Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-12-11 (~ftl ~ '1:t.'1mlrt;.W,~ilalllfJl""'l~ G.- U.. ~.....J & Constn.dbn ~ Compressive Strength of Concrete IASTM C 39) EWEB 500E, 4th Ave. Eugene, Oregon 97440 CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED TEST DATE 12-11-09 01-01-10 01-01-10 Hold AGE (DAYS) 7 28 28 PROJECT Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon DATE PROJECT NO. REPORT NO. BPNO. 2008-00225 12-04-09 CAST BY 0, Delatte DATE RECEIVED 4000 psi SPECIMEN SIZE 4000 psi SACKS SUPPLIER 2440KIUOKS CEMENT MAX SIZE AGG, Super; Eclipse; AEA AIR CONTENT 1 TICKET NO. 3501354 SLUMP 56' F YARDAGE 10,0 OF 20,0 TIME 33' F WEATHER Overcast SPECIMEN STORAGE Water settle channel; (our (4) slabs at elevation 588,50 in north half of filter basin, Slabs. AREA (IN.') 12,56 WEIGHT (LBSl 8,52 TOTAL LOAD (LBS) 60935 COM PRESSIVE STRENGTHIPSIl 4850 AVERAGE STRENGTH (PSI) TIME OF TEST 4:10PM REMARKS: Jake Stucky (Wildish) was advised of on-site test results, .. 1- End Cones 2 - ConefSplil 3 _ Columnar 4 _ Diagonal 5 - Side (top or bottom) 6 - Side (pointed top or bOttom) Reviewed By; ;Jt, '7(,~______ Michael L. MeyP Technical Manager c; EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield Knife River MLM;sc 12-11-09 2087168 6789 12-05-09 4" x8" Knife River 3/4" 4.7% 5" 9:45 AM ASTM C 31 TYPE OF FRACTURE" 5 This report andlor enclosed test data is the confidential property of the client to lNhom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 t#J Cornell Avenue' Corvallis, Oregon 9733O. phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road' Eugene, Oregon 97402, phone (541) 684-3849 'fax(541)684-3851 62979 NE Plateau Drive, Suile 3 . Bend, Oregon 97701 . phone (541) 3824844 ' fax (541) 382-4846 ~ ~ftl Page 1 of 1 1II.~'I~lllr.'.'.ll~I...llh'JIIIllWlI G,.,,;.,-'; . .;...,J & Constn.di:Jn Servires Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Date: 12.11.09 500E, 4th Ave, Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24766 Inspector: A. Fenstermacher 10 No.: 5258882-49 ICC Inspection of: Reinforcing Steel Weather: Showers Continuous Inspection: 0 Contractor: Wildish Building, Co, BP No.: 2008-00225 Periodic Inspection: Ii:! Performed preliminary inspection on the reinforcing steel for filter building center upper walkway; two (2) gullet channel slabs; settled water channel wall; weir box walls, Reinforcing steel was checked for size, grade, laps, quantities, locations, ties, clearance and supports, A final inspection will be performed prior to concrete placement. To the best of our knowledge, the work inspected was in accordance with plans dated 0212008 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: '~~@~n~~~ 1 DEe J 6 2009 . J. (l1,'i,~ Michael L Meyer Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (emall) OBEC- Pete Slocum (email) Wildish Building Co,. Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7ffJ w-J Canal A~' CavaItis, C\'eg:Jl97330' p'u1e(541) 757-4698' fax(541) 757-2991 29540 B Aipa1 Road ' EUJE'fi!, C\'eg:Jl 97402 ' phcre (541)684J849 ,fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 . phone (541) 3824844 ,fax (541) 3824846 '?~ ~ftl "."",.".,.."'",."..,,, _ G.,.....;d:, ~ & Construdi:Jn ~ EWEB 500E. 4~ Ave, Eugene, Oregon 97440 CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED TEST DATE 12-09-09 12-30-09 12-30-09 Hold AGE (DAYS) 7 28 28 Compressive Strength of Concrete IASTM C 39) PROJECT Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon DATE PROJECT NO. REPORT NO, 12-09-09 2087168 6783 BPNO. 2008-00225 12-02-09 CAST BY D. Delatte DATE RECEIVED 12-03-09 4000 psi SPECIMEN SIZE 4' x 8" 4000 psi SACKS SUPPLIER Knife River 2440KIUOKS CEMENT MAX SIZE AGG. 3/4" Super; Eclipse; AEA AIR CONTENT 4,5% 1 TICKET NO. 3501305 SLUMP 71/2" 58" F YARDAGE 10,0 OF 30,0 TIME 9:40 AM 36" F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 Four (4) gullet walls in the east half of filter basin; four (4) slabs at elevation 588,5 in the south half of filter basin, South slabs, AREA /IN.'l 12.56 TOTAL LOAD (LBS\ 53210 COMPRESSIVE STRENGTH (PSIl 4240 AVERAGE STRENGTH (PSI) TIM E OF TEST 7 :50 AM TYPE OF FRACTUREH 5 WEIGHT (LBS) 8,45 REMARKS: Jake Stucky (Wildish) and Mike Stickling (EWEB) were advised of on-site test results, .. 1- End Cones 2 - Cone/Split 3. Columnar 4 - Diagonal 5 - Side (top or bottom) 6 - Side (pointe(t top or bOttom) Reviewed By: ti~e~,r::r-- Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) Wild ish Building Co.- Jake Stucky (email) City of Springfield Knife River MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, infonnation contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Ine,'s written authorization. 7f{) tf'N Cornell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698 'fax(541)757-2991 29540 BAirportRoad' Eugene, Oregon 97402. phone (541)684-3849' fax(541)684.J851 62979 NE Plateau Drive, Su~e 3, Bend, Oregon 97701, phone (541) 382-4844 'fax(541)382-4846 ~ ~ftl Page 1 of 1 ~~ii",~~r.'.' .,llr.';lIUItIJl 1l!!I'\'~ <X.vW . .:..cJ & Ca1stru::fun Servioas Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Date: 12-07 & 08-09 500E. 4th Ave, Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24734 Inspector: 0, Delatte ID No.: 1080867-88 ICC Inspection of: Reinforcing Steel Weather: Overcast Continuous Inspection: 0 Contractor: Wildish Building Co, BP No.: 2008-00225 Periodic Inspection: 0 Performed preliminary reinforcing steel inspection for column and center wall under' stop gate in the center of weir box, three (3) walls for weir box and the east wall of settle water channel along the top of east wall of filter basin, Reinforcing steel was checked for grade, size, lap, placement, quantities and clearance, Reinforcing steel was secured, Final inspection will be performed prior to concrete placement. To the best of our knowledge, the in-progress work inspected was in accordance with plans dated 0212008, print dated 06-04-09 (reinforcing around block out at wall under stop gate) and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: (JJ. '7(,~__ Michael L'Me' Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (em ail) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield MLM:sc ThiS report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FE1 Testing & Inspection, lnc.'s 'M"itten authorization. 7fiJ NN CareIIAvenue' CavaIis, Oegoo 97330, rrone(541) 757-4008 . fax (541) 757~1 29540 B Aipcrt Road . Eugt31El, Oegon 974<Y2 ' rrone (541) 684-3849. fax (541) 684J851 62979 NE Plateau Drive, Suite 3 'Bend, Oregon 97701. phone (541) 382-4844, fax (541) 3824846 ~ ~ftl Page 1 of 1 1II.~nlllr.;'.ll~I:'\I.it'lr.I\.a ~\ .;.,.,J & ConsUtdKx1 Servres Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Date: 12-04-09 500E. 41h Ave. Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24710 Inspector: D. Delatte ID No.: 1080867-88 ICC Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: 0 Contractor: Wildish Building BPNo.: 2008-00225 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for four (4) slabs at elevation 588,50 in the north half of filter basin and settle water channel at the filter basin, Preliminary reinforcing steel inspection was performed by our office on 12-01-09 and 12-03-09 (ref: FEI reports E-24674 and E-24708). Observed the placement of 20,0 yards of Knife River 4000 psi concrete (mix 2440KIUOKS) for areas noted above, Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of four (4)4" x 8" concrete test cylinders from load 1, Load 1: slump - 5"; air temperature - 33F; concrete temperature - 56F; air content - 4,7%, Jake Stucky (Wildish) was advised of the on-site test results, To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I,B,C" except if noted above, Reviewed By: (17. '-;(,~ Michael L. 'Met Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andfor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 MN CctneI Aveooe ' CavaIis, 0ep197330 ' phct1e (541) 757-4006' fax (541) 757-2991 29540 BAipcJt Road . Eugene, 0ep1 97402 . ~ (541)684-3849 ,fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 382-4844 'fax(541)382-4846 ~ ~ftl Page 1 of 1 .".,lllllh.;,..llitllUMn.lh" ~. ~ & Construcfun SelVires Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Date: 12-03-09 500E. 4th Ave, Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24708 Inspector: D. Delatte ID No.: 1080867-88 ICC Inspection of: Reinforcing Steel Weather: Overcast Continuous Inspection: 0 Contractor: Wildish Building Co, BPNo.: 2008-00225 Periodic Inspection: Iil Performed preliminary reinforcing steel inspection for settle water channel along the top outside of east wall of filter basin. Reinforcing steel' was checked for grade, size, lap, placement, quantities and clearance. Reinforcing steel was secured, Final inspection will be performed prior to concrete placement. To the best of our knowledge, the in-progress work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B,C., except if noted above. Reviewed By: jh,'i.~ Michael L. Meyer Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEe. Pete Slocum (ernail) Wildish Building Co.- Kevin Fitzjarrell (ernail) Wildish Building Co,- Jake Stucky (ern ail) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 NN Canal A"IffW' CavaIis, 0eg:x197330' Jhre(541) 757-4008' fax (541) 757-2991 29540 B Ai!xJ1 RoOO . El.gi1E!, 0eg:x1 97402 . Jhre (541) 684-3849 ,fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 ' phone (541) 3824844 . fax (541) 382-4846 \1L ~ftl G Page 1 of 1 IIlUi'llIurl;'.f\"I~"'hlJ\.I\I" ~ , .:caJ & Constnrlon Servires Daily Field Report Client: EWES Project: Hayden Bridge Water Filtration Date: 12-02-09 500E. 4th Ave, Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24691 Inspector: 0, Delatte IDNo.: 1080867-88 ICC Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: 0 Contractor: Wi/dish Sui/ding BPNo.: 2008-00225 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for four (4) slabs at elevation 588,50 in the south half of filter basin and four (4) gullet walls in the east half of filter basin, Preliminary reinforcing steel inspection was performed by our office on 12-01-09 (ref: FEI report E-24674), Observed the placement of 30.0 yards of Knife River 4000 psi concrete (mix 2440KIUOKS) for areas noted above, Concrete was placed by pump and was mechanically consolidated, Cast one (1) set of four (4) 4" x 8" concrete test cylinders from load 1, Load 1: slump - 7 1/2"; air temperature - 36F; concrete temperature - 58F; air content - 4,5%, Jake Stucky (Wildish) and Mike Stickling (EWES) were advised of the on-site test results, To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B,C,. except if noted above, Reviewed By: ,1JJ . '1.~ Michael ~, Mter Technical Manager c: EWES- Mike Stickling (email) EWES- Wally McCullough (email) OSEC- Pete Slocum (email) Wi/dish Bui/ding Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield MLM:ld This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such. infonnation contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc,'s written authorization. 7fIJ NN CaneII Averue ' CavaIIis, 0egxI97nl'1X1coe (541) 757-4ml' fax (541) 757-2991 29540 B Aipat RcaJ . Eugene, 0egxI 97402 '1X1coe (541)684-J849 ,fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 ,Bend, Oregon 97701. phone (541) 3824844 . fax (541) 382-4846 l~fEJ .t~'lIl~U'l;.rf~'m.llllff.l\'l" c;.....~L;..':""'01 & Orstruibn ~ CLIENT EWEB 500E. 4th Ave, Eugene, Oregon 97440 PROJECT BPNO, DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP POUR LOCATION 11-04-09 CAST BY 4000 psi 4000 psi SACKS 40-SE7 CEMENT AEA; Super; Eclipse 1 TICKET NO, 64'F YARDAGE 58' F WEATHER Two (2) inter tie tunnel walls, ~ Compressive Strength of Concrete IASTM C 39) Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon DATE PROJECT NO. REPORT NO. 12-02-09 2087168 6744 11-05-09 4" x8" Knife River 3/4" 3,6% 41/2" 1;40 PM ASTM C 31 AVERAGE TEST AGE AREA WEIGHT TOTAL COM PRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYS) (IN,') (LBS) LOAD (LBS) STRENGTH (PSIl (PSI) TEST FRACTURE" 11-11.09 7 12,56 8,52 53840 4290 11;55AM 2 12-02-09 28 12.56 8,50 ng85 5810 1;20 PM 3 12-02.09 28 12.56 8,50 73800 5880 5845 1;30 PM 3 Hold "1.EndCones 2-ConefSplit 3-Columnar 4-Oiagonal 5 - Side (top or bottom) 6 - Side (pointed top or bottom) 2008-00225 D. Delatte DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG. AIR CONTENT SLUMP TIME SPECIMEN STORAGE 3500818 4,0 OF Overcast 4.0 REMARKS: Jake Stucky (Wildish) was advised of on-site test results, Reviewed By; /J1, ~Ilr- Michael L. Meyer Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wild ish Builc!ing Co,- Jake Stucky (email) City of Springfield Knife River MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 I'm CamelI Avenue' Cotvallis, Oregon 97330, phone (541)7574698'fax (541)757-2991 29540 BAirport Road' Eugene, Oregon 97402' phone(541)~9' fax (541) 6!l4.;J851 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 . phone (541) 3824644 . fax (541) 382-4846 ~ ~ftl Page 1 of 1 112r.'III/lrt;.fI''''1jj~'II'n.I\'l'' ~ . ;..,j & Cor1strIxfun SeM:es Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Date: 12-01-09 500E, 41h Ave, Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24674 Inspector: D, Delatte ID No.: 1080867-88 ICC Inspection of: Reinforcing Steel Weather: Overcast Continuous Inspection: 0 Contractor: Wildish Building Co, BPNo.: 2008-00225 Periodic Inspection: 0 Performed preliminary reinforcing steel inspection for all remaining slab at elevation 588,50, four (4) gullet walls on east side of the filter basin, Reinforcing steel was checked for grade, size, lap, placement, quantities and clearance, Reinforcing steel was secured, Final inspection will be performed prior to concrete placement. To the best of our knowledge, the in-progress work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B,C., except if noted above, Reviewed By: I},. 't.1Ly-- Michael L. Meyer Technical Manager c: EWEB- Mike Stickling (em ail) EWEB- Wally McCullough (em ail) OBEC- Pete Slocum (em ail) Wildish Building Co.- Kevin Fitzjarrell (email) Wi/dish Building Co,, Jake Stucky (em ail) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, infonnation contained herein shall not be reproduced in part or full andler any part thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization. 