Loading...
HomeMy WebLinkAboutCorrespondence Miscellaneous 7/28/2008 h , -' ":.f ./ " EGR & Associates, Inc. Engineers, Geologists and Surveyors 25358 Prairie Road Eugene, Oregon 97402 (541) 688-8322 Fax (541) 688-8087 , July 23, 2008 Don Haase. 1960 Gilham Road Eugene, OR 97401 RE: Skycheif Stonnwater Construction Phasing Dear:~.Haase Per your request we have contacted the City of Springfield regarding questions about development of the stonnwater system & grassy swale treatment area:--Andy Lindberg with thc city requested that an engineer prepare a letter documenting procedures to ensure proper operation of the stonnwater treatment and detention area during construction of the site improvements and duplex homes. It is our understanding that this project will follow a nonnal construction schedule and that there are no long tenn delays or phasing expected. The expected schedule will begin with rough grading, then installation of the underground utilities. Home construction would typically follow with the fme grading, paving, and landscaping coming at the end of the project. The stonnwater treatment and detention swales will be rough graded at the first stage of the project. The catch basins, stonnwater piping and outlet control orifice would be installed at the same time as the utilities. At this point the stonnwater collection system and detention area will be fully functioning. Until the time when the swales receive top soil and seeding, the swale will need to be monitored for signs of erosion from the site. Measures that can be taken by the contractor as needed to ensure sediment laden water does not leave the site include; placing plastic, mulch, or straw over exposed soils (including the swale), placing sediment barriers at the discharge point, or excavating settling basins. There are many other tools that the contractor can employ to control erosion. The extent of the erosion control measures required is dependent on the season of construction and site conditions. EGR &Associates will be available to provide guidance during construction as needed. Depending on the weather and unforeseen temporary changes in the site runoff patterns the contractor may need to construct temporary dikes or ditches to route runoff to the stonnwater system from areas such as behind stock piles or excavated foundation areas. Should there be any long tenn delays we recommend that you apply temporary seeding to all exposed areas. Please note that discharge of Slormwater onto this site from adjacent properties was not expected from the original survey and no additional provisions have been made for off site water. If there are any questions concerning operation of the stormwater system during construction please feel free to give us a call. Sincerely, EGR & Associates, Inc. Dan Olmstead, PE Civil Engineer , _. _"..u'" _. ". n ..... . ~" _."u Date Received: iJlariner: . AI- . . 1/J-r/ J.cot / I..... CC: Andy Lindberg, City of Springfield