = v := 0.3. TL Sheanvall stress = Uplift for shearwalllength = ( worst case) Pu:= v.9 - .5.Wd.L1- RI L1 := 2 Use Tvoe "0" Shearwall wI ~rn'22 holdowns Garage Rem' Walls: Line B & C Summation of full-height walls lengths = Total length of brace wan line = % full-height sheathing: S := ..!::..I 00 TL L:= 12 n. TL := 37ft. S = 32.43 percent v = 56.8 plf v = 189.66 plf v = 584.8 pl1' ft. Weight = Wd:= 110 pl1' RI := 400 # 3 Pu = 4.75 x 10 pounds L := 18 ft. TL := 18 ft. S = 100 percent . F2wl Omghragm stress = v := 0.3. y = 116.76 plf - - TL 1.5.0.4.FRwl + 0.5.F2wl Rim/blocking stress 'v := v = 522.33 plf TL Shearwall stress = 1.5.0.4.FRwl + 0.5.F2wl y := y = 522.33 L plf Uplift for sheanvalllength = (worst case) Pu:= y.9-.5.Wd.L1-RI L1 := 2 Use Tvne "0" Shemwall wI PH06 holdowns ft. Weight = Wd :=110 plf RI := 400 # 3 Pu = 4.19 x 10 pounds . II .A,,"" . a~ ~heet 1\;(;'. Project: Paxton- V tly: JU File: #52196V-100B-DI-OR Date: 1/2005 .' Designs & Engineering, Inc. Client: Sunte! Home Design Job No. 1601 --------~.._--------------------------------------------------------------.--------------------------------------------. ,/pI,s INVESTIGATE LOWER-FLOOR SHEAR WALLS:, Front Walls: Line C Summation of full-height walls lengths = Total length of brace walllinc = % full-hei,,"ht sheathinl! = S := ...!::..I 00 - TL Diaghrngm sli'ess = v.:= 0:15. F2wl .. TL L := 8.7 ft. TL := 21 ft. S = 41.43 percent v = 50.04 plf .. O:l5.FRwl + 0.25.F2wl Rlln/blockmg stress 'v:=- v = 153.63 plf TL 'O:l5.FRwl + 0.25.F2wl v:= L Shearwall stress = v = 370.83 plf U pi i ft for shearwalllength = (worst case) Pu := v.8 - .5.Wd.L!- RI L! := 1.7 ft. Weight= Wd:= 110 plf Rl := 400 # 3 Pu = 2.47 x 10 pounds Use TVDe "e" Shearwalls wi HTT22 holdo\'ms AND Gara\!e Frame Detail i7fU,U!/1/ , File: #52l96V-IOOB-Dl-OR Date: 1/2005 .' Designs & Engineering, Inc. Client: Suntel Home Design Job No. 1601 --------_.._---~--------------------------------------------------------------------------------------------------------- .. 0.4.FRw2 + 0.35.F2w2 Rlln/bloekll1g stress' v := TL 0.4-FRw2 + 0.35.F2w2 v := 0.74.L . 4.j." ~ J lUJ...."l. I "....lOU-. I\VLSTIGATE 1.0\I/ER-I-'I.00R SIIEARWAU.s: Line 1: Summation of full-height walls lengths = Toiallengih of brace wall line = .. L % full-height sheathing = S := -.100 ~ - TL '. h 0 25 F2w2 D lag ragm stress = v:= . . TL Shearwall stress = Uplift for shearwalllength = (worst case) Pu:= v.9 - .5.Wd.Ll- RI Ll := i3 Tvne "B" Shearwalls wi no holdowns Une2: Summation of full-height walls lengths = Total length ofbnice \vallline = % full-height sheathing = S := ~.100 TL . ' F2w2 DIaghragm stress = v := 0.5- ~ - TL ~J' ...... ...Jy.._~~ . .:.. 'l/1 S L := 36 fc TL := 44 ft. S = 81.82 percent v = 30.04 plf v = 105.36 plf v = 174.02 plf fl. Weight = Wd:= 110 pit' Rl := 400 # Pu = 451.16 pounds L := 18 ti. TL := 18 fr. S = 100 percent v = 146.87 plf R. Ibl k' 0.5.FRw2 + 0.5.F2w2 1m oc mg stress 'v := TL v = 340.29 plf S hearwall stress = 0.5.FRw2 + 0.5.F2w2 v:= L v = 340.29 plf Uplift for shearwalllength = l worst case) Pu := v.9 -.5- Wd.Ll - Rl L1 := 17 Tvoe "COO Shcarwalls wi HTI'22 holdowns 11. Weight = Wd:= 110 plf RI := 400 # Pu = 1.73 x 103 pounds it ........".,A. , . , ~ ......1V~lV ril~: #52196V~10013-DI-0R Date: 1/2005 \,&/ . Designs &. Engineering. Inc. Client: Sunte! Home Desio"n Job No. 1601 I ~ i _________________________________________________________________________________________________________________________ INVESTIGATE LOWER-FLOOR SHEARWALLS: Line 3: Summation of full-height walls lengths = Total length of brace wal\line = % full-height sheathing: S := ..!:...100 TL Dial!hral!m stress = v := 0.25. 1'2w2 - - TL L := 29 ft. TL := 38 fl. S = 76.32 perccnt v = 34.79 plf . ". 0.2.1'Rw2 + 0.25.1'2w2 Rlln/blockmg stress' v := - TL v = 71.43 plf Shearwall stress = v:~ 0.2.1'Rw2 + 0.25.1'2w2 L L1 := 3 v = 93.6 plf Weight = Wd:= 160 plf R1 := 400 # Uplift for shearwall1ength = (worst casc) Pu := y.9 - .5. Wd.L1 - Rl ft. Pu = 202.42 pounds Tvne "13"'Shearwal\s wino holdowns .