Loading...
HomeMy WebLinkAboutPermit Mechanical 1994-6-10 COMMERCIAL/INDUSTRIAL · PERMIT APPLICATION ~ 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK' /if?? / ASSESSORS MAP: /..,....&)"J1.:z.~-<~ , - 7>?c- L OWNER:~frL,(.~~~~LL~/~/ ,,~ ADDRESf" CITY' STATF' . JOB NUMBER ~ 3'./jC> ~ INSPECTION LINE: 726.3769 OFFICE: 726.3759 TAX LOT: ~/'9-c:5 PHONF' ZIP' DESCRIPTION OF WORK' ~ '" . REMODEL -----:;"DDITION ~~ ~~P'::"~~?/~'; -S- I I ' Permit Issuance I TOTAL PERMIT NEW DEMOLISH NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME ADDRESS GENERA' . PLUMBING' MECHANIC" .~'??~~;9--"""~ ELECTRICA' . PLUMBING I I Nn I I I , I I I I NO, FEE CHARGE Single Fixture Relocated Bldg. (new fix. addU) Water Service It. Sanitary Sewer It. It. Storm Sewer Backflow Device TOTAL PERMIT aUAD AREA: . OF BLDGS: OCCY GROUP: . OF STORIES: - OFFICE USE.- ~ ..,;.',~~ LANO USE: . OF UNIT~' CONSTR. TYP~' HEAT SOURCF' sa. FT. $/SO. FT. sa. FTG MAl N so. FTG ACCESS x x sa. FTG OTH ER x PLAN CHECK FEF RCPT' DATE I BUILDING PERMIT 5% State Surcha~e MECH~/ 15%Slate -4 Surcharae I PAVING PLUMBING 5% Slate SurcharQe /&7 ',- - I FENCE L~..-.:? VALUE $ : ill SIOEWALK I CURBCUT FT. FT. OTHER VALUE: PHONE CONST. CO NT RACTO R . EXPIRES PHONE MECHANICAL I I I ~~~ <"'1ARGE- Furnace/burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart Irom AC or htg. MeChanical exhaust hood and duct $10.00 A /$, /5'~. , HANDICAP ACCESS: FLOOD PLAIN' ZONING' LIGHTING POWER BUDGET: WATER HEATER' VALUE TOTAL VALUE OF PROJECT _ BY DEMOLITION SUBTOTAL PERM ITS SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUOING ELECTRICAl 76::?o . . REQUIRED INSPECTIONS It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726'3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECfION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. j- ROUGH PLUMBING, ELEgRJCAL & ("!t!ECHANIC.<t1;;>No work Is to be covered lmtil these inspections have been made and approv~d. PAVING: After gravel Is In place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steei In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. SPECIAL INSPECfIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS STRUCfURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, pi ping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. STRUCfURAL WELDS: Performed on the job. (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor InsulatIon, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board Interior wall covering is applied. "f'~ '1='1i'le'& SEPARATION WALL: Located and constructed accordipg to plans. HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B.C. Standards 43.8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS.25.10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. STRUCfURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material In place. 'In addition to the Inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof coverl ng. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. ------------------------------------------------------- FINAL PLUMBING FINAL ELECfRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. Y FINAL MECHANICAL FINAL BUILDING: Requested afler the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY DATF By signature, I state and agree, that I have carefUlly examined the completed application and do hereby certify that all Information heretn Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In'compllance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Slgnaturp &~~~; ~_ Date~/~Y VALIDATION: AMOUNT RECEIVED: RECEIPT N' .---,,,c . -::,z:. !~""?qr DATE PAlO: RECEIVED BY: &;:-/e;>-"5.",...- /2'~~ ~