Loading...
HomeMy WebLinkAboutPermit Correspondence 5-4-13 Apri113,2005 Mr. Jeff Wisdom 924 E Street Springfield OR 97477 Dear: Mr. Wisdom I have completed a preliminary plan review of your application for the proposed house foundation and basement/garage located at 1259 S 2nd Street, Springfield, Oregon. The following items require additional information, clarification or correction in order to complete the review, approve the application, and issue permits. Please submit two sets Of documentation containing appropriate information in response to the following: 1. It appears that a retaining wall will be required to hold back the soil from the adjoining property to the north for the driveway area. Retaining walls that have a differential grade exceeding 3 ft. on opposite sides of the wall shall be professionally designed. The only retaining wall design submitted with your application includes a footing with a 42" heel on the soil side of the wall. This heel would be located on the adjoining property to the north according to the submitted drawings. !} ~~ ~2 ~ ~ Please note'that construction activity of any kind, including excavation and fill shall not be conducted an adjacent property without the express written consent ofthe property owner. You must either provide a retaining wall design that will not encroach onto, or jeopardize the existing grades at the adjoining property, or obtain the owner's written permission to excavate into the adjoining property and to permanently install the proposed retaining wall footing on the property. Written permission is required if any portion of the wall, or , excavation for the wall, is to encroach onto the adjoining property. No foundation details have been submitted other thari the high retaining wall. Please submit foundation and framing details for the interior framed walls and the exterior framed walls for the basement area. Please also define where the transitions between the retaining walls and framed building walls will occur on the foundation plan and the building elevation drawings. Please note that reinforcing steel is required in all continuous foundations for this seismic zone, and should be shown in the foundation details. Two #4 bars are required in the footing, and another #4 bar is recommended in the stemwall. 3. The 6"x6" beams proposed for support of the main floor structure'above the . garagelbasement appear inadequate to support the required floor loads. A beam appears to be missing between the retaining wall at the rear of the building and the back interior wall of the garage. Please provide beam calculations for the required beams, and shOw the location and size of all required beams on the computer generated foundation plan. 4. The entrance to the main level ofthe building is elevated one story above the ground level. A building permit is required for landings and stairs located more than 30" aboye the adjacent grade. Please provide a detailed design for the required stair and landing, or deck, needed for access to the main building entrance. 5.' The approved septic Site Investigation documents submitted with the plans is still valid, according to George Ehlers, manager of on-site sewage disposal for Lane County. However, no valid septic installation permit presently exists for the property. Building permits cannot be issued until a valid septic permit is obtained from Lane County. Please contact George Ehlers at the Lane Co. Dept of Environmental Health, at the Lane Co. Building, 125 E 8th Ave, Eugene (in the basement) Phone 682-3951. Please provide George with a copy of your building plans so he can help determine the best approach for the septic system. Please not~ that the proposed location for the septic drain field shown on the expired permit is in a grove of trees at the rear of the property. The Planning Division advises that a tree felling permit will be required if more than five total trees over 5" in diameter are removed from the site, including the trees already removed. You may want to investigate, with Lane Co, the possibility of locating the septic system in an area to avoid the trees if possible. The enclosed aerial photo of the site may be of some assistance. Because the information needed is necessary to complete your review, the project will be placed on "Hold" until we receive the required information. Once I have received the infoimation requested above, we will resume our processing of your application and phone you once your application has been reviewed. Please be aware that processing your application may require an additional two weeks from the day we receive the requested information. If you have any questions, please feel free to phone me at 726-3623. Sincerely, Donald Moore Construction Representative/Plans Examiner cc. Lisa Hopper, Building Safety Supervisor David Bowlsby, Building Permit Review Tech. Tara Jones, Planner