Loading...
HomeMy WebLinkAboutRecommendation Sheet PLANNER 9/3/2008 . . JUSTICE CENTER SITE PLAN MODIFICATION DRC2008-00024 - APPROVED MAY 9, 2008 CONDITIONS OF APPROVAL: 1. The Final Site Plan shall accurately depict the locations of all existing and proposed public water lines serving the development site. 2. The Final Site Plan shall depict the locations of electrical and telecommunication systems connections required to serve the development area. 3. To ensure a fully functioning water quality system and meet objectives of Springfield's MS4 permit, the Springfield Development Code and the EDSPM, the vegetative water quality swales shall be fully vegetated with all vegetation species established prior to issuance of building occupancy. Alternatively, if this condition cannot be met, the applicant shall provide and maintain additional interim. erosion control/water quality measures acceptable to the Public Works Department that will suffice until such time as the swale vegetation becomes fully established. 4. Prior to construction of Pioneer Parkway East improvements, the applicant shall obtain ODOT permits required for the new driveway entrance and related work in the Pioneer Parkway East right- of-way. 5. The Final Site Plan shall contain design details acceptable to the City Engineer for the street intersections affected by the site plan (B Street and 4th Street; and B Street and Pioneer Parkway East). . 6. The Final Site Plan shall provide for Knox Box keyed gate switches at the east"and west entrance driveways to the secure parking lot. 7. In accordance with the provisions of SFC 508.5.5 and SFC 912.3, immediate access and at least three (3) feet of clear space in all directions shall be maintained for all Fire Department connections. 8. Prior to or concurrent with approval of the Final Site Plan, a suitable PUE for the electrical transmission line running along the northern edge of the site shall be executed and recorded. The PUE alignment and dimensions shall be satisfactory to SUB Electric. 9. Prior to or concurrent with approval of the Final Site Plan, a suitable PUE for the underground electrical lines installed to serve the development site shall be executed and recorded. The PUE alignments and dimensions shall be satisfactory to SUB Electric. 10. Prior to initiation of any tree felling activities on the site, the applicant shall obtain a Tree Felling Permit pursuant to Planning Action DRC2008-00028. . . 11. The Final Site Plan shall provide for street trees and site landscaping trees that are minimum 2-inch caliper in accordance with SDC 4.4-I05.E & F. 12. The Final Site Plan shall provide a fencing detail for the metal panel fence around the secure parking lot. The fence style shall be consistent with provisions of SDC 4.4-1 IO.B.3.b. 13. Light fixtures located within 43 feet of the northern boundary of the site shall be placed no higher than 12 feet in accordance with SDC 4.5-1 IO.B.2.b. Date r~eceived: Planner: AL 91/dmt' / . . 14. The Final Site Plan shall provide a site and building lighting plan that is consistent with provisions of SDC 4.5-110. All lighting fixtures used on the site shall be shielded and full cut-off lenses to prevent light trespass onto adjacent properties. 15. The Final Site Plan shall provide a design detail that confirms the parking lot and driveway configuration will adequately accommodate turning movements for all Springfield Police Department vehicles expected to use the secure parking lot. Date Received: Planner: AL r~h""t /