Loading...
HomeMy WebLinkAboutSpecial Inspection Correspondence 1998-9-28 .'.,;' SQP~29-9B 11:31A M1Itier Engineering t . ~ Mbkur.l'- . ENGINEERING, p.e: . .12&6 PEARL STReET EUOSlE:OA!OON _ ",'VIo, . -16&"-' FAX 154114&H859 September 28, 1998 . .Hayden >>omes 3258 Pinyon Strect Springfield, OR , \, T I I.. .~) :~~ " I. -.--",. I;/,\ I: \:\ *1)4B4-6B59, P.05 STRUCTURAl BUILDING DESIGN. ARE PROTEcnON COOE CONSULTANT. PLAN CHECl<ING CONSTRUCTION INSPECTION RE: .1'1\1 ";~pringfield OR - W.O. #11190-PSB Or. September 16, 1998, an 'inspection by Mortier Engineering, P.C. was made at the above site to determine how to fill a trench dug for piping and undercutting the footing. It was decided to place controlled low strength material (CLSM), a low strength cemcntitous ~~..:..~lled density fill in leu of compacted 3/4" - rock, into the trench making sure there was a 1: I slope at the ends of the trench. ^ representative from Mortier EnginecriDg, P.C. was present prior to and dtaingthe filling ofthc trench on September 24, 1998 to verify the slope and that the trench was free' of dcbree. The CLSM was installed pa- Mortier Engineering, P.C. specifications and is adequate to support the loads applied on the bearing soils of 1000 psf. J hope this report is adequate for your needs and purposes at this time. Thank you for this opportunity to be of service. If you have further questions, please do not hesitate to contact me ul 484-9080. ' Very truly yours, - Owen Grover, f.E. OLG/jjh ccncur.m*"lllJO.4