7'3J toM! Corel AV<nJe' CavaIis, o"gcn97330' ptu1e (541) 757-4698 'fax(541) 757-2991 29540 B Aipat Read . Eugere, ~ 97402 ' p'1cre (541) 684-3849 . fax (541 )684-J851 62979 NE Plateau Drive, Suite 3' Bend, Oregon 97701' phone (541) 3824844 'fax(541)3824846 EWEB 500E. 4th Ave, Eugene, Oregon 97440 TEST AGE AREA WEIGHT TOTAL COMPRESSIVE DATE (DAYS) (IN.'! (LBSI LOAD (LBSI STRENGTH (PSI) 11-09-09 7 12.56 8.45 56590 4510 11-30-09 28 12.56 8,50 72810 5800 11-30-09 28 12.56 8,50 68900 5490 Hold ~ftl '1:l.'f)I~Ir.;.,~~'1U'IIWn.n:ll!l CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED ~ (,-.AnfFrlv1irn1 [I, ('.cy,,;jndm SP.i'vir= Compressive Strength of Concrete IASTM C 39\ PROJECT Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon DATE PROJECT NO. REPORT NO, 11-30-09 2087168 6736 BPNO, 2008-00225 11-02-09 CAST BY A. Fenstermacher DATE RECEIVED 11-03-09 4000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 40-SE7 CEMENT MAX SIZE AGG, 3/4" Super: Eclipse: AEA AIR CONTENT 4.6% 1 TICKET NO. 3500736 SLUMP 8" 63" F YARDAGE 9,0 OF 18,0 TIME 10:10 AM 48" F WEATHER Partly Cloudy SPECIMEN STORAGE ASTM C 31 Filter building: east half of suspended slabs above 24" FWIBW pipes and center suspended walkway, west side, From suspended walkway. AVERAGE STRENGTH (PSI) TIME OF TEST 7:35 AM 4:10 PM 4:15 PM TYPE OF FRAcTURE- 3 4 5 5645 REMARKS: Jake Stucky (Wildish) was advised of on-site test results, .. 1- End Cones 2 _ Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top or bottom) 6 - Side (pointed top or bottom) Reviewed By: fJ7. ~ fAy- Michaell. Meyer Technical Manager D ~~~U~~ n DEe 1 0 2009 U c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield Knife River MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shalf not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inco's 'Mitten authorization. 750 WoJ ComellAvenue' Corvallis, Oregoo 97330. phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road' Eugene, Oregon 97402, phone (541) 684-3849 . fax (541)68<h'l851 62979 NE Plateau Drive, Suite 3 . Bend, Oregoo 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~ ~ftl Page 1 of 1 11"'lr!lrl';"III,..'1l1a'IIII~.ml!l ~ " .:vaJ & Constn.xfun Servres Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Date: 11-24-09 500E. 4th Ave, Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24636 Inspector: A. Fenstermacher ID No.: 5258882-49 ICC Inspection of: Reinforcing Steel Weather: Clear Continuous Inspection: 0 Contractor: Wildish Building CO. BPNo.: 2008-00225 Periodic Inspection: 0 Performed preliminary inspection on the reinforcing steel for 9" walls in east half of the filter ouilding, Reinforcing steel was checked for grade, size, laps, quantities, locations, ties, clearance and supports. Note: upper 4'.5' of wall was not yet completed and will need to be checked prior to concrete placement. Jake Stucky (Wildish) was advised of the on-site ooservations, To the oest of our knowledge, the work in.progress was in accordance with plans dated 02/2008 and applicaole workmanship provisions of the I.B,C" except if noted aoove. Reviewed By: ;1;. %~ Michael L. Meyer Technical Manager fD)~~~D~~' c: EWEB- Mike Stickling (email) EWES- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such. information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEr Testing & Inspection, Inc.'s written authorization. 7ffi NN CcrneI AI/fnJe' CavaIis, 0regcr197nl' phme (541) 757-4698' fax (541) 757-2001 29540 BAipat RmJ . ELJga1El, 0regcr197402 ' phme (541) 684-3849 ,fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701, phone (541) 382-4844 'fax(541)3824846