HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2010-1-7 ----.... \ '-- ~fEl / Page 1 of 1 Geotechnical & ConslrucIion Servioos Daily Field Report 11~'IJHCI;4Ifltr.' ~1I1l11~1IU.L!I Client: Project: L TO Fleet Building Remodel Expansion 3500 E. 17'h Ave. Eugene, Oregon Date: Project No.: Report No,: Inspector: 10 No.: Mr Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 01-07-10 2097153 E-24922 D. Delatte 1080867-88 ICC BP No.: COM 2009-1164 Continuous Inspection: 0 Inspection of: Reinforced Concretel Epoxy Dowels Contractor: Fortis Construction Weather: Overcast Periodic Inspection: 0 Performed final inspection on the reinforcing steel for wash building trenchlslab and sump pit walls, line 2.A to 2:B, b!"tw!"en 2.1 and 2:4. "Preliminary reinforcing steel inspection was performed byou'r office on 12-16-09 (ref: FEI'report E-24787). Observed the placement of 30.75 yards of Knife River 4000 psi concrete (mix 240NE5200) into areas noted above. Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of five (5) 4" x 8" concrete test cylinders from load 1. Slump - 41/2"; air temperature - 35F; concrete temperature - 51 F. Also, observed the installation,of two (2) #7and three,(3) #5 horizontal dowels into existing footing for new footirig-'connection near 2A12.3. Prior to instaliation, the predrilled holes were cleaned with "ii-brush and compressed air Verified minimum embedment depth of 7" for #7 dowels' and 5" for #5 dowels. Dowels were secured with Hilti Hit RE 500SD epoxy adhesive '(ICC - ESR 2322/ expiration date 09/2010). To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: (h.'1.14 ~ Michael L. ~eyr Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em ail) FortisConstruction - Conan Doherty (em ail) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield.", . ,,-.., .::..-:.... ' MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and p"ertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FE1 Testing & Inspection, Inc.'s written authorization. 750 t>NV O:lmell Avenue' CorvaJlis, 0rega197330 . phone (541) 757-4698, fax (541) 757-2991 29540 B I\jrport Road . Eugene, 0rega197402 . phone (541) lJ84.J849 . fax (541) 684J851 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 3824846 ./ SfEl 11~,,,,,,,,,,,,m'lil"iUillI Geotechnical & Con.<;1nJdion SenAces Compressive Strength of Concrete (ASTM C 39) . CLIENT Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 PROJECT L TO Fleet Building Remodel Expansion 3500 E. 17th Ave. Eugene, Oregon COM 2009-1164 DATE PROJECT NO. REPORT NO. 01-11-10 2097153 6824 BPNO. DATE CAST 01-04-10 CAST BY 0, Delatte DATE RECEIVED 01-05-10 STRENGTH REQUIRED 4000 psi {;/1 /' tit, '1 SPECIMEN SIZE 4" x 8" STRENGTH PLACED 4000 psi SACKS SUPPLIER Knife River PRODUCT CODE 2440NE5200 CEMENT MAX SIZE AGG. 3/4" ADDITIVES 1 % accelerator AIR CONTENT LOAD NO. 1 TICKET NO. 3461587 SLUMP 33/4" CONCRETE TEMP 54" F YARDAGE 10.75 OF 31.50 TIME 8:05 AM . AIR TEMP 45" F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 POUR LOCATION Slab on grade line A to 0.2, from 18.5 to 19 and on line D.2 to D.4, from 17 to 19. LOAD 1 SAMPLED Near B18.7. TEST DATE 01-11-10 01-18-10 02-01-10 02-01-10 Hold AGE (DAYSl 7 14 28 28 AREA (IN.'l 12.56 WEIGHT (LBSl 8.65 TOTAL LOAD (LBS) 65495 COM PRESSIVE STRENGTH (PSI) 5210 AVERAGE STRENGTH (PSIl TIME OF TEST 8:25 AM TYPE OF FRACTURE" 5 "1- End Cones 2 -Cone/Split 3. Columnar 4-Diagonal 5- Side (lop or bottom) 6-Side (pointed top or bottom) I I REMARKS: Bill Henderson (McKenzie Commercial) was advised of on'site test results. Reviewed By: /h . '-;(.Ik..t. - Michael L. Meyr Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc "This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall.not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written"authorization. 750 r-NV ComellAvenue. Corvallis, Oregon 97330, phone (541) 757-4698. fax (541) 757-2991 29540 B Airport Road . Eugene, Oregon 97402. phone (541) 684-3849 . fax (541)684-3851 62979 NE Plateau Drive, Suite 3. Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 SfEI 1I~'IIN~;4h\lio'~l"lIm.~ Geotecrmrnl & O:lnstnJdion Servic'Es. Compressive Strength of Concrete (ASTM C 39\ Mr. Joe McCormack Lane Transit.District PO Box 7070 Eugene, Oregon 97401 CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 3 SAMPLED TEST DATE 01-04-10 01-11-10 01-25-10 01-25-10 Hold AGE (DAYS) 7 14 28 28 DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG. AIR CONTENT 3 TICKET NO. 3501648. SLUMP 41/2" 480 F YARDAGE 10.0 OF 30.0 TIME 8:30 AM 330 F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 Slab on grade line A to C, from 18 to 18.5 and line C to D.5, from 17 to 18.2. Stem wall along line 19, (rom D.4 to C and D.4, from 17 to 17.9. Slab on grade near 18C.5. PROJECT L TD Fleet Building Remodel Expansion 3500 E. 17th Ave. Eugene, Oregon COM 2009-1164 DATE PROJECT NO. REPORT NO. BP NO. 12-28-09 4000 psi 4000 psi 2440NE5200 CAST BY D. Delatte & q &"'- - II SACKS CEMENT ,AREA (IN.') 12.56 12.56 WEIGHT (LBS) 8.70 8.70 TOTAL LOAD (LBS) 68065 82440 COMPRESSIVE STRENGTH (PSn 5420 6560 AVERAGE STRENGTH (PSn TIME OF TEST 8:00 AM 8:20 AM REMARKS: Bill Henderson (McKenzie Commercial) was advised of on-site test results. .. 1- End Cones 2 _ Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top or bottom) 6 - Side (pointed top or bottom) Reviewed By: /h, fi'./k-- Michael L. ~eye{l Technical Manager 01-11-10 2097153 6816 12,29-09 4" x8" Knife River 3/4" TYPE OF FRACTURE" 5 3 i5)~~~D~~1 ~ - JAN 1 3 2010 c: Fortis Construclion - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction ~ Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) 'Pivot Architecture - John Stapleton (email) Hotibach-Lewin - Vikki Bourcier (email) , Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc .::/ This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc,'s written authorization. 750 NW Comell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698 'fax(541) 757-2991 29540 BAirport Road, Eugene, Oregon 97402' phone (541) 684-3849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4644 . fax (541) 382-4646 ,/ A~""~ ~rtl Page 1 of 1 1I~'II~II'l;41I~I.'W;.llm.I~I. Geotoomical & Construction Servires Daily Field Report Client: Mr. Joe McCormack Project: L TD Fleet Building Date: 01-05-10 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17'h Ave.' Report No.: E-24903 Eugene, Oregon 97401 Eugene, Oregon Inspector: D. Delatte 10 No.: . 1080867-84 ICC Inspection of: Masonryl Epoxy Dowels Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BP No.: COM 2009-1164 Periodic Inspection: 0 Performed inspection on the reinforcing steel in CMU walls as follows: 8" CMU infill for old door at the wash building near 2.29.(slabto one course below top of wall, contractor to slug top course with mortar); 8" CMUwall'on line 17, from AA to A.T(slab tei 10'8"); IineA7, from 17 to 18 (10' to top); door infill header near 17,5A.9. Wall on line 17 had clean-outs provided. Reinforcing steel was checked for grade, size,lap, placement, quantities and clearance, 'where applicable. Reinforced cells were relatively clean and free of excessive mortar projections. Observed the placement of 3.5 yards of Knife River 7sk grout (mix 247KG3R200) into walls noted above. Grout was placed by pump and was mechanically consolidated. Walls were grouted solid. Slump - :t9"; air temperature - 62F; grout temperature - 60F. Also, observed .the installation of rebar dowels as follows: four (4) #4 x 32" horizontal dowels 'into CMU wall near 17AA at upper two (2) bond beam locations; ten (10) #4 x 4'10" dowels into concrete column near C19, two (2) at each bond beam location, Prior to installation, the predrilled holes were cleaned with a brush and compressed air Verified minimum embedment depth of 4" for bars into CMU and contractor drilled 10" into concrete column. No detail available'for connection at column. Dowels were secured with Hilti Hit Hy 150 Max epoxy (ICC - ESR 2262/ expiralion date 08/2010) at CMU connection and Hilti Hit RE 500SD epoxy (ICC ESR 23221 expiration date 09/2010) at column connection. To the best of our knowledge, the work inspected was in accordance with plans dated 09-30- 09, RFI 88R and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: (J1. ~.11uy- Michael L. Meyer Technical Manager c: Fortis Construction"': Kean Rager (email) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (em ail) Fortis Construction - Aaron Thorpe (email) Pivot Architecture"': John Stapleton (em ail) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorization. 7ffJ WV Com€JIAvenue' Cavallis, Oregon 97330, phone (541) 757-4698 'fax(541)757-2991 29540 B Airport Road . Eugene, Oregon 97402. phone (541) 68<h'3849 . fax (541) 684J851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 Sf;) '11~,""..:~",mtl"".lll1 GeoIEchnical & Cons1rudion Services /' Page 1 of 1 . Report of Inspection Services Welding/High-Strength Bolting Client: Mr. Joe McCormack Lane Transil District PO Box 7070 Eugene, Oregon 97401 L TD Fleet Building Remodel Expansion 3500 E. 17th Ave. Eugene, Oregon Date: Project No.: Report No.: Inspector: ID No.: Project: Inspection of: Fabricator or Erector: Contractor: . Welding Metalsome Fabrication Fortis Conslruction Shop: Ii'! Weather: BP No.: 12-23"09 2097153 E-24865 C. Walpole 01040131 AWS CWI Field: 0 Inside COM 2009-1164 Performed visual inspection of the followingfagricated structural steel columns: 7A, 7B, 7C, 7CR, 7D and 7E. Completed welds were checked fqr si"e, length, profile and location. Metalsome Fabrication representative was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked is in conformance with shop drawings dated 12-02-09 and applicable AWS D1.1 code, except if noted above. Reva: U1~ Jv- Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (emaH) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - VikkiBourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield D1[g(g[gO~[g - JAN - 4 2010 MLM:sc ~ ..::/ This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization. 750 NW Cornell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 B Airport Road' Eugene, Oregon 97402 . phone (541) 684-J849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ../ ~Ft' Page 1 of 1 .11r..'II~ICf;4lI~.":i:'IIIII~_ Geotechnical & Conslrudion Sef\lires Daily Field Report Client: Mr. Joe McCormack Project: L TO Fleet Building Date: 12-28-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17th Ave. Report No.: E-24867 Eugene, Oregon 97401 Eugene, Oregon Inspector: D. Delatte IDNo.: 1080867-88 ICC Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BPNo.: COM 2009-1164 Periodic Inspection: 0 Performed inspection on the reinforcing steel for slab on grade line A to C, from 18 to 18,5 and line C to 0.2, from 17 to'18,2; stem wall under.CMU wall line 19, from 0.4 to C and line 0.4, from 17 to 17.9. Reinforcing steel was-checked for grade, size, lap, placement, quantities and. clearance. Reinforcing steel was secured and supported above grade. Observed the placement of 30.0 yards of Knife River 4000'psi (mix 2440NE5200) into areas noted above. Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of five (5) 4' x 8" concrete test cylinders from load 2. Slump - 41/2"; air temperature - 33F; concrete temperature - 48F. Bill Henderson (McKenzie Commercial) was advised of the on-site test results. To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09 and applicable workmanship provisions of the I.B.C., except if noted above. ;::~ Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) BalzhiserHubbard Engineers - Janet Spriggs (email) City of Springfield 1))~~~D~~, 1 JAN.:. 4 2010 . .~ )/ MLM:sc This report and/or enclosed tesl data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be aisclosed without FEt Testing & Inspection, Inc.'s written authoriza.tion. 750 rm Cornell Avenue' Cavallis, Oregon 973::IJ . phone (541) 757-4698 . fax (541) 757-2991 29540 BAirportRood' Eugene, Oregon 97402 . phooe(541)684-3849' fax(541)684J851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701. phone (541) 382-4844 . fax (541) 382-4846 ./ ~..p. ~yrt~ Page 1 of 1 11:"'ltnri;~U.'~;'IIII~i1m. Geoted1nical & Cons1ruc:fun Services Daily Field Report Client: Mr. Joe McCormack Project: L TD FleetBuilding Date: 12-23-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17'" Ave. Report No.: E-24859 Eugene, Oregon 97401 Eugene,Oregon Inspector: D. Delatte ID.No.: 1080867-88 ICC Inspection of: Epoxy Dowels Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BPNo.: COM 2009"1164 Periodic Inspection: 0 Performed continuous inspection during the installation of ten (10) #4 x 30" horizontal dowels. into CMU walls and concrete. curbs, four (4) near.line,2.C and six (6) near line 2.0 at door infill at the wash building.' Prior to installation, -the predrilled holes were cleaned with. compressed air ":lnd a .brush. Verified minimyl'1. embedment depth of 4". . Dowels were secured with Hilti tiit HE 500SD epoxy adhesive (ICC - ESR 2322/ expiration date 07/2010) for concrete dowels and Hilti Hy 150 Max epoxy adhesive (ICC - ESR 2262/ expiration date 06/2010jforCMU walls. To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09 and applicable workmanship provisions of the LB.C., except if noted above. Reviewed By: .// ~~ f1/~--~ fdr Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em all) Fortis Construction - Conan Doherty (emall) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (em ail) City of Springfield o ~~~O~~-=c JAN - 4 2010 J MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc,'s written authorization. 7ffJ t>MI CanelI Avenue' CorvaIUs, CXegon 97330 . phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road. Eugene, CXegon 97402, phone (541) 684-3849' fax (541 )684-J851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 'phone(541)382-4844' fax (541) 382-4846 / ~ftl Page 1 of 1 11:"'lliltl;'I~),'~l'llll~tu.1I Geo1echnical & Construction Services Daily Field Report . Client: Mr. Joe McCormack Project: L TO Fleet Building Date: 12-21-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17'h Ave. Report No.: E-24863 Eugene, Oregon 97401 Eugene, Oregon Inspector: C. Walpole ID No.: 5114210-83 ICC Inspection of: Epoxy Anchors Weather: Inside Continuous Inspection: 0 Contractor: Fortis Construction BPNo.: COM 2009-1164 Periodic Inspection: 0 Witnessed the installation of eleven (11) 3/4" x 8" epoxy anchored all-thread for door' opening support .columns at lines. A5/18 at the ,locations' where the wrong wedge anchors were. used. Predrilled holes were cleaned with a nylon brush and compressed air. Verified minimum embedmentdepth of 5". Anchors were installed with Hilti Hit Hy 150 MAX (ICC - ESR 1967 and 2262/ expiration date 07/2010). Anchors installed are pending engineer's response to RFI1 03 prior to final acceptance. To the best of our knowledge, the work inspected was in accordance with drawings dated 09-30-09 and applicable workmanship provisions of the I.B.C., except as noted above. Reviewed15~ f1J#t .(;.r Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (emaii) Balzhiser Hubbard Engineers - Janet Spriggs (emaH) City of Springfield \ [j)~(g~aw~~ r. JAN - 42010 JI MLM:sc 'L - This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Ine.'s written.authonzation. 750 t#V CanelI Avenue' eorvanis, 0rega197330' phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road. Eugene, O"egon 97402 . phme(541)684-J849' fax (541) fl84.J851 62979 NE Plateau Drive, Suite 3' Bend, Oregon 97701 ' phone (541) 382-4844' fax (541) 382-4846 /' . ~fEl "'""''','''''''''"lII'.''ll!l Geotechnical & Construction Services Page 1 of 1 Report of Inspection Services Weldino/Hioh-Strength Bolting Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 Project: L TO Fleet Building Remodel Expansion 3500 E. 17'h Ave. Eugene, Oregon Date: Project No.: Report No.: Inspector: ID No,: Inspection of: Fabricator or Erector: Contractor: Welding Metalsome Fortis Construction Shop: Ii1I Weather: BP No.: 12-22-09 2097153 E-24856 . C. Walpole 01040131 AWS CWI Field: 0 Inside COM 2009-1164 Performed visual inspection of the following fabric!lted structural steel components: beams - 3C, 3D, 3E, 4A (3 pieces).and 4B'(2 pieces); columns': 3A, 3AR, 3B (2 pieces) and 3BR (2 pieces). Completed welds were checked Jar size, length, profile and location. Metalsome representative was asked to notify our office when additionai services are needed. To the best of our knowledge, the work checked is in conformance with shop drawings dated 12-01-09 and applicable AWS 01'.1 code, except if noted above. R~~~ Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Archilecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield D~@~a~~~ JAN - 4 2010 MLM:sc .:!J This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. f::.s such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NW Comell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BPJrport Road. Eugene, Oregon 97402. phone (541)684-3849' fax (541)684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 382-4644. fax (541) 382-4846 ~FEI ".'"11,*"'''''''''''''.'''. Geotechnical & Construction Services '/ Page 1 of 1 Report of Inspection Services Welding/High-Strength Boltiny'" Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 Project: L TD Fleet Building Remodel Expansion 3500 E. 17'h Ave. Eugene, Oregon Date: Project No,: Report No.: Inspector: 10 No.: Inspection of: Fabricator or Erector: Contractor: Welding Metalsome Fortis Construction 6A./llf1 Shop: 0 Weather: BPNo.: 12-21-09 2097153 E-24855 C. Walpole 01040131 AWS CWI Field: 0 Inside COM2009-1164 Performed visual inspection of angle clip to ~'x 4" columns per 9/S502 at the door opening near A,5/18. Completed welds were checked for size, length, profile and location. Justin (Metalsome) was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked is in conformance with drawings dated 09-30-09 and applicable AWS D1.1 code, except if noted above, Reviewed By: ~M/~~ Michael L. Meyer Technical Manager c: Fortis Conslruction -Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (emaii) Fortis Construction - Aaron Thorpe (em ail) Pivot Architecture - John Stapleton (email) . Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc rn~~~D~~~ - JAN - 4 2010 j) This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part . thereof be disclosed without FEI"Testing & Inspection, Inc.'s written authorization. 750 NW Cornell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698: fax (541)757-2991 29540 B Airport Road . Eugene, Oregon 97402 - phone (541)684-3849' tax (541) 684-3851 62979 NE Plateau Drive, Suite 3 - Bend, Oregon 97701 . phone (541) 382-4644. fax (541)382-4646 ~ftl I 11~'mll'i;.h\"'W;lllmi!ll~I" Geoted1nir:81 & Constn ldion ServicEs. Compressive Strength of Concrete 'ASTM C 39\ CLIENT Mr. Joe McCormack PROJECT L TD Fleet Building DATE 12-31-09 Lane Transit District Remodel Expansion PROJECT NO. 2097153 PO Box 7070 3500 E, 17th Ave. REPORT NO. 6786 EUgene, Oregon 97401 Eugene, Oregon BPNO, COM 2009-1164 DATE CAST 12-03-09 CAST BY M. Meyer DATE RECEIVED 12-04-09 STRENGTH REQUIRED 3000 psi SPECIMEN SIZE 4" x 8" STRENGTH PLACED 3000 psi SACKS SUPPLIER Knife River PRODUCT CODE 2430NE7200 CEMENT MAX SIZE AGG. 3/4" ADDITIVES AEA AIR CONTENT LOAD NO. 1 TICKET NO. 3501346 SLUMP 23/4" CONCRETE TEMP 560 F YARDAGE 2,5 OF 2.5 TIME 1:15 PM AIR TEMP 410 F WEATHER Clear SPECIMEN STORAGE ASTM C 31 POUR LOCATION Wash building continuous footing and stem wall on line 2.B, from line 2.3 to 2.3 + 12'. AVERAGE TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYS) (IN.') (LBS) LOAD (LBS) STRENGTH (PSI) (PSI) TEST FRACTURE- 12-10'09 I 7 12.56 8.54 43530 3470 8:10AM 5 12-31-09 I 28 12.56 8,52 62230 4950 8:20 AM 3 12-31-09 I 28 12.56 8.54 59335 4720 4835 8:25 AM 3 Hold ..,- End Cones 2-Cone/Split 3-Columnar. 4-Diagonal 5-Side (top or bottom) 6-Side (pointed top orbollom) REMARKS: Bill Henderson (McKenzie Commercial) was advised of on-site testresults. R;;::~ ~ Michael L. Meyer I<r-- Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (em ail) City of Springfield o ~~~O~~ JAN - 4 2010 .3 MLM:sc This report and/of enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization. 