HomeMy WebLinkAboutPermit Building 1988-5-13
CITY OF SPRINGFIELD.' INfORltATlON UNE
COMBIIlATION APPLICATION/PERMIT 726-3753
EilERGY SOURCES: SQ. Ftg. 1.lain /~""'''''-r
Heat~ l'V~ ~Q. Ftg. Access.
\later Heater~~~ SQ. Ftg. Other
Xllew Add Alter Pep.
RanQe__,.__.,'.'.._ -Fence Demo ChangelOse
ValuE of Hork: XOther~~~
/I./~'T. 60
Bdfloina Permit Info: Describe Work(i.e.. Build Single
Familv ~esidence With Attached Garaael
,
"
,
j,"iSPECTIOIl LIIlE
726- 37 69
.
Job Address IBl!{1iJ ~""N=-C'__ ~~.#r" &s7
Legal De5CriPtion/7"':>=3.2~.:ZE. /9~.'Z~?/~
Owner 1h~L.h?A1-N ~P.6'?Q>..:5S )%/f/.
Address..,. /u ~ / ~ "::<'"~:~
......""'" /y. /"""",~Wk' rS. '.-r~. _ _ '/'1
~~.l> _~7? 9?:z/?
, #
Construction lender
~
~
,~
~,q::--97d""" ~F &"'....<:- S7/~
/Z;;e ?~m Ub'
Address Phone
Ut~lbN ItN1 (name) (address) (lies. no.) (exoiresl
Primary ~V/D h?~o-;".,.^" ?~.. /":Z2Cl::> A( ,1,."'77€.A- ~:. ~~
Structura 1
Electrical
dohone no.')
~..?...?5"'4
2.')."/ I r:s" /:
Mechanical
CONTRACTORS (name) (addrpss) (1;~~. no.) (pxnirps)
General.M~c5l1-'.2/&; ",- -~..-..4?L/"""" C~~.~ Jv. '2~ G..::..&;'~
PlumbinorM4 J?~(' 7?H'c,.4--, 7~~ w: MCPH:>'-'A+'/ &-":;"~:Ji<
Electr;calL.R 1?1<?~~/,<AC" ~W=""/ ,>y''Y..v7(!? D. 5'~/~
." ; -I, ,.. ; _, _ , ~
'1echanic'al ~711tE"7' ~ ~/~ ~,' ~6"" AJh~,.t;:'r ~r
, , .
FFF 1;HARr.L.1IO.-1
Residence of
7.S~ :--- SQ. FT.
~ New circu~ts alts.
or exte~:~onk
~ <>R. b
SERVICES
PLUI1BlNG
ELECTRICAL
JQ.,.
'I
Each single fixture
Relocated building
(new fix. additional)
S.F. Residence
C1 bath \
Duplex (1 bath) each
Additional bath
I=~~.LI:IAR.G..E.. ~In
(ohnn,. no \
~-7'/~9'
r.:R-::i?~/q/~
~7-b~~
7<<&./~2/
MECHANICAL
"""
'u ABliE.
/
furnace/burner to
BTU'
~I/A-c.. /...I""""~
Floo.r furnace
and vent
~-
~
Recessed wa 11
~o~rp hp~tpr ~nrl vpnt
Appliance vent
'ieoaratp
Stationary evap.
cooler
Vent fan wi th
sinole duct
Vent system apart from I
heatino or A.C.
Mechanical exhaust
hnnd and rlurt
~fater service
Temporary Construction
Change in existing
l"P5-jd.fJ1('p
mUltifamily, conm. or
Inrluo;trial
Sewer
Storm Sewer
J
Of ~
/
amps.
::?7.J2
COI*I./IND. FEEDERS
Install/alter/relocate
rli<:trit'L fpp!'iprc:.
Of
Wood stove/heater
,/ 6A"5 P/?/~
:::?--
amps.
~.-
ISSUANCE OF PFRIHT
TOTAL CHARGES 30:'-' TOTAL CHARGES 7"5:"- TOTAL CHARGES ~# /-<;;: pO
WHERE STATE L,'\~ REQUIRES that the Electrical work bo done by an Electrical Contractor. the electrical portion of this permit
shall not be vali~ until the label has been signed by an Electrical Supervisor and returned to the Building Division
I HAVE CAREFUllY EXM1INED the completed application for permit, and do hereby certify that all information hereon is true
and correct. and I further certify that any and all work oerformed shall be done in accordance with the Ordinances of the City
of Springfield and the laws of the State of Oregon pertaining to the work described herein. and that tIC OCCUPAUCY will be made
of any structure without the permission of the Building Division. I further certify that my registration with the Builder's
Board is in full force and effect as required by ons 701.055. that if exempt the basis for exemption is noted hereon. and that
only subcontractors and employees who are in compliance with ORS 7nl.055 wil~used on this~roject.
