Loading...
HomeMy WebLinkAboutSpecial Inspection Correspondence 2010-1-25 6 1- \l;"'.J'6 OGO Consulting, PC. Serving Oregon Geotechmcal Design & Consulting Needs Chad Bettesworth Hayden Homes 2622 SW Glacier Place, Suite 110 Redmond, Oregon 97756 January 25,2010 Re: Mt. Gate Cottages Mountain Gate Drive Springfield, Oregon Subject: Foundation Preparation - Lot 27 and 28 - s<ts:Jl2... Proiect No. 830-10-01 Dear Mr. Bettesworth: We understand that Lots 27 and 28 have recently been prepared to construct new residential foundations. OGO conducted a review of site conditions and available data at the site with our conclusions summarized in our letter dated January 20,20101 Since our initial work at the site, we understand that the foundation areas at Lot 27 and 28 have been excavated :t20 inches or greater to expose firm, on-site structural fill materials. The exposed soil was then covered with a leveling course of :t2 inches of crushed rock to provide a working surface. Field density testing of the crushed rock surfacing is not practical due to the limited thickness. Based on our previous observations and understanding of the recent minor excavation work, we believe that the site is adequate for residential development using an allowable bearing pressure of 1,500 psf or less. It has been a pleasure assisting you with this phase of your project. Please call if you have any questions or need additional assistance. Sincerely, I ,," OGO Consulting, PC. By: JYt-( HilL Mel McCracken, P.E., President 9027 NW Fir Ridge Place, Corvallis, Oregon 97330 (541) 738-0895