750 t-NV Cornell Avenue' Corvallis, Oregon 97330. phone (541) 757-4698, fax (541)757-2991 29540 B Airport Road, Eugene, Oregon 97402 . phone (541) 684-3849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3' Bend, Oregon 97701 . phone (541) 382-4844. fax (541) 382-4846 .J ~ftJ Page 1 of 1 11a.'UHrt:"II.' :l;aIlII~1W!I Geotechnical & O:lnstruclion Servioos Daily Field Report Client: Mr. Joe McCormack Project: L TD Fleet Building Date: 12-30-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E, 17'" Ave, Report No.: . E-24889 Eugene, Oregon 97401 Eugene, Oregon Inspector: D. Delatte I ID No.: 1080867-88 ICC Inspection of: Epoxy Dowels Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BP No.: COM 2009-1164 Periodic Inspection: iii Performed continuous inspection durin9 the installation of #4, #5 and #6 rebar dowels into slab on gradelfooting and CMU walls as follows: thirty-five (35) #4 x 30" horizontal dowels into existing CMU walls,'Iwelvenear 17AA and 17A.7, eleven (11) near 2.3/2.B; twelve (12L #5 x 48"verticaldowels'into slab on grade along line 17 beIween'AA and A.9;'five (5) #6 vertical dowels into slab on gradel footing and five (5) #6 vertical dowels into CMU, all the #6 bars are'at th'e' door infill near 2.3/C.2. Prior to installation, the predrilled holes were cleaned 'with 'compressed air and a brush, Verified minimum embedment depth of 4" for #4 bars, 5" for #5 bars and 20" for #6 bar into slab and 6" into CMU header. Dowels were secured with Hilti Hy 150 Max epoxy adhesive (ICC- ESR 2262/ expiration date 06/2010) into CMU and Hilti Hit RE 500SD epoxy adhesive (ICC": ESR 2322/ expiration date 10/2010) into concrete areas. To the best of our knowledge; the work inspected was in accordance with plans dated 09-30-09 and applicable workmanship provisions of theLB.C" except if noted above. R;;;;;:/rJu*_ Michael L. Meyer tOr- , Technical. Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (em ail) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield o ~(g~n~~~ JAN - 4 2010 ~ MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process a:nd/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7fIJ rwJ Cornell Avenue' Cavallis, Oregon 97330, phone (541 ) 757-4698' fax (541) 757-2991 29540 B Airpat Road ' Eugene, Oegon 97402 ' phone (541) 684-3849 . fax (541) 684J851 62979 NE Plateau Drive, Suite 3' Bend, Oregon 97701. phone (541)382-4844' fax (541) 382-4846 ~~..... '~rtl ,I' .1~'llIllfl;.I~~'~~'IlIJ1U11 GeotBrrmicql & Constn riion ~ Compressive Strength of Concrete (ASTM C 39) CLIENT Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 PROJECT BP NO. L TD Fleet Building Remodel Expansion ~5qO E. 17.1h Ave.' Eugene, Oregon COM 2009-1164 DATE PROJECT NO. REPORT NO. DATE CAST STRENGTH REQUIRED( STRENGTH .PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION 12-16-09 CAST BY D. Delatte DATE RECEIVED 30QO psi SPECIMEN SIZE 3000'psi SACKS SUPPLIER 2430NE7200 CEMENT MAX SIZE AGG. AEA AIR CONTENT 1 TICKET NO. 3501437 SLUMP 600 F YARDAGE 6,5 OF 6.5 TIME 520 F' WEATHER Overcast SPECIMEN STORAGE Continuous footing' along line D.4, from 17 to 19 and line 19, from D.4 to C. 12-30-09 2097153 6799 12-17-09 4" x8" Knife River 3/4" 4.0% 4" 11:45 AM ASTM C 31 AVERAGE TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYS) (IN.') (LBS) LOAD (LBSI STRENGTH (PSI) (PSI) TEST FRACTURE" I 12-23-09 7 12.56 8.33 50795 4040 1:50 PM 2 I 12-30-09 14 12.56 8.37 67090 5340 8:10AM 2 I 01-13-10 28 I 01-13-10 28 I Hold .*1- End Cones 2 - Cone/Split 3 -Columnar 4-Diagonal 5- Side (top or bottom) 6- Side (pointed top orbotlom) R.EMARKS: Bill Henderson (McKenzie Commercial) was advised of on-site test results. Reviewed By: h ~'i;. .-~ fcv-- Michael L. Meyer Technical Manager o ~~~D~~F-:i - JAN - 4 aJW ~ ::::/ ; c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (smail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM;sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and Pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part orfull and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NW Comell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698. fax (541)757-2991 29540 BAirport Road. Eugene, Oregon 97402. phone (541) 684-3849 . fax (541) 684-J851 7" . 'jgq. RPnrl Oreoon 97701 . phone (541) 382-4844 'fax(541) 382-4846 ,f.ll. . ~fEl 11~'lmrt;.II~'~;tllm.m. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED , ;'TEST DATE 01-14-10 01-21-10 02-04-10 02-01-10 Hold AGE, (DAYS) ,-7 14 28 28 / Geotemnirnl & eon,,;trlJdion Serviffis Compressive Strength of Concrete lASTM C 39\ PROJECT L TD Fleet Building Remodel Expansion 3500 E.17" Ave. Eugene, Oregon DATE PROJECT NO. REPORT NO. Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 BPNO. COM 2009-1164 DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG. AIR CONTENT 1 TICKET NO. 3461599 SLUMP 510 F YARDAGE 10.75 OF 30.75 TIME 350 F WEATHER Overcast SPECIMEN STORAGE . Wash bu'ilding trenchlslab and sump pit walls, line 2.A to 2.B, between 2,1 and 2.4. 01-07-10 4000 psi 4000 psi 2440NE5200 'CAST BY D. Delatte SACKS CEMENT Near 2.1/2A. AREA (IN.'l 12.56 COMPRESSIVE STRENGTH (PSIl 5210 AVERAGE STRENGTH (PSI) TIME OF TEST 2:00 PM WEIGHT (LBS) 8.69 TOTAL LOAD (LBS) 65390 .. 1- End Cones 2 ~ Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (lop Of bottom) 6 - Side (polnled lop or bottom) REMARKS: Bill Henderson (McKenzie Commercial) was advised 01 on-site test results. Reviewed By: /lJ. '"t;.;Au,_ Michael L. Meyf Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction -' Aaron Thorpe (email) , Pivot Architecture, -.John Stapleton (email) , Hohbach-Lewin - Vikki Bourcier (email) , Balzhiser Hubbard Engineers - Janel Spriggs (email) , City 01 Springfield MLM:sc l 01-14-10 2097153 6830 01-08-10 4" x8" Knile River 3/4" 41/2" 7:55 AM ASTM C 31 TYPE OF FRACTURE- 5 ~ (("; rs nl I\,Ii rc:: r:-\-I ''', l .\V; I ~:C"; !("l , C " .-/' This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not.be reproduced in part or full andfor any part thereof be disclosed without FEI Testing & Inspection, Ine.'s written authorization. 750 NW Cornell Avenue. Corvallis, Oregon 97330. phone (541) 757-4698, lax (541) 757-2991 29540 B Airport Road . Eugene. Oregon 97402. phone (541)684-3849' lax (541) 684-3851 62979 NE Plateau Drive, Suite 3' Bend, Oregon 97701. phone (541)382-4844' lax (541) 382-4646 -I ~....... ~')rtt~ Page 1 of 1 11:r.'II/lrJ;"I/~'~~'IIII~..I~lt:l Geoted1nical & Construction Services Daily Field Report Client: Mr. Joe McCormack Project: L TD Fleet Building Date: 01-14-10 Lane Trans.it District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17'" Ave. Report No.: E-24977 Eugene, Oregon 97401 Eugene, Oregon Inspector: D. Delatte 10 No.: 1080867-88 II ICC Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BPNo.; COM 2009-1164 Periodic Inspection: iii Performed inspection on the reinforcing steel for stem wall at the wash building on line 2.A, from 2.3 to 2.4 and remaining wall along line 2.B, between 2.3 to 2.4. Reinforcing steel was -ch~'cked for grade,' size, lap, placement, quantities 'and clearance. Reinforcing steel was secured. Observed the placement of 3.5 yards of Knife River 3000 psi concrete (mix 2430NE7200) into walls noted above. Concrete was placed directly from truck and was mechanically consolidated. Cast one (1) set of five (5) 4" x 8" concrete test cylinders. Slump - 3 3/4"; air temperature - 58F; concrete temperature - 55F; air content - 4.7%. Bill Henderson (McKenzie Commercial) was adVised of the on-site test results. To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: /11.1.14-- Michael L'Me/l,r Technical Manager "W~@~u~~~ ri JAN 2 0 aJ~ JL c: Fortis Construction - Kean Rager (em ail) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield ~ MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or m~teria] evaluated. As such, information contained herein shall natbe reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 t#V ComeII Avenue' CoIvallis, Oregon 97330, phone (541) 757-4698. fax (541) 757.2991 29540 BAirp:xt Road, Eugene, Q-egon 97402. phme(541)684J849. fax (541 )684J851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 / A.l.~. r"~l "'y .- .. . .. 1I~'IINrt;.I~..'~~.IlII~.m. Geotedlnirnl &- Consln Jdion Services Compressive Strength of Concrete (ASTM C 39\ CLIENT Mr. Joe McCormack PROJECT L TD Fleet Building DATE 01-13-10 Lane Transit District Remodel Expansion PROJECT NO. 2097153 PO Box 7070 3500 E. 17th Ave. REPORT NO. 6799 Eugene, Oregon 97401 Eugene, Oregon BPNO. COM 2009-1164 DATE CAST 12-16-09 CAST BY D. Delatte DATE RECEIVED 12-17-09 STRENGTH REQUIRED '3000 psi e-q,l( b C{ SPECIMEN SIZE 4" x 8" STRENGTH PLACED . 3000 psi SACKS SUPPLIER Knife River PRODUCT CODE 2430NE7200 CEMENT MAX SIZE AGG. 314" ADDITIVES AEA AIR CONTENT 4.0% LOAD NO. 1 TICKET NO. 3501437 SLUMP 4" CONCRETE TEMP 600 F YARDAGE 6,5 OF 6.5 TIME 11:45AM AIR TEMP 520 F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 POUR LOCATION Continuous footing along line D.4, from 17 to 19 and line 19, from D.4 to C. TEST AGE AREA WEIGHT TOTAL COMPRESSIVE DATE (DAYS) (IN.') (LBS) LOAD (LBS) STRENGTH (PSI) 12-23-09 7 12.56 8.33 50795 4040 12-30-09 14 12.56 8.37 67090 5340 01-13-10 28 12.56 8.37 67890 5410 01-13-10 28 12.56 8.40 68260 5430 Hold AVERAGE STRENGTH (PSI) 5420 TIME OF TEST 1:50 PM 8:10AM 9:35 AM 9:40 AM TYPE OF FRACTURE~ 2 2 3 3 "1, End Cones 2 _ Cone/Split 3 - Columnar 4 - DiagonalS-Side (top orboltom) 6 -Side (pointed top or bottom) REMARKS: Bill Henderson (McKenzie Commercial) was advised of on-site test results. Reviewed By: ;1J. 1. f)...., ----- Michaei L. ~ey/ Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) . Pivot Architecture -John Stapleton (em ail) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City 6f Springfield MLM:sc. t5)~CE;rgQ~~ ' r JAN 2 0 2010 " J This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without.FEI Testing & Inspection, lnc.'s written authorization. 750 NW Comeil Avenue' Corvallis, Oregon 97330. phone (541) 757-4698, fax (541) 75702991 29540 BAirport Road' Eugene, Oregon 97402' phone (541) 684-3849. fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4844 ' fax (541) 382-4846 / ~ftl Page 1 of 1 .1~'IIHet;'I~.'~~IIIII~_ GeotechniG31 & Construcfun Services Daily Field Report Client: Mr. Joe McCormack Project: L TO Fleet Building Date: 01-12-10 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 35.00 E. "17'" Ave, Report No.: E-24954 , Eugene, Oregon 97401 ELigene:Oregon Inspector: D. Delatte ., , ID No.: 1 080867-88 ICC Inspection of: Reinforced Concrete Weather: Ove!ocast "" Continuous Inspection: 0 Contractor: Fortis Construction BP No~: COM 2009-1164 Periodic Inspection: It'! Performed inspection on thereinforcing,steel foi continuousJootingwith pad footing at .' .. . ' . '''-.- <,," .... .-'. .~, ",'., ....' . t . '; ',' ." 'Ii ...' . -- - ".. . the wash'buildingon .line 2:Aj"from'2'3Ho .2'4' and;re'iliairiiiig'footing along line2.B, between 23-to 2.4" Heinfoieing'steel\Vas 'c_hecked' ioi glade, -size, lap,piacer{;ent, quantities and,Ciearilnce: . Reinforcing ,steel was'secured and supported above grade. Anchor bolts fo'r-colLimn iNeje'Jcl'{~cked'for size, embed depth and were placed in templates. Observed the placement of 5.0 yards of Knife River 3000 psi concrete (mix 2430NE7200) into footing noted above. Concrete was placed directly from truck and was mechanically consolidated. Cast one (1) set of five (5) 4" x 8" concrete test cylinders, Slump - 3"; air temperature - 57F; concrete temperature - 55F; 'air content - 5.4%. Bill Henderson (McKenzie Commercial) was advised of the on-site test results. "To the best of our kno,wledge, the work inspected was in acc:ordance with plans dated 09-30-09 and applicable workmanship provisions of the I.B.C" except if noted above, Reviewed By: A,,(.~ Michael L. Meyer Technical Manager ~~~~O\ff~ ~ JA:.I 20 2010 c: Fortis Construction - Kean Rager (em ail) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers C' Janet Spriggs (email) City of Springfield MLM:sc li , _I This report andfo~ enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authoriZation. 7~ NI/IJ Canell Avenue' COIvaIis, Oregon 97330, phone (541 ) 757-4698, fax (541) 757-2991 29540 BAirport Road, Eugene, Oregon 97402, phone (541)684-3849' fax (541 )684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701' phone (541)382-4844' fax (541) 382-4846 ~ftl Page 1 of 1 I 11:"'lltlN~l!Ih'lro'~Ulllh'U!I Geotechnical & Construction SeNioes Daily Field Report Client: Mr. Joe McCormack , Lane Transit District PO Box 7070 Eugene, Oregon 97401 Project: LTD Fleet Building Remodel Expansion ~350'0E. p"" Ave. E-ug'ene, O'regon DiIte: Project No,: Report No.: Inspector: ID No.: 01-12-10 2097153 E-24943 D. Delatte 1080867-84 ICC Inspection of: Masoliryl Epoxy Contractor: Fortis Construction Weather: Overcast BP No.: ; COM 2009-1164' Continuous Inspection: D . Periodic Inspection: 0 Performed inspection,onthereinforcingcsteel in 8"-CMU. walls.asJollows: line 19, from C to D.4;D:4: frorrHTto 19'(8'8; )8"1~;r::'R.~jnforcing'steeh';<i~'checkedfor grade, size, lap, placement,'quantities and cleilf<3nce,'\ivheretapplicable. ';,Reinforced cells'were relatively clean anct':fce""ofexceiisive mortar projections. Clean~outs were provided. Otiservedthe placement of 4.0 yards of Knife River 7sk grout (mix 247KG3R200) into areas noted above. Grout was placed by pump and was mechanically consolidated, Walls were grouted solid, Cast one (1) set of three (3) 3" x 3" x 6" for compressive strength test. Slump - 8"+; air temperature - 56F; grout temperature - 56F. ,', Also, observed the installation of six (6) #4 x 54" horizontal dowels in concrete colu'mn near C19 for CMU connection, top three (3) bond courses. Prior to installation, the predrilled,holes'were cleaned with compressed air and a brush. Verified embed depth of 10",. Dowels were secured with Hilti Hit RE 500SD epoxy adhesive (ICC - ESR 23221 expiration date 10/2010), To.the best of our knowledge, the work inspected was in accordance with plans oated 09- 30-09, RFI 88R, pending RFI, CCD 2 and applicable workmanship provisions of the lB.C., except if noted above. ' Reviewed By: /h. -;(.fAr-, Michael L. Meyer Technical Manager , ~, ~ I(; ~ U '\<7 ~.Ir\l :)1 JAN 2 0 2010 , ~ U ~ c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis'Construction - Co'nan Doherty (email) Fortis Construction -'Aaron Thorpe (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin ~Vikki Bourcier (email) , Balzhiser Hubbard Engineers ~ Janet Spriggs (em ail) City of Springfield' .' . . . MLM:sc .J This report andlor enclosed 'test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall'not be reproduced in part or full and/or any part thereof be.disclosed without FE! Testing & Inspection, Inc.'s written authorization. 