HomeMy WebLinkAboutPermit Correspondence 2006-11-1
FROM :SUB ELECTRIC
.
FRX NO. :5417262399
~ov. 01 2006 03:38PM P1
Sprinl!field Utility Board
Electric Service Center
100 I Main StrOM
Springfhl/d, OR 97477
54'-726-2395
54' ... 744-3752 Fax
T(); Lisa, City of Springfield, OR
FAX COVER SHEET
Date; J//JI2006
Fax #; 541-726-3676
h()m; Nick Anu:J/lIl
Number of pages (including cover sheel); 1
If you do "ot receive all the material hei"K h'an,mille,1, ple,.,e call;
Mes.,age.,;
Lisa. I wish to extend the exnirat;oll date of Snrin.meld Utilitv Board's oermit number
COM2005-00573 for our new substation lit 2&20 Olvmnic Street to December 29. 2006. I wn
reauestinu this extension becausc of thc tinal undcrl!round conduit eetawavs that mlLqt be
iPstalled on the west side urthe nronertv will not he ;nirtalled lmtil the middle of November 2006
and these 2etawavs arc Dlaced in the same location that linallandscauim! is reauired. Althouuh
the ~etawavs are not nart oHhe site develonment. the landscaDin!! is. and thc landscaniDI' win bc
the fmal obase of the oroiect that will need City annroval. Installation of getaways lifier or
durinu the landscaDinl! will ~tlyJ!it14'~ ollr orOl!ress and ultimatelv make a bill mess.
r took t'ltword to vour resoonse.
NickAmann (744-3711)
FRI!.1'1 : SUB ELECTR I C
.
FAX NO. :5417262399
~n. 06 2006 10:54AM Pi
--:.;, ~:
.. :_'
-~.'/
Springfield Utility Board
Electric Service Celller
100/ Main Street
Sprillgfield, OR 97477
54/.726.2395
541 - 744-3752 Fax
/
';[2\P
~ J\~'
~ ~V
~ ~ ,-
.~~
~~~ ~,~ r:f ~
~y~V\#'
if",. do ~ -'" '" "" -."".... .~,.;".. pJ- ,./, tqq - J7/1-;j ~ ~
Messages: \}.I' \ , ~
~.\9.vY
FAX COVER SHEET
Date: 6/6.12006
To: Lisa, City of Springfield, OR
Fax #: 54/-716.3676
From: Nick Amann
Number of page. (including cover sheet): 1
Lisa 1 wish to extend the exoiration dn.te of Sorinlltield Utility Roan!'s ocnnil numhe{
COM2005-00573 for our new substation at 2820 01vmoic Street. to Oecembe{ 29. 2006. I am
~lIestinll this extension because the transmission nole. that must be In..talled on the west side
of the orooertv will not be installed until late summe{/earlv fall and thesc Doles are nlaced in the
same location th...t final landscaoinl' is rec)\med. Althnut'h the noles arc not "art of the site
develonment- the landscanine is. and the Jandscaninl! will 1:xJ the Anal oha'lC of the ornicct that
will need City annnwaL InstJlllation of transmission Doles after or durