Loading...
HomeMy WebLinkAboutPermit Building 1997-5-13 SPRINGFIELD ~- Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 970627A COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 2885 OLYMPIC ST Assessors Map #: 17023000 Tax Lot #: 02000 Owner: KRC ROLLS, INC Address: 2885 OLYMPIC ST Phone #: 726-5014 City/State/Zip: SPRINGFIELD, OR 97478 Description Of Work: NEW Value: 0,00 Contractor Const. Contractor # Expires Phone General: DORMAN CONSTRUC 0068801 PO Box 1468 Springfield OR 97477000 Electrical: LR BRABHAM 0008699 68 West Q St Springfield OR 9747721 08/21/97 744-0012 12/18/97 747-6638 QUAD AREA: 3CNC -- OFFICE USE -- LAND USE: 5300 Item FDN, FOR STEEL BLDG. Square Feet x $/square Feet = Value 369,496.00 TOTAL VALUE OF PROJECT 369,496.00 BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PLUMBING Surcharge/Admin 1,040,50 83,25 0.00 0.00 0,00 0,00 SUBTOTAL PERMITS 1,123.75 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 1,123.75 SPRINGFIELD ~*' Job Number: 970627A Page 2 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following "*11 work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. SLAB - To be made after all inslab building service equipment, conduit piping, and other equipment items are in place but prior to concrete -- - ADDITIONAL COMMENTS --- DRC #97-01-001, PLANNER IS JIM DONOVAN PERMIT FOR STEEL BUILDING FOUNDATIONS ONLY; SEPARATE PERMITS REQUIRED FOR EQUIPMENT PIT FOUNDATIONS. Plans Reviewed By: DON MOORE Building Site Reviewed By: LISA HOPPER Date: 05/13/97 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that roject address is readable from the street, that the permit card i 0 ated at the front of the property, and the approved set of plan w 1 ain on the site at all times during construction. 5/13 fen Signature Date - -- VALIDATION Date Paid: 2-S'7~ c.;/3/J? / / 2{ 7) (/~/ Receipt Number: Amount Received: Received By: