HomeMy WebLinkAboutPermit Mechanical 1987-1-22
.. RES.ENTlAl"
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
'Building Division
726-3753
r Job Location:- I .:j 0 0 -p~ '1
I AsDmorc Ma';7r-t<i''lT3- O-;I-06 -
, I
Subdivision:
I
r Ctmer:
Ta:r: Lot #
CV300
L- ()~ kJLL-r'LL/
D ~_"_~-ll=:-)
, --
Address,
/~
City:
?-'o (J.,&+ tj.q IJ
I~
, ,
in
n
n
'n
I I
i
1:
"
N"",
Addi Hen
Remodel
Uobile Home
. .j- 2---2-%'1
Date of Application.
c.'ont:ractOl'B
General
I' PLumbing
II
!I
I
I
I
//
'--"
....
Electrical
Mechar.ica l
Const:ruction Lender
1Y7 - 0;;2(-q
Pr.one:
Zip:
1Z~~
;$
Value
Address
.
Rcce:pt ~ t( In' I/lt) X
rr-- -
.
i~(J0 fJ-"
/
~
.\ I' \
\
OJ';)>
/~
\ ~7
Siqr.ed:
Date:
c20
/ -2-z-f/"7
Lise. II
Eroires
Phon~
It i4 the rssponai-bility of ths permit holder to 868 that all. inopections are made at ~h8 proper t1.mG# tr.at DaCh .::ddrS88 is readabLe
fl"Om ths 8treet~ and that the permit card is Zccated at the front of the property.
~8ui!.di'!1{J Divicior: approved plan shalt remain on the Building Sits at alZ. times.
PllOCSDURE FOR INSPECTION RE:QUEST:CALL 726-3769 (rcaorderJ state yOUI' City designa.ted job rrw::ber, job address, type of in3p6C~icn
l'aqu.estcd ar.d when you wiU be ready for inspection, Contraators or Owners name and phone number. Requests received before 7:00 am
r..'iz,z, be rmde the same day, requests made after 7:00 am wi'll be made the nczt :.JOrking day.
~i~PJ1 T~~r1C*inn~
D SITE INSPECTION: To be made after
ezaavat'ion." but prior to set up of
forms.
D. UNDERSLAB PLUMBING, ELECTRTCA~ &
. MECHANICAL: To be made before any
. work is a01Jared.
o
I
I
o
FOOTING & FOUNDATION: To be made
after trenches are ezcavated and
forms are erected, but prior to
pouring concrete..
UNDrnGROUND PLUMBING. SEWER. W"1TE.~
DRAINAGE: To be rrruie prior to fil-
.lir.g trenahes.
10
I
UNDERFLOOR PLUUBINC & MECHANICAL:
To be made prior to instaLlation of
[1.001' insulation or deaking.
O POST AND BEAU: To be rr.a.dc proior to
: instaLlation of floor insulation or
i decking. . ;~
'~ ROUG~Pi:!nmI!!G FLFCTR!CAr. ~
~ ANICAL:/ No work ie to be cOL'ered
(z.u:pjl:'thcs6 insp~atior.s ~e beer.
Tfffide and approve..... .
D FIREPLACE,: Prior to plaair.g faaing
materials and before framing inspec-
tion.
D FRAJaNC: Must be requested after
approval of rough plwr.bing, eZeatri-
.cal & mechanical. All roofing
braeing & chimneys, etc. 11T'.J.st be
:" completed. No work is to be con-
."....cealed until this inspection has
~be~n made and approved.
Your City Desigr.ated Job Numb€!" Is:
O INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulati:m w.d
.' .' required vapor barriers are in place
. . but before any lath, gypsum board or
IiJaU covering is applied, and before
any inJJul.ation is concealed.
O DRYWALL INSPECTION: To be made
after an d:rywan is in place."
. but prior to any taping. .
O. MASONRY: Steel location, bona.
beam:;, grouting or verticals in
accordance with U.B.C. Section
2415.
O WOODSTOVE: After installation is
ccmpLeted. .
o
CURB & APPROACH APRON: AftlL"'" forms
are erected but prior to pouring
co~rete.
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
pf-way, to be made aftel' all exca-
vating ccmplete & fOlm wrk & sub-
, base material in plaae.
o
O PENCE: When compl;;.te -- Provide.
gates or movable sections through
P.U.E. .
o
~1005t/
. DEf.10LITION OR NOVEl) BUILDINGS
:J Sani tary se:Jer capped at ~opcr~' 1.ir.e
~ Septic tank 17~Gd and fill~~ with gra~~l
:J Final - rfhen aA."Ve items are completed
ardi when demolition is complete or Btru~-
ture moved and premises cleaned. up.
