Loading...
HomeMy WebLinkAboutCorrespondence SUB 2/12/2010 '- 02/11/2010 €0FAX 7477348 wsc FAX Ii!J 0011002 . . ~t, ";f'~~ <'*"~"". il. -~~,' ~~-'~I>) <t.it~'!Jr:; "':,;;,f:{'o ~\..{.'l! SI'RI~GF!F!!) l;TIl.!T i~ !_~, "' ? I": \V,-\Tf.R SERVICE C"E:'-lTF.R 202 South 18th Street Springfiell:!, OR 97477.5240 Tel 541.726.2396 Fax 541.747.7346 www."Iubutil.cam February 11, 20 I 0 Andy Limbird City of Springfield 225 N. 5th Street Springfield, OR 97477 Dear Andy: SUBJECT: DEVELOPMENT ISSUES MEETING #ZON201O-00001 FRED MEYER STORES Tax Map 17-03-26-24, Tax Lot 5500, 650 Q Street There didn't seem to be. any new service connections requested for this development. If any new services will be requested, listed below are our comments for the above referenced development proposal: I. The proposed development is within the Springfield city limits and will receive water service from the Springfield Utility Board (SUB). 2. All new water system facilities and modifications to water system facilities both inside and adjacent to the proposed development shall be placed in street right-of-way at a location and depth of bury that meets the standards of the SUB Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. All workmanship shall be performed to meet or exceed SUB Water Division construction standards. 5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB Water Division and the long-range needs of the City. These needs include, but are not limited to, meter location and access, sizes of water distribution ahd transmission lines, pumping facilities, and communication lines. 6. Please ask the developer to contact the SUB Water Division for detailed information on the materials and construction standards, detailed costs for installing SUB water facilities, and a schedule of construction. Construction expenses may be reduced with good planning of required water facilities, good timing of facilities installation, and joint trench opportunities: 7. All water meters will be placed in public right-of-way at a location identified by the developer. Each lot or parcel must have its oWn water service. 8. Water service facilities will be installed upon collection of development charges. Development policies and charges identified in this letter are subject to change. Actual charges will be those in effect at the time water service is requested. . S:\SITEPLAN\650 Q Street Fred Meyer Gas development issues meeting 2~ 11-1Q,docx Dat~ Receivoo:.1.z.-/J.o/d Planner: AL / " 02/11/2010 17:36 FAX 7477348 WSC FAX ~ 0021002 . . '. 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from. wells. In every instance, care shall be taken to prevent groundwater contamination, Contractors/developers/owners shall,be responsible for the safe handling and storage of chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination, Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. 10. Backflow prevention devices will be required for this service. Please contact Scott Higley at 726- 2396 prior to installing water service.. Scott can help in the selection of the most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation. . PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. Sincere9 t7 '. M/-- .~ Rebecca Templin, P.E. Water Engineering Supervisor - W liter Division RAT:mt cc: 1im Coombes, Fred Meyer Stores, Inc" P,O. Box 42121, Portland, Oregon 97242 . Chris Ferko, Barghausen Consulting Engineers, Inc" 18215 7ind Avenue South, Kent, Washington 98032 Metropolitan Life Insurance Company, 425 Market Street, Suite 1050, San Francisco, California 94105 S:\SITEPLAN\6S0 Q Street Fred Meyer Gas development issues meeting 2-11-10.doex Date Received:-Z,~,f.4te 'p' Planner: AL /'7'