Loading...
HomeMy WebLinkAboutItem 06 Bid Award for Project P20524: Olympic Street Re-Striping Project - Mohawk Blvd. to 21st Street Meeting Date: Meeting Type: Department: Staff Contact: Staff Phone No: Estimated Time: July 2, 2007 Regular Meeting Public Works rYf-,., Kristi Krueger \L \L . ~6 ~ 726-4584 . ~ Consent Calendar AGENDA ITEM SUMMARY SPRIN.GFIELD CITY COUNCIL ITEM TITLE: BID A WARD FOR PROJECT P20524: OLYMPIC STREET RE-STRIPING PROJECT- MOHAWK BLVD. TO 21st STREET. ACTION REQUESTED: Approval of the following motion: TO AWARD THE SUBJECT CONTRACT TO BROWN CONSTRUCTION IN THE AMOUNT OF $ 196,328.80. ISSUE STATEMENT: One bid was received on this safety improvement project. Contract award is now necessary to enable work to proceed. ATTACHMENT A: Bid Summary DISCUSSION/ FINANCIAL IMP ACT: On February 2, 2007 the City Council approved the staff recommended Safety Plan of Olympic Street from Mohawk Blvd. to 21 SI Street due to a fatal motor vehicle versus pedestrian crash that occurred at the mid-block crosswalk. Staff designed the safety project which includes a slurry seal with pavement marking replacements to provide for one through lane and one bike lane in each direction, a two way left turn lane, and an auxiliary lane for use by westbound right turning vehicles and L TD buses dwelling at bus stops. Crosswalks are remarked as needed in their existing locations, except the mid-block crossing has been moved eastward and shaped in a Z format with a raised concrete island as a refuge. Pedestrian actuated flashing beacons with pedestrian crossing warning signs are included at the mid-block location. All other signing are updated to current standards. The street lighting has been upgraded from the 180 Watt Low Pressure Sodium (LPS) to 250 Watt High Pressure Sodium. The ADA ramps and driveway wings are also being upgraded. . The project received 'one bid on June 12 by Brown Construction in the amount of $196,328.80. Sufficient funds are budgeted in the Traffic Control Project account (850013). The project is unique in that there are many small items generally done by subcontractors and not a large item such as concrete or asphalt that General Contractors normally bid on and is possibly why more bids were not submitted. Retracting the project to re-bid or split the project in pieces would take resources in excess of the difference in the engineer's estimate and the actual bid amount. In addition to resources, the project would riot be able to meet the necessary deadline in order to complete the project on the schedule that was promised to the local businesses and would also bid late in the construction season causing bids to be even greater. SUMMARY OF UNIT PRICE BIDS RECEIVED: June 12, 2007 PROJECT P20524: Olympic Street Re-striping ENGINEER'S Brown Brown APPROX. UNIT Contracting Contracting ITEM DESCRIPTION PER QUANT. PRICE EST. UNIT BID CONSTRUCTION BID ITEMS 0060 MOBILIZATION L.S. 1 $5,500.00 $ 19,000.00 $ 5,500.00 $ 19,000.00 060a EROSION CONTROL L.S. 1 $500.00 $ 750.00 $ 500.00 $ 750.00 0066 LANDSCAPE RESTORATION S.Y. 50 $10.00 $ 15.00 $ 500.00 $ 750.00 0069 RESTORATION AND CLEANUP L.S. 1 $1,000.00 $ 2,000.00 $ 1,000.00 $ 2,000.00 0071 ASP HAL T & CONC. REMOVAL S.F. 1,412 $3.00 $ 11.25 $ 4,236.00 $ 15,885.00 0075 COMMON EXCAVATION C.Y. 56 $17.00 $ 60.00 $ 952.00 $ 3,360.00 0086 AGGREGATE BASE 3/4-0 TON 122 $15.00 $ 25.00 $ 1,830.00 $ 3,050,00 0099 SLURRY SEAL S.Y. 7,200 $3.00 $ 2.75 $ 21,600.00 $ 19,800.00 0102 A.C. IN PLACE CL. B TON 32 $60.00 $ 140.00 $ 1,920.00 $ 4,480.00 0121, REINFORCED DRIVEWAY 8" SF 1,505 $9.00 $ 11.00 $ 13,545.00 $ 16,555.00 0124 REMOVE PC DRIVEWAY S.F. 1,505 $1.50 $ 0.40 $ 2,257.50 $ 602.00 0136 HANDICAP RAMPS S.F. 170 $6.00 $ 8.00 $ 1,020.00 $ 1,360.00 0137A HANDICAP RAMP DETECTABLE WARNING S.F. 16 $25.00 $ 45.00 $ 400.00 $ 720.00 0166 CONCRETE EXTRUDED CURB 6x6 L.F. 92 $15.00 $ 10.00 $ 1,380.00 $ 920:00 0189 CONCRETE 6" NON REINFORCED MEDIAN S. F. 370 $6.00 $ 10.00 $ 2,220.00 $ 3,700.00 0197 SAWCUT L.F. 190 $2.00 $ 5.00 $ 380.00 $ 950.00 CONSTRUCTION ITEM BASE BID - TOTAL $ 59,240.50 $ 93,882.00 $ 59,240.50 $ 93,882.00 TRAFFIC BID ITEMS 0061 TEMPORARY TRAFFIC CONTROL L.S. 1 $7,500.00 $ 13,000.00 $ 7,500.00 $ 13,000.00 0222 12" WHITE PLASTIC STRIPE L.F. 697 $6.00 $ 7.00 $ 4,182.00 $ 4,879.00 0223 8" WHITE PLASTIC STRIPE L.F. 3,675 $4.00 $ 4.50 $ 14,700.00 $ 16,537.50 0225 12" YELLOW PLASTIC STRIPE L.F. 40 $6.00 $ 6.70 $ 240.00 $ 268.00 0227 4" YELLOW PLASTIC STRIPE L.F. 2,589 $2.00 $ 2.20 $' 5,178.00 $ 5,695.80 0236 PLASTIC BICYCLE PAVEMENT MARKINGS EACH 10 $175.00 $ 217.00 $ 1,750.00 $ 2,170.00 0243 24" WHITE PLASTIC STRIPE L.F. 111 $12.00 $ 13.00 $ 1,332.00 $ 1,443.00 0245 REMOVE STREET SIGN EACH 3 $100.00 $ 300.00 $ 300.00 $ 900.00 0604 Install #1 Junction Box EACH 1 $275.00 $ 300.00 $ 275.00 $ 300.00 0616 1.5" PVC ELEC. CONDUIT L.F. 25 $4.50 $ 30.00 $ 112.50 $ 750.00 617 STRIPING REMOVAL L.S. 1 $1,000 $ 1,400.00 $ 1,000.00 $ 1,400.00 0620 INSTALL NEW TRAFFIC SIGNS EACH 8 $225.00 $ 430.00 $ 1,800.00 $ 3,440.00 0624 Install 1.5" PVC Conduit 'Stub Out' EACH 6 $200.00 $ 600.00 $ 1,200.00 $ 3,600.00 0631 LEFT ARROW (PLASTIC) EACH 9 $175.00 $ 180.00 $ 1,575.00 $ 1,620.00 0634 PLASTIC ONLY LEGEND EACH 6 $225.00 $ 295.00 $ 1,350.00 $ 1,770.00 0637 Type I Two-Way Pavemeflt Markers EACH 25 $4.00 $ 6.00 $ 100.00 $ 150.00 0638 Type lOne-Way Pavement Markers EACH 62 $4.00 $ 6.00 $ 248.00 $ 372.00 647 INSTALL PEDESTRIAN FLASHER-BEACON SYSTEM L.S. 1 $12,000.00 $ 18,500.00 $ 12,000.00 $ 18,500.00 0673 #14 AWG LOOP FEEDER WIRE L.F. 5,395 $3:00 $ 0.70 $ 16,185.00 $ 3;776.50 0675 3' BIKE DETECTION LOOP EACH 5 $250.00 $ 375.00 .$ 1,250.00 $ 1,875.00 0676 6' VEHICLE DETECTION LOOP EACH 40 $350.00 $ 500.00 $ 14,000.00 $ 20,000.00 'I> - 'I> - TRAFFIC BID - TOTAL $ 86,277.50 $ 102,446.80 $ 86,277.50 $ 102,446.80 -------------------------------------- ------ --------- --------- -----'---- --------- CONSTRUCTION ITEM BASE BID - TOTAL $ 59,240.50 $ 93,882.00 $ 59,240.50 $ 93,882.00 TRAFFIC BID - TOTAL $ 86,277.50 $ 102,446.80 $ 86,277.50 $ 102,446;80 BASE BID - TOTAL (Construction and Traffic Items) $ 145,518.00 $ 196,328.80 $ 145,518.00 $ 196,328.80 Percent Over (+) or Unde 34.9%1 C:IDocuments and Settingslkrue60871Local SettingslTemporary Internet FileslOLKDIP20524 Olympic St Re-striping 061207.xls Page 1 of 1