NabiZe Hemes
:=J Blocking and Sat-up
:=J Plumbing connections -- scwer and water
---, Electrical Connection - Blocking, set-up
--.J and pLumbing connections rrr.J.st ce approved
before requesting electrical in8pec~ion
~ Acces.sq1":i Building
:J Final - Aftttr paranes, skirting, decks,
etc. are completed.
o
AlL project conditions, such as the installation of street trees, ca~lotion of the
required Zandscc:pir'.g, etc., must be satisfied before the BUILDING FINAL can be raquestad.
o FIliAL PWlaJIlIG
~ FINAL ME~HA/lICAL 1.f\
o FINAL ELECTRICAL
~
o
FINAL BUILDING: The Final Building Inspection must be requeated after the Final Plumbing
Electrical, and Mechar.ical Inspectio7W havo been made and approved.
/tALL MANHOLES AND CLEANOUTS nUST BE ACCESSIBLE, ADJUST!fENT TO BE NADE "'T NO COST TO CITY I Page 1 of 2
I JOB NO.
Zone:
SOLAR ACCW
Occuoancu G~~:
Lot Sq. pt;.
S of Lot C,,"emg<
tI of Stories
TotaL Height
T...t''-':t4..t'hy
I
lITEM
I Main
I Gc:race
I Carool't
I Accessol'u
I
I
, SQ.FTC
TOTA& VAWE
Is.D.c.
fvc/.uCJ
-1.5 :r
Building Permit
Sta te Surcharge
TotaL Cha~ges
lITEM IND. I PEE
Fi:rtu:res I I
I ResidentiaL () bath) I I
I Sanitary SewSl' I I
Water I
I
Plumbing Perr.:i t
. State SWOCr.lU'gB
Total Charoes
lITEM I NO'1 PEE
Res. So. fta.
NilW/Extend Circuits I I
Temporary Service I I
I I
EZeotricaZ Permit
State Sur~har(:1e
Total Cha:l'C6S -
ITEM
I NO.
i
I
I
TI
I
I
I- "
PzattuIce ETU' S
I Exhaust Hood
I Vent Fan
I WOodstoiJe
I
Permit Issuance
Mechanical Permit
State Surcharae
To-tnl CharoP.l:r
I -- ENCROACHMENT --
ISe~~ritu DZP03it
I Storage
I Maint~e
Ipcnm:t
I Tota l Cha1'oCS
I Curbcut
I SidewaLk
I Fcn::e
Electrical Label
Mobile Home
I TOTA& AMOUNT DUE,'
I
I
I
I
I
I
I
j
I
I
I
I
I
I
I
I
I
I
I
I
'I ~
I I
I /S.OO I-- ~
I .&01
t IF;.... tiJ I'.
I
I
I
I.
I.
I
.1
I
I
I
I
I I
( ~. 0f) I.
WT TYPE
Interior
Corner
PanhandLe
CUL-de-sac
.X
Value
CHARGE
CHARCE
FEE
CHARGE
REQ,-
L'-COG->:O
.
I
I
I
II
i I
T:.{oe/Cor.st:
Bedrooms:
I Enarau Sources
Heat
WaterlJl?fJtp.l"
Range
FirevZace
Wood::;tove
I Lot Paces -
I Setbacks
I P.L. House CaJ'aae Access.
North
E:ast
Sou th
IWest
T":Je
Fees
Building Value & Permit
This permit iu granted on the express condition that the sdid construction
shalZ~ in all respects, conform to the Ordinance adopted by the City of
Springfield, inc!uding the Zoning Crdinance, reguZating the construction
and uae of buitdings~ and may be suspended 01' revoked at cr.y time upon vio-
lation of any provisions of said Ordinances.
I
I.
I.
I PLan Check Pee:
I Date Paid:
IRecdpt #:
I Signed:
Plumbing
Permit
I
I
I
I
I .
No person shall construct, install, alter or change any new or e:isting
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except tr~t a person may do
pl~bing work to property which is armed, leased Or operated by the appli-
cant.
.'
Electrical
Permit
Where State LaLJ requires tr.at the electrical work be done by an Electrical
Contractor, the electroical portion of this permit shall. not be valid until
the Zabel has been signed by the Electrical Contractor.
.
Mechanical
Permit
Plan Ext::rrnner
ua.e
I HAVE CAREFU&&Y EXAMINED the compLeted appLication for pemt. and do
hereby aertify that all info:omation hereon is true and correct, and I
further certify that any ar.d all lJOrk performed shall be done in accor-
dance :Jith the Ordinances of the City of Springfield, and the: La:..;s of tha
State of Oregon p~rtaining to the work described herein, end that NO OCCU-
PANCY :JiZZ be rmde of any structure without peromission of the Building Di-
vision. I further certify that only contractors ar~ employees who are in
compliance with ORS 701.055 will be used on this project
fr~0-
fJ~
Date
1- zz~gr;