March 1, 2010
City of Springfield
Public Works Engineering
225 Fifth Street
Springfield, OR 97477
Altn: Mr. Kip Kaufman
Subject:
Jacobs Letter No. L TR 002
Jacobs Project No. 25LL7709
Project Name:.International Paper River W.a!er PumpingSta~iop
City of Springfield. Permit No. COM2009.01055 (iZJ1 'fa.~ /
Inspections of Civil, Str(Jc.tural, and Mechanical Work
. Dear: Mr. Kaufman
This letter is to confirm inspections of the civil, structural and mechanical work asso-
ciated with the installation of the new river water pumping station at the International
Paper Co. Springfield Mill were performed throughout construction and start up.
Back Ground: Jacobs Engineering was retained by International Paper Co. to provide
project management and engineering services for final design, permitting, construc-
tion management, commissioning and start up of a new river water pump station and
forced main to supply the mills process water needs.
I assumed responsibility for the project as overall project manager, in March 2009
and was continuously involved in all aspects of the civil, structural and mechanical
design throughout the project. Additionally I assumed responsibility for the process
and mechanical engineering for the Air Burst System which cleans the river intake
screens. .
Civil I Structural engineering and detail design for the pumping station and forced
main was completed by Gary Thornton PE, engineer of record for these portions of
the project, under my direction.
Civil I Structural engineering and detail design for the electrical sub station was com-
pleted by C.C Peterson. PE for this portion of the project under may direction.
The electrical design for the project was performed by International Paper Co., in
house engineering staff.
Construction:
Greenberry Industrial was the general contractor responsible for all civil, structural
and mechanical work on this project.
Olsson Industrial Electric was responsible for all electrical and control work for this
project. ___
International Paper retained the following firms for special inspection services.
Professional'Se~ice Industries, Inc (PSI) performed inspections for soil compaction,
concrete and reinforcing placement, CMU masonry installation, Structural steel erec-
'.
'"
.
Mr. Kaufmann
Date March 1, 2010
Page 2
tion and field welding, and concrete testing as specified by the structural engineers of
record.
Geotechnical & Environmental Consultants (GRI) performed the pile design as a sub
consultant to Gary Thornton PE. International Paper retained GRI to observe the pile
driving as specified by Mr. Thornton.
The 36" steel pipe crossing Kizer slough was shop fabricated in one piece at Green-
berry Industrial's facility in Corvallis, Or. Ultrasonic inspection of the structural welds
for this pipe was preformed at the shop by ACS Testing. Prior to shipping to the site
the pipe was visually inspected and reports were reviewed by Gary Thornton & Bob
Matzka.
Construction on the project began immediately following permit issue by the City of
Springfield. I was full time on the mill site serving as IP's project representative, pro-
ject manager, and field engineer. My field office was located in the miil engineering
department. As overall project manager: .
· I review and approve all submittals of materials and shop fabrications from the
contractors. "
o Submittals for the structural work designed by Gary Thornton and C.C.
Peterson, engineers of record for their portions of the work were for-
warded to them for review and approval prior authorizing construction.
,
· I maintained daily interaction with all the contractors and sub contractors in-
volved in the work, beginning with daily construction/safety meetings at 7:00
am each work day
. I inspect the work in progress at each location where work was being per-
formed at least once each day.
o The daily inspections of the work include excavations, back fill, compac-
tion, foundation preparation, form work, rebar installation, concrete
placement, installation of post installed concrete anchors, steel erec-
tion, welding, pipe installation, etc.
Electrical inspections for the project were called for by the electrical contractor and
were performed by the City of Springfield.
International Paper, its representative, nor the civil mechanical contractor, for the du-
ration of construction did not request the required civil, mechanical, or structural in-
spections by the City of Springfield and none of these were performed by the City of
Springfield for this project. However, through the above described activities I did ver-
ify that: .
1) The construction completed on site complies with the engineer of record's
structural design, as specified in the permitted plan documents,
2) The construction completed on site complies with 2007 Oregon Structural
Specialty Code,
3) The mechanical installation completed on site complies with ihe engineer of
record's mechanical design, as specified in the permitted plan documents, and
. 4) The mechanical system on site .complies with the 2007 Oregon Mechanical
Specialty Code.
. <.
Mr. Kaufmann
Date March 1, 2010
Page 3
This was performed as part of my responsibility as project manager and International
Paper Project Representative to insure the work was performed safely and is in ac-
cordance with, codes, specifications and accepted industry construction practices.
Attached for you records are copies of the reports for inspections performed by the
independent inspection firms mentioned above.
since71Y, 'tiJ~
/"> !
,. I'
, . "
[''''.f /
!' ;~!..', j r
'UitU' j ltt
,_,':' ;.1
. Robert A. Matzka PE
cc: Ruth Hayward