7fiJ N<N ComeII Avenue' Corvallis, Oregon 97330, phone (541 ) 757-4698, fax (541) 757-2991 29540 B Airport Road . Eugene, Oregon 97402 . phone (541) 684-3849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4844 ' fax (541) 382-4846 ~ ~' ......J '" t.. ..... Page 1 of 1 / \ 11a.'mll't;.lf~'iI~'llm.IH. Geotechnical & Cons1ruction Servires Daily Construction Report Client: Mr. Joe McCormack Project: L TD Fleet Building Date: 01-11-10 Lane Transit District Remodei Expansion Project No.: 2097153 PO Box 7070 35()0 ~. 17:h'Ave. . Report No.: E-24936 Eugene, Oregon 97401 Eugene, Oregon Inspector: M. Meyer 10 No.: Inspection of: Sitework Weather: Continuous Inspection: 0 Contractor: Fortis Construction B.P. No. COM 2009-1-164 Periodic Inspection: 1>'1 Met on-site with Aaron Th_orpe' (Fortis C::onstructionUo observe soil conditions between lines A and AAeas(o(15ays~5,:;6)3iid '7. Presently, existing paving has been removed; trenches -for ;;!asie"oir liriesh'ave been excavated and area north of bay 7 has been excavated to faCilitate' repairs .and new connections of waste oil system: Advised by MCThorpe'ih'at'trenthes excavated.fohiiew lines will no longer be needed and will be backfilled with crushed rock prior to excavating for new rotary lifts, i~. Based on our observation of the trench sidewalls, it appears that approximately 12 to 16 inches of sandy bar gravel was placed on the native soil when the pavement area was originally constructed. The bar-run was overlain with crushed rock to raise the area to finished grade. The near vertical trench sidewalls appear relatively stable and both stratas of imported material appear dense and well compacted. Recommended trench bases be cleaned of loose andlor soft material prior to placing backfill. Materials loosened or disturbed during future work should be removed and replaced with new crushed rock fill. Also, recommended that the small "nob' of existing material currently still in-place in the northwest corner of the tank excavation area be removed to allow for a uniform and consistent backfill to be placed in the entire excavation. Mr. Thorpe was asked to notify our office when additional services are needed. Reviewed By: ;11. '-t (?y-- Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email). Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc ltJJ f cg ~~ V ~~ fI,' , I -2~1O 'lj; .J/Y This report and(or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall'not be reproduced in part or full andfor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7fIJ NN CaneII Avenue' O:xvaIIis, Qegoo 97330 . pIu1e (541) 757-4698' fax (541) 757-2991 29540 B AiI]Xll1 Road . Eugene, Qegoo 97402 . pIu1e (541) 684-3849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 . phone (541) 3824844 . fax (541) 382-4846 ~ftl ""I"',*;~""""""."I" Gealed1nical & C':.anslrudian Seruioes . , Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ,ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION TEST DATE 01-19-10 01-26-10 02-09-10 02-09-10 Hold AGE (DAYSl 7 14 28 28 PROJECT BPNO. / Compressive Strength of Concrete (ASTM C 39l L TD Fleet Building Remodel Expansion 3500 E. 17'" Ave. Eugene, Oregon COM 2009-1164 DATE PROJECT NO. REPORT NO. 01-19-10 2097153 6834 01-12-10 CAST BY D. Delatte DATE RECEIVED 01-13-10 3000 psi /', u-I' / _ f../ SPECIMEN SIZE 4" x 8" 3000 psi SACKS L- -c IV I SUPPLIER Knife River 2430NE7200 CEMENT MAX SIZE AGG, 3/4" AEA AIR CONTENT 5.4% 1 TICKET NO" 3501883 SLUMP 3" 550 F YARDAGE 5.0 OF 5.0 TIME 1:10 PM 57" F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 Continuous footing with pad footing along line 2.A, from 2.3 to 2.4, remaining footing along iine 2.B, between 2.3 and 2.4, AREA (IN.') 12.56 TOTAL LOAD (LBS) 59005 COMPRESSIVE STRENGTH (PSI) 4700 AVERAGE STRENGTH (Psn TIME OF TEST 10:00 AM WEIGHT (LBS) 8.48 -1- End Cones 2 _ Cone/Split, 3 - Columnar 4- Diagonal 5 - Side (top or bottom) 6- Side (pointed lop or bottom) REMARKS: Bill Henderson (McKenzie Commercial) was advised of on-site test results. Reviewed By: (h ,'/(,/~ Michael L. Mellr Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc TYPE OF ; FRACTURE~'" 5 ,I ,I .I 'I This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or materi~r evaluated. As such, information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NW Cornell Avenue' Corvallis, Oregon 97330 . phone (541) 757-4698 . fax (541) 757-2991 29540 B Airport Road. Eugene, Oregon 97402 . phone (541) 684-3649 . faX (541) 684-3851 62979 NE Plateau Drive, Su~e 3. Bend, Oregon 9n01 . phone (541) 382-4844. faX (541) 382-4846 '~"''''l "i!!, t-. ~. .- ..... / Page 1 of 1 11:-"lIHrt..l\'.'~~~lllJ\'.h\11II CcvW II l;cal & Construction Services Report of Inspection Services Weldina/HiQh-Strenath Boltina Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 L TD Fleet Building Remodel Expansion '3500 E. 17'" Ave. Eugene, Oregon Date: Project No.: Report No.: Inspector: 10 No.: Project: Inspection of: Fabricator or Erector: Contractor: Shop: Ii!! Weather: BPNo.: Welding Melalsome Fabrication Fortis Construction ( Ct --I-l~?H 01-20-10 2097153 E-25009 C, Walpole 01040131 AWS CWI Field:'D Inside COM 2009-1164 Performed visual.,inspection on fabricated'structural steel columns 9A and 9AR Completed welds were checked for size, length, profile and 'Iocation:,,' , " Jeff Powell (Metalsome) was asked to notify our office when additional services are needed, To the best of our knowledge, the work checked is in conformance with shop drawings dated 11-17-09 and applicable AWS D1.1 code, except if noted above. Reviewed By: A.'i.~~ Michael L. M&;kr Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (em ail) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEr Testing & Inspection, Inc.'s writlen authorization. 750 NW ComellAvenue' CoNallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road, Eugene, Oregon 97402. phone (541) 684-3849 . fax (541)684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~fEI ./ Compressive Strength of Masonry Prisms ASTM C 1314 01-08-10 01-11-10 HOLLOW 1500 psi ASTM C1314 Line 17, from AA to A.7 (10'8" to top), line 19, from C toDA and line DA, from 17 to 19 (curb to 8'8"). 'Ur,'II/ltl;.h\t.'~a'liIJ\'IiII~I. Geotechnical & Construction Servk::es CLIENT Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 PROJECT L TD Fleet Building Remodel Expansion 3500 E. 17th Ave. Eugene, Oregon BP NO. COM 2009-1164 DATE PROJECT NO. REPORT NO. DATE CONSTRUCTED DATE GROUTED SOLID XXX DESIGN (F'M) SPECIMEN STORAGE LOCATION DATE RECEIVED PRISM 1.0. TIME WEATHER/TEMP. FEI REP. D. Delatte C'l:LI.. t If MORTAR: PSI/TYPE SAND CEMENT LIME OTHER TEMP. SOURCE/I.D. GROUT: PSI AGG. SIZE CEMENT ADDITIVE SLUMP TEMP. SOURCE/I.D. TICKET NO. 18001 S Spec mix bag 01-18-10 2097153 6832 01-12-101 8" x 8" x 16" smooth face 7:20 AM I Overcast/53" 2500 psi 3/8" 7sk :1:9" 53' Knife River/247KGR200 3501849 ;1 SPECIMEN SPECIMEN SPECIMEN NET CROSS- COMPRESSIVE AVERAGE' TEST AGE HEIGHT LENGTH WIDTH SECTIONAL TOTAL STRENGTH STRENGTH DATE (DAYS) (IN.) (IN.) (IN.) AREA (IN.'l LOAD (LBS) (PSIl (PSI) 01-18-10 7 15.75 8.50 7.625 64.81 159920 2470. 02-08-10 28 02-08-10 28 Reviewed By !!L~~ Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) . Fortis Construction - Aaron Thorpe (emaii) Pivot Architecture - John Stapleton (email) Hohbach-Lewin ~ Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfieid MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7fIJ tw CamJl Avenue: Cavallis, 0ega197330' phale(541) 757-4698, fax (541) 757-2991 29540 B Airport ROad . Eugene, 0ega197402 . phone (541) 6lJ4.3849 . fax (541 )684,'3851 62979 NE Piateau Drive, Su~e 3' Bend, Oregon 97701 . phone (541) 382-4844. fax (541) 382-4846 ~fEI 1I""""""'''''''"'.'ll''' Geo1echnical & Construction SeIvices / Compressive Strength of Masonry Prisms ASTM C 1314 CLIENT Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 PROJECT l TO Fleet Building Remodel Expansion r3500 E. 17'h Ave. Eugene, Oregon BP NO, COM 2009-1164 DATE PROJECT NO. REPORT NO. DATE CONSTRUCTED DATE GROUTED SOLID XXX DESIGN (F'M) SPECIMEN STORAGE lOCATION DATE RECEIVED PRISM 1.0. TIME WEATHER/TEMP. 01-08-10 01-11-10 HOllOW 1500 psi ASTM C1314 12" CMU preconstruction testing. D. Delatte FEI REP, Cf-- ! / ~t( MORTAR: PSI/TYPE SAND CEMENT liME OTHER TEMP. SOURCE/I.D. GROUT: PSI AGG. SIZE CEMENT ADDITIVE . SLUMP TEMP. SOURCE/I.D. TICKET NO. 1800/ S Spec mix bag 01-18-10 2097153 6833 01-12-10 8" x12" x 16" smo lth face 7 :20 AM Overcast/530 2500 psi 3/8" 7sk :!:9" 530 Knife River/ 247KGR200 3501849 SPECIM.EN SPECIMEN SPECIMEN NET CROSS- COMPRESSIVE AVERAGE TEST AGE HEIGHT LENGTH WIDTH SECTIONAL TOTAL STRENGTH STRENGTH DATE (DAYS) (IN.l (IN.) (IN.) AREA (IN.') LOAD (LBS) (PSI) (PSI) 01-18-10 7 16.00 8.50 11.625 98.81 233635 2360 02-08-10 28 02-08-10 28 Reviewed By /h.-I" })h. - Michael L.v;,e~ Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (em ail) Hohbach-lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MlM:sc This report and/or enclosed test data is the confidential property of the client to wnom it is addressed and pertains to the specific process and/or material evaluated. .As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7fIJ t-NV Canell Avenue' CavaI~, Oregon 97330. phone (541) 757-4698' fax (541) 757-2991 29540 BAirpatRoad . Eugene, Oregon 97402' phone (541)684-3849' fax (541) 684-J851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~FEl I 11~"I~lrt;<lI~.'~a'UII~_ G.=,;~'" ,eal & C..onstruclion ServiCES Compressive Strength of Concrete (ASTM C 39\ CLIENT Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 PROJECT L TD Fleet Building Remodel Expansion 3500 E. 17th Ave. Eugene, Oregon COM 2009-1164 DATE PROJECT NO. REPORT NO. 01-18-10 2097153 .6824 BPNO. DATE CAST 01,04-10 CAST BY D. Delatte DATE RECEIVED 01-05-10 STRENGTH REQUIRED 4000 psi SPECtMEN SIZE 4" x 8" STRENGTH PLACED 4000 psi SACKS SUPPLIER Knife River PRODUCT CODE 2440NE5200 CEMENT MAX SIZE AGG. 3/4" ADDITIVES 1 % accelerator AIR CONTENT LOAD NO. 1 TICKET NO. 3461587 SLUMP 33/4" CONCRETE TEMP 54" F YARDAGE 10,75 OF 31.50 TIME 8:05 AM AIR TEMP 45" F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 POUR LOCATION Slab on grade line A to D.2, from 18.5 to 19 and on line D.2 to 0.4, from 17 to 19. LOAD 1 SAMPLED Near B18. 7. TEST DATE 01-11-10 01-18-10 02-01-10 02-01-10 Hold AGE (DAYS) 7 14 28 28 AREA (IN.') 12.56 12,56 WEIGHT (LBSl 8.65 8.64 TOTAL LOAD (LBSl 65495 70505 COMPRESSIVE STRENGTH (PSI) 5210 5610 AVERAGE STRENGTH (PSIl TIME OF TEST 8:25 AM 9:30 AM I I TYPE OF FRACTURE*,* 5 II 5 I .. 1- End Cones 2 _ Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top or bottom) 6 - Side (pointed top or bottom) REMARKS: Bill Henderson (McKenzie Commercial) was advised of on-site test results.. Reviewed By: . 1h.~.Prt- Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (ema!l) Fortis Construction - Tim SisseL(email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such. information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection. Inc.'s written authorization. 750 NW Comell Avenue' COlVallis, Oregon 97330, phone (541) 757-4698' fax (541) 757-2991 29540 B Airport Road. Eugene, Oregon 974D2 - phone (541 ) 684-3849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541)382-4844' fax (541) 382-4846 ~fEI Page 1 of 1 / 1I;"III'Ir.;"I~,'~~'IIIIl'.IH" Geotechnical & Conshuclion ServiceS Daily Field Report Client: Mr. Joe McCormack Project: L TO Fleet Building Date: 01-15-10 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17" Ave. Report No.: E-24982 Eugene, Oregon 97401 'Eugene, Oregon Inspector: D. Delatte 10 No.: 1080867-84 ICC Inspection of: Masonry Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BP No.: 'COM 2009-1164 Periodic Inspection: 0. Performed inspection on the reinforcing steel in 8" CMU walls 'a's follows: line 19, from C to 0.4; 0.4, fr,om 17. to 19 (16' to.top)',:.Reintorcing steel was,c[1ecked for grade, size, lap, placement, quantities and clearance,_where applicable. Reinforced.cells Were relatively clean and free of excessivemo[tar'projections. Clean-outs were provided. Observed the placement of 6.0 yards of Knife River 7sk grout (mix 247KG3R200) into areas noted above. Grout was placed by pump and was mechanically consolidated, Walls were grouted solid. Slump - 8"+; air temperature - 62F; grout temperature - 60F. Contractor installed steel plate with 1/2" anchors at :1:24" on center (7" embedment depth) along top of new wall after grout placement and consolidation was completed, To ttie best of our knowledge, the work inspected was in accordance with plans dated 09- 30-09, RFI 88R, pending RFI, CCD 2 and applicable workmanship provisions of the LB,C., except if noted above. Reviewed By: /l1.(~ Michael ~. M~ Technical Manager c: Fortis Construction - Kean Rager (em ail) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (em ail) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (em ail) City of Springfield MLM:sc This r~port and/or enclosed test data i~ the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc. 's written authorization. 7<fJ NN O:meIIAvenue' Cavallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 B Airport Rood . Eugene, Oregon 97402 ' ph<re (541) 684,3849 . fax (541) 684-3851 62979 NE Plateau Drive,Suite3' Bend, Oregon 97701. phone (541) 382-4844, fax (541) 382-4846 {~ftl 11~'II~lrf;.I~~'~~lIllh'.IN. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLAC'ED PRODUCT CODE ADDITIVES LOAD NO. GROUT TEMP AIR TEMP POUR LOCATION TEST DATE 01-18-10 02-09.10 02-09-10 AGE (DAYS) 6 28 28 Respectfully, . /h. -7. ~------- Michael L, ~eyed Technical Manager /" Geotechnical & Construction Services Compressive Strength of Grout ASTM C 1019 PROJECT L TO Fleet Building Remodel Expansion 3500 E. 1 ih Ave. '~Eugene, Oregon BP NO. COM 2009-1164 DATE PROJECT NO. REPORT NO. Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 01-12-10 2500 psi 2500 psi 247KG3R200 CAST BY D. Delatte DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG, SACKS CEMENT 7.0 1 TICKET NO. 3501873 SLUMP 56" F YARDAGE 4.0 OF TIME 56" F WEATHER Overcast SPECIMEN STORAGE 8" wall line 19, from C to D.4 and D.4, from 17 to ,19 (8'8" to 16'). AVERAGE WIDTH (IN.) 3.25 01-18-10 2097153 6835 01-13-10 '3"x3"x6" Knife River 3/8" 8"+ 11:00AM ASTM C1019 :1 HEIGHT (IN.) 6.25 SAMPLE AREA (IN.') 10.56 TOTAL LOAD (LBS) 23640 COMPRESSIVE AVERAGE STRENGTH (PSIl STRENGTH (PSIl 2240' c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report and/or enclosed test data IS the confidential property of the client to whom it is addressed and pertains to the specific process and/or materIal evaluated. As such, information contained herein shaH not be reproduced in part or full and/or any part . thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization. 7ffJ ~ Cornell Avenue' Cavalis, Oregon 97330. phone (541) 757-4698, fux(541) 757-2991 29540 BAirport Road, Eugene, Oregon 97402. pl10ne (541) ffi4.J849 'fax(541)ffi4.J851 / I ~......~ ...~tt. Page 1 of 1 11~'lr~lrt;.II"':l;'llliI'lIW!I Geotechnical & Cons1rudion Serviaes Daily Field Report Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 Project: L TD Fleet Building Remodel Expansion 35001::. 17th Ave. E~gene, Oregon Date: Project No.: Report No.: Inspector: ID No.: 01-18-10 2097153 E-24994 D, Delatte 1080867-88 ICC Inspection of: Epoxyl Wedge Anchors Contractor: Fortis Construction Weather: Overcast BP No.: COM 2009-1164 Continuous Inspection: D Periodic Inspection: 0 ,..... Observed the installation of eight (8)"3/4" x 10" Hilti KBTZwedge anchors (ICC - ESR 1917) for three (3) infill columns along line 18, between A and'B for ,new overhead and man door. Prior to installation;'th-e-predrilled holes were cleaned with compressed air. Anchors were installed andtightened'with contractor'stoique wrench set at 110 ft/lbs, and verified with FEl's certifi~d torque 'wrench. Also, observed the installation of two (2) 3/4" all-thread anchors for fuel gantry column to slab on grade connection, the west column at north island, Prior to installation, the predrilled holes were cleaned with a brush and compressed air. Verified embedment depth of 6". Anchors were secured with Hilti Hit RE 500SD epoxy adhesive (ICC - ESR 2322/ expiration date 10/2010). To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09, 'RF1114 and appiicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: OJ.t:.~ Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (emaH) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield '.~.~(Q;~UVl~ r,l ,1 JAN 2 6 2010 IJ MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific processand/or material evaluated. .. As such, information contained herein shall not be reproduced in part or full and/or any part . thereof be disclosed without FEI Testing & Inspection, Inc:. 's writ/en authorization. 7ffJ rwv eomeO Avenue' Corvallis, Oregon 97330. phone (541) 757-4698. fax (541) 757-2991 29540 B Airport Road . Eugene, Oregon 97402 . phone (541) 684-3849 . fax (541) 684J851 62979 NE Plateau Drive, Suite 3' Bend, Oregon 97701. phone (541) 382-4844 . fax (541) 382-4846 / ~ .......1 ~tt Page 1 of 1 11:"'llflfl;.lflo'~~'IIIJj~ Gvv~",U: " ,;cal & Construclion Services Daily Field Report,: I Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 Project: L TO Fleet Building 8.emodel Expansion 3500 E. 17'" Ave. Eugene, Oregon Date: Project No.: Report No.: Inspector: 10 No.: 01-27-10 2097153 E-25054 A. Fenstermacher 5258882-49 ICC Inspection of: Reinforced Concrete Contractor: Fortis Construction Weather: BPNo.: ,F-og .COM2009-1164 " Continuous Inspection: 0 Periodic Inspection: 0 Performed'preliminary inspectioQ Qn the',yinforcing steel for,two (2) pier cages (not yet placed in bore hole) andinsp'ection.'on,theTeinforcing steel 'f61 wash building upper slab on grade. Reinforcing steel, 'lll.as,checked..for size, grade,J~ps, quantities, locations, ties, clearance and supports, where<;lp~Lcable. A final inspection will be performed on piers prior to concrete placemerifto verify clearances. Observed the placement of 45:75'yards 01 Knife River 4000 psi concrete (mix 40-1NK) into slab noted above. Concreie was placed by pymp and was mechanically consolidated, Cast one (1) set ofJour.(4) 4" x 8" gompressive strength cylinders. Notified Bill Henderson (McKenzie'gi:>mmercial) of the on-site results. Slump - 51/4"; concrete temperature - 53F; air temperature - 37F. To the best of our knowledge, the work inspected was in accordance with CCD3 drawing 35-3-02 dated 12-23-09, pending RFI138 dated 01-27-10, plans dated 09-30- Og and applicable workmanship provisions of lhe I.B.C., except if noted above. . Reviewed By: ;Jt,~~ ---- Michael L Meyer Technical Manager c: Fortis Construction - Kean Rager (em ail) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (em ail) Pivot Architecture - John Stapleton (em ail) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - JanetSpriggs (em ail) City of Springfield RECEIVEII FEe 0 2 1010 MLM:sc This report and/or enclosed test data'is the confidential property of the client to whom it is addressed and pertains to the specific process and/of material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, loco's written authorization. 7fJJ r-m ~I Avenue' Corvallis, Oregm 97330, phone (541) 757-4698, fax(541) 757-2991 29540 B Airport Rood . Euga1e, Oregm 97402 . phone (541)684-3849 ' fax (541) 684.J851 62979 NE Plateau Dri~,~, Suite 3 . Bend, Oregon 97701 . phone (541)382-4844' fax (541) 382-4846 / ~ftl Page 1.of 1 11~'11I111't;1I1~~'~a'II'I~.I~l. GeOlechnical & Construclion Services Daily Field Repor,t Client: Mr. Joe McCormack Project: L TD Fleet Building Date: 01-29-10 Lane Transit Dislrict Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17'" Ave. Report No.: E-25070 Eugene, Oregon 97401 Eugene, Oregon Inspector: D. Delatte ID No.: 1080867-84 ICC Inspection of: Masonry Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BP No.: COM 2009-1164 Periodic Inspection: 0 Performed inspection on the reinforcing steel in 12" CMU walls along line 2.A and 2.B, from 2.3 to 2.4 (ftg. to 8') and two (2)- 8" return walls near line 2.4 (ftg. to 8'). Reinforcing steel was checkeif"fof"grade, size, lap, placement, quantities and clearance, where applicable. _,Reinforced cells were relatively clean and free of excessive mortar projections. Cleanouts were provided. Observed the placement of 8.5 yards of Knife River 7sk grout (mix 247KG3R200) into walls noted above. Grout was placed by 'pump and was mechanically consolidated. Walls were grouted solid. Slump - 8"+; air temperature - 45F; grout temperature - 55F. To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09, RFI 88R and applicable workmanship provisions of the LB,C., except if noted above. Reviewed By: A.7f'.~ Michael L. MePer Technical Manager c: Fortis Construction - Kean Rager (em ail) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield R[:: C/.:.: .' I Vi:. rEDO ,. .2 2C/J MLM:sc This report and/or enclosed test ctatais the confidential property of the cllen! to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorization. 750 N-N ComeIIAvenue' Cavalis, Oregon 97330, phcne(541) 757-4698' fax (541) 757-2991 29540 BAirportRoad' Eugene, Oregon 97402 'phcre(541)684.J849 -fax(541)684-J851 62979 NE Plateau Dlive, Suite 3 . Bend, Oregon 97701 - phone (541) 382-4844 . fax (541) 382-4846