HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-12-16 -- ------- -------- ~ftl page10f1~ ..:t.'UlftfJ..In..,llllltln_mlll GeotecIri::aI & Construction SeMEs Daily Field Report Client: Mr, Joe McCormack Project: L TO Fleet Building Date: 12-16-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E, 17'" Ave. Report No.: E-24786 Eugene, Oregon 97401 Eugene, Oregon Inspector: D. Delatte 10 No.: 1 080867-88 ICC Inspection of: Wedge Anchors/ Weather: Inside Continuous Inspection: 0 Epoxy Dowels Contractor: Fortis Construction BPNo.: COM 2009-1164 Periodic Inspection: ~ Observed the installation of fourteen (14) 3/4" x 7" Redhead Tru.bolts for steel column to CMU wall connection at new overhead door opening as follows: seven (7) at lines 18AA and seven (7) at 18A.6. Prior to installation, the predrilled holes were cleaned with compressed air. Verified minimum embedment depth of 5", Contractor tightened anchors to 175 ftllbs, Installation torque was verified with FEl's calibrated torque wrench (Proto Blackhawk 498604), One (1) anchor at 18AA (2'" connection from top) and the top four (4) anchors at 18A,6 were not torqued to 175 ftIlbs, due to pull out or slipping in hole. Also, observed the installation of #5 and #4 dowels into existing CMU walls or slab on grade for new CMU infill walls as follows: line C, between 16 and 17, eight (8) #5 horizontal dowels into each side of existing opening and eleven (11) vertical into slab; line 18, between A.5 and A.9, six (6) #4 horizontal at each side of opening (three (3) locations with two (2) per location) and two (2) #5 vertical into slab; line 17AA,8 (door return), six (6) #5 horizontal dowels (three (3) locations with two (2) at each location); one (1) #5 vertical dowel into slab, Prior to installation, the predrilled holes were cleaned with a brush and compressed air. Verified minimum embedment depth of 8" into slab with #5 dowels, 4" into CMU for #4 dowels and 5" for #5 dowels, Dowels were secured with Hilti Hy 150 max epoxy adhesive (ICC - ESR 2262/ expiration date 08/2010) in CMU walls and Hilti Hit RE 500SD epoxy adhesive (ICC - ESR 2322/ expiration date 07/2010) for slab connections. To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09, RFI 48, RFI 69 and applicable workmanship provisions of the LB,C" except if noted above, Reviewed By: A :;(. 0':r- Michael L. Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to wtlom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc,'s written authorization. 7fJJ NN CaneIlAverve' Cava1Iis, Qeg:x197nJ' (ime(541) 757-4008, fax(541) 757.:;!!$}1 29540 B Aipat RoOO . Eugene, Qeg:x197402 ' ~ (541) 684-3849 ' fax (541 )684J851 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 'phone(541)382-4844' fax (541) 382-4846 ~fE' kf- Page 1 of 1 ~ . ~ & Coostn.dion SeIVires Daily Field Report ~.~'ilrlrw..,\'..'~l'II'I~.I\'I" Client: Project: L TD Fleet Building Remodel Expansion 3500 E, 17'" Ave, Eugene,Oregon Date: Project No.: Report No.: Inspector: ID No.: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 12-16-09 2097153 E-24787 D, Delatte 1080867-88 ICC Inspection of: Reinforcing Steel/ Reinforced Concrete Contractor: Fortis Construction Weather: Overcast Continuous Inspection: 0 BP No.: COM 2009-1164 Periodic Inspection: ~ Performed inspection on the reinforcing steel for continuous footing along line D A, from 17 to 19 and line 19, from C to D.4. Reinforcing steel was checked for grade, size, lap, placement, quantities and clearance. Contractor installed two (2) #4 vertical dowels in lieu of one (1) #5 dowel for CMU wall to slab connection at five (5) locations along line 19, from C to CA, Observed the placement of 6,5 yards of Knife River 3000 psi concrete (mix 2430NE7200) into footing noted above, Concrete was placed directly from truck and was mechanically consolidated, Cast one (1) set of five (5) 4" x 8" concrete test cylinders, Slump - 4"; concrete temperature - 60F; air temperature - 52F; air content -4,0%, Also, performed preliminary reinforcing steel inspection for wash building trench/slab, Reinforcing steel was checked for grade, size, lap, placement, quantities and clearance, Final inspection will be performed prior to concrete placement. To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09 and applicable workmanship provisions of the I.B,C., except if noted above, Reviewed By: /A,{.