Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 1988-2-22 - _:ill NORTH~T TESTING LABOtATORIES CONSTRUCTION I~SPECTlON M~TE:Rt~LS INSPECTtON CfjEMIC~L ~N~LYSIS P"'I'~tC"'L TESTING 2285 NUGGET WAY EUGENE, OREGON 97403 Phon. 746.9649 Area Cod. 503 NON.DESTRUCTtV[ TESTINO WELDINC CERTIf"IC~TlON to.L TE:STlNO "'SS~V'NO (:UNf:HETE INSPECnUN IIEPOIIT Project: Pioneer Plaza Date Feb. 22. 1988 Reported to: Hillman Properties Report No. 19 Source of Material: Morse Bros.. Inc. Cu. Yds. Poured 9 3/4 Mix Data: 3000 p.s.i. required 4000 p.s.i. concrete placed 3/4" max. size agg. Hot Water Yards to Date Location of Pour: Tilt-up wall panel #18 - Time: building "A" Plant: Job: 2.0 hours Weather o'cast Air Temp. 460 Concrete Temp. 600 % Air No. Test Cylinders Made 4 Set No. 22 Ref. No. E-45475 Slump 4 3/4" Reinforcement Rebar placed and maintained as per approved prints. revisions and engineer'S instructions. Forms Cudng Conditions Formwork under Construction Remarks: 1 cc: lcc: lcc: lcc: lcc. Hillman Properties Frank Price Lloyd Powell & Assoc. David Hickman. Arch. City of Springfield o Inspector Mike Meyer S-487 NORTH~T TESTING LABOtATORIES CONSTRUCTION I:-lSPECTlON ~1iIl H;AI"'LS INSP(C TlON CllEMtCAL ANALYSIS r>tlY>lCAL 1ESllNG llBS NUGGET WAY EUGENE, OREGON 97403 Phone 746-96<4" Aru Cod. 503 NON.OESTRUCTlVE TESTING WELOINQ CEATII'"ICA'ION r,o.\. TEStiNG "SSAYINO OJNf:HETE INSI'ECrION HEI'OItT Project: pioneer Plaza Date Feb. 24, 1988 Reported to: Hillman Properties Report No. 20 Source of Material: Morse Bros., rnc. Cu. Yds. Poured 48 Mix Data: 3000 p.s.i. concrete required 4000 p.s.i. concrete placed 3/4" max. size agg. Hot Water Yards to Date Location of Pour: Tilt-up wall penels for building A (16,17,0,P,Q,R,S,T,U,V) Time: Plant: Job: 3.0 hours Weather Pt1y C1dy Air Temp. 410 Concrete Temp. 620 % Air No. Test Cylinders Made 4-ASTM 2-F.C. Set No. 23 Ref. No. E-45482 Slump 4 3/4" Reinforcement Rebar placed and maintained as per approved prints, revisions and engineer's instructions. Forms Curing Conditions Forlllwork under Construction Remarks: lCC: Hillman Properties lcc: Frank Price lcc: Lloyd Powell & Assoc. lcc: David Hickman, Arch. lcc: City of Springfield Inspector Mike Meyer S-487 ----. NORTHW_T TESTING LABOATORIES 2285 NUGGET WAY EUGENE, OREGON 97402 CONSTFlUCTION '~S"'ECflON MATERt"LS INSPECTION CHE"",C,l.L ANiO,Lysrs PHV~IC"L T[STlNG Phone 746.9649 Area Code 503 NON.DESTRUCflVr. TESTING WELDING CERflrlCATlON f:O.l. TESTING ,,"SSAYINO CONC:IlETE INSPECTION IlEI'tlItT Project: Pioneer Plaza Date Feb. 19, 1988 Reported to: Hillman Properties Report No. 18 Source of Material: Morse Eros.. Inc. Cu. Y ds. Poured 60 Mix Data: 3000 p.s.i. concrete required 3500 p.s.i. concrete placed 3/4" max. size agg. H.E. & Hot Water Yards to Date Location of Pour: Tilt-up wall panels: D thru N, W, 20 - of building "A". Time: Plant: Job: 3.0 hours Weather Clear Air Temp. 450 Concrete Temp. 600 %Air No. Test Cylindel"s Made 4 Set No. 21 Ref. No. E-45466 Slump 4 1/2" Reinforcement Rebar placed and maintained as per approved prints, revisions and engineer's instructions. Forms ClII"ing Conditions Formwork undel' Construction Remarks: lee: Hillman Properties lcc: Frank Price lcc: Lloyd Powell & Assoc. lcc: David Hickman, Arch. lcc: City of Springfield Inspector Jim Pinq 5-477