IlA/-IE(please pr;nt)J..LG"'" U 2~~ SIr.IIATURE. ~, U~ DATE~.4~
FO~ OFFICE USE DIlLY
Sq. Ftg. Itain /;{~ ?"
SQ. Ft~. Access
SQ. Ftg. Other
20ne L:L
Fire Zone
TYDe/Const.~ ~Units
Bedrooms Occy Load
Stories / Occy Groupfi-;Z
Flood Plain
BUILDING PER~1lT
Charges and "'""
Surcharges ~
r!)
Plan Ck. Comm/lnd
65X/Bldo ~pr Fp~
Plan Ck. Res
3D%/Bldo Per Fee
Fence
97-:s~
------------
$/. 6;$
PLUt~BING PERMIT ~GX tn>
Charges and r/' ---~'-.:.--_:--
Surcharges ") I _~O
ELECTRICAL PERrHT L/<: """'"
Charges and \J ____7...-J..
Surcharges, -:2.?>
MECHANICAL PERMIT
Charges and
Surcharges
DfIRlo
Sldowal k
AIC Paving
~
__n/S;_~__
.7S'
Curb Cut
x
x
x
Value #-/~SI'. ao
Value
Value
TOTAL VALUATION
1i!.;pr. //~~. :r:> 6>1!. ..... ~
/...../-::2. Systems Devel~~;-/// .-rd
~ 0/ CharQe (1.5~) ..,~. fa.....
Total Comb. Permit
TOTAL
/9/ ~~
I
I -::z 3'8 27
~
.
.
p
-.
COMBINATION APPLICATIONIPERMIT (CAP)
PERMIT VALIDATIDN
I. Applicant to furnish
A. Job Address
B. Legal Description
1. example. Tax lot 100, lane County Map Reference
'II 03 43
2. exa~le- Lot I. Block 3, 2nd Addition to
spr,ngtield Estates '
C. Name. etc. of owner and construction lender
O. Energy Sources. ..
1. example- heat/electrical ceilinq/or forced air Qas
2. exam~le- waterheaterjelectrical/or solar
E. Square footage or valuation, etc. -
I. examole- 1250 sq. foot house, 500 sq. foot garage
2. example- if new project. cheCK new - if addition,
check add. etc.
F. Building, permit information:
1. example - construct single family house with an
attached garage
2. example - remodel existing garage into family room
3. example - convert single family residence into
restaurant (change of use)
G. Value of work as defined ;n Section 303 (a) of the
Structural Specialty Code
H. DESIGN TEAfl AND CONTRACTORS
To avoid design or construction delays, Building
Division, Staff must be able to contact appropriate
., per:sons regarding design information or job. site
corrections, etc. .
,I!. Abbreviated Plumbing, Mechanical, & Electrical Schedules',
A. Except where blank spaces occur in the description
portion of the Mechanical and Electrical Schedules,
the applicant need fill-in only the No. Boxes adjacent
to the appropriate item(s) to be installed
B. Full Plumbing, Mechanical, and Electrical Schedules
are available at the Building Division
1. To'conserve space on the permit form the schedules
have been abbreviated
2. If the item(s) to be installed are not covered on
the abbreviated schedules you should consult the. '.
full schedules
C. BUILDING DIVISION STAFF WILL FILL OOT ALL FEES AND
CHARGES ON THE SCHEOOLES
D. As noted on the CAP, the label must be delivered to the
electrical contractor for signature by his electrical
supervisor. The general contractor is.not authorized
to sign the electr;cal label. ---
III. Applicant to sign and date
Whenever possible, the initial application will be used as
a worksheet only. Where possible, Building Division Staff
will prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
signature.
IV. Fees and Charges
Plan check fees are due and payable at the time of the
application, and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable when the permit is issued.
,.
1151/ '.
':)-/3 -ft
V. FOR OFFICE OSE ONLY
Permit Clerk
Cc-
.
. PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPANCY:
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information:
" ,
PLANS REVIEWED BY:
name
Lf1J}1?NE 7i (:t!j e?f
signature
~~-~
-/ ,
da te )) "~.. .;;.e.
,
~. .. Required Inspections..
" . .
IT IS THE RESPONSIBILITY OF THE PERtlIT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT THE PROPER TUlE,
THAT EACH ADDRESS IS READABLE FROII TilE STREET, AND THAT TilE PER.'UT CARD IS LOCATED AT THE FRONT OF THE
PROPERTY. BUILDING DIVISION APPROVED PLANS MUST BE ON JOB SITE AT ALL TIllES.
PROCEDURE FOR REQUESTINr. INSPECTIONS: Call 726-3769 (recorder) state you CITY DESIGNATED JOB Nu}IBER.
job address, type of inspection requested and \-lhen you will be ready for the inspection. Contractors
or o~~ers name and phone number. Requests received before 7:00 am will be ~Ade the same day, requests
received after 7:00 am will be ~de the followin~ work day.
Your City Designated Job Number Is: ~8 jI
Job Address: /&$3 ~b,c;.L..-r...-><::, ~~/..H"A-Y z:::~
Owner: A'/I!.LMA/V ~~7/Z~ Phone: ~ //3(;;
Contractor:.M..::..tE#~/E/ .-/Wh:> ~C/_<:.. Phone: ~ $''3-7/<;(:9'
,
,
D
~
[RJ
~
SITE INSPECTION: To be made
after excavation, but prior
to setup of forms.
UNDERSLAB PLUMBING. ELECTRICAL
& !>tECHAJ'HCAL: To be made before
any work is covered.
CONCRETE SLAB INSPECTION: To be
made after all ins lab building
service equipment, conduit, piping,
accessories and other ancillary
equipment items are in place but
before any concrete is poured.
D
FOOTINGS & FOUNDATIONS: To be made
after trenches are excavated and
forms are erected, all steel in
-place, but prior to pouring concrete.
D
UNDERGROUND: Plumbing, Electrical,
Gas, Sanitary Sewer, Storm Sewer,
Water and Drainage lines. To be
made prior to covering or filling
trenches.
o
UNDERFLOCR: . Plumbing, Electrical,
Mechanical. To be made prior to
installation of floor insulation,
decking or floor sheathing.
POST & BEAM: To be made prior to
installation of floor insulation,
decking or floor sheating..
FLOOR INSULATION & VAPOR BARRIERS:
To be made prior to installation
of decking or floor sheating.
MASONRY: Steel location, bond beams
grouting or verticals in accordance
with U.8.C. Section 2415.
o
D
D
D
!KJ
ROOF SHEATHI~G ~~D NAILING:
to installing any roofing.
Prior
o
m
[K]
D
o ATIIC DRAFT STOPS & CURTAIN I'ALLS.
D FIREPLACE: Prior to placing facing
materials and before framing
inspection. C; {~
I ~I INSULATION & VAPOR BARRIER: To be
~ made after all insulation and
required vapor barriers are in place
but before any lath or gypsum board :J
LP interior wall covering is applied.
rvl FRAMING: To be made after the roof, :J
Ll2J all framing, fire blocking and
bracing are in place and all pipes,
chimneys and vents are complete and :J
the rough electrical, plumbing and
heating wires, pipes and ducts are
approved.
D
~
t I
:J
LATH AND/OR GYPSUM BOARD INSPECTION: :J
To be made after all lathing and
g)~sum board, interior and exterior,
is in place but before any Plasterlfl!:J
is applied or before gypsum board
joints and fasteners are taped and
finished.
'SPECIAL INSPECTIONS: In accordance \\'ith
Section 306 of the Building Code a special
inspector shall be employed by the Owner/
Contractor during construction of the
following work. A copy of the special
testing reports shall be furnished to the
Building Division.
STRUCTURAL CO~CRETE:
P.S.I. (306 a.l)
In excess of 3000
FIRE & SEPARATION WALL: Located &
constructed according to plans.
D
o
WOODSTOVES: After installation is
'completed.
SIDEWALK ft DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURB AND APPROACH APRON: After forms
are erected but prior to pouring
concrete.
STRUCTUR~L WELDS: Preformed on the
job. (2722 f)
HIGH STRENGTH BOLTING: During all .
bolt installation and tighting
operations (306 a.5)
SPRAYED ON FIRE~ROOFING:
Standards 43~8)
(U.B.C.
D
PARKING LOT: After gravel
place but prior to placing
or concrete.
is in
aspha 1 t
SPECIAL GRADING,
FILLING: ~~ring
& Chapter 29)
EXCAVATION AND
earthwork. (306 a.ll
::J
GLU-LAM BEA!IS: Inspection Certificate,
by an approved agency, furnished to
the City's Building Division before
beams are placed. (2501-U.B.C. STDS.
25-10,11) .
*In addition to the inspections
specified hereon, the Building
Official ~ay make or require other
inspections of any construction
work to ascertain compliance with
the Building, City or Zoning Codes.
";)Cj
CITY'S SITE PLAN REVIEW BOARD INSPECTION: Must be requested 2 days in advance of the date you
wish inspection. All project conditions such as landscaping, parkinG lot striping etc. must
bu com~leted he fore requesting this inspection.
FINAL PLUMBING
FINAL ELECTRICAL
'9'1
~e:;FINAL !3UILD~NG: ~st be requested after the final Plumbing, Electrical~ ~techanical and Fire
~ Department lnspectlons are made and approved. No Occupancy of the premIses can be made until
. a Certificate of Occupancy has been issued by the Building Division and posted on the premises
FINAL MECHANICAL
?,t')
00 FINAL FIRE DEPARTME~rr
V.l
SICNATURE
DATF
*ALL 'VWHOLES AND CLEANOUTS 'IDST BE ACCESSIBLE, ADJUST>~NT TO BE '~DE AT NO COST TO THE CITY.