~ Michael ~. ""er Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report andlor enclosed test data is the confidential property of the client to Vllhom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7ffJ NN CaneIIAverue' CavaIIis, 0regxl97330' phcre(541) 757-4600, fax (541) 757-2991 29540 BAipatRoad 'El.lQal", 0regxl97402' phcre(541)l384-1849' fax (541) 684J851 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 I kl2- ~ftl Page 1 of 1 11~'llI'I~';.I~Iio'l:i~IIIIIl'ULI Geotedri:al & ConsIru::OOn Servre; Daily Field Report Client: Mr. Joe McCormack Project: L TD Fleet Building Date: 12-15-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E. 17th Ave, Report No.: E-24774 Eugene, Oregon 97401 Eugene, Oregon Inspector: C, Walpole 10 No.: 5114210-85 ICC Inspection of: Epoxy Anchors Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BPNo.: COM 2009-1164 Periodic Inspection: 0 Witnessed the installation of epoxy anchored rebar dowels for new wall (ref: 6/S502) at grid lines C/19 and D .4/17, Two (2) #5 bars were installed vertically and two (2) #7 bars installed horizontally at each location, Als,o, witnessed the installation of 3/4" x 12" epoxy anchored all thread for column anchor bolts as follows: grid lines AA/7, AA/8, AA/9 each had four (4) anchors and grid lines C/18 and C/19 each had two (2) anchors, Prior to installation, the predrilled holes were cleaned with compressed air and a nylon brush, Verified minimum embedment depths, Anchors were secured with Hilli Hit RE 500SD epoxy (expiration date 10/2010). To the best of our knowledge, the work inspected was in accordance with plans dated 09-30-09 and applicable workmanship provisions of the LB. C., except if noted above. Reviewed By: ~~~.~ Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel {em ail) Fortis Construction - Conan Doherty (email) Fortis Construction - Aaron Thorpe {em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/Of material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FE! Testing & Inspection. lnc.'s written authorization. 700 NoN CareII Averue ' CavaIis, 0eg:)19T.nJ ' j:tlme (541) 757-4698 ' fax (541) 757-2991 29540 B Aiq:ot Road ' Ecgere, 0eg:)197402 ' j:tlme (541) 6!l4J849 ,fax (541) 684J851 62979 NE Plateau Drive, Suite 3 ' Bend. Oregon 97701 'phone (541) 382-4844 ' fax (541) 382-4846 ~ftl Page 1 of 1 Goolech1icaI & Construdion Savre; Daily Field Report .m,m,l,r.'.'.,l.',i.:..'I,I.I,.fu\. Client: Project: L TD Fleet Building Remodel Expansion 3500 E. 17lh Ave, Eugene, Oregon Date: Project No.: Report No.: Inspector: 10 No.: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene. Oregon 97401 12-15-09 2097153 E-24780 M, Meyer 0877905.88 ICC Inspection of: Reinforced Concrete Contractor: Fortis Construction Weather: Light Rain BP No.: COM 2009-1164 Continuous Inspection: 0 Periodic Inspection: It'! Performed inspection on the reinforcing steel in the wash building sump pit slab and slab on grade infill in restrooms 423 and 441, Rebar was checked for size, grade, quantity, lap, spacing, ties and supports, where applicable, Observed the placement of 8,5 yards of Knife River 4000 psi-concrete (mix 2440NE5200). Concrete was placed directly from truck and was mechanically consolidated, Cast four (4) 4" x 8" compressed test cylinders and performed field tests as follows: slump - 41/4"; concrete temperature - 63F; air temperature - 50F. Bill Henderson (McKenzie - Commercial) was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance with conformed drawings dated 09-30.09 and applicable workmanship provisions of the LB,C., except if noted above, Reviewed By: /JJ,'/,~~ Michael L.' Me(er Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (em ail) City of Springfield MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7ffJ IW<J CaneI AV<nJe ' CavaIis, O'eg:n 97330, ~ (541) 757-4008' fax (541) 757-2991 29540 B AipCJt Road ' Eugene, O'eg:n 97402 ' ~ (541) lJ8.ih1849 ' fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 3824844, fax (541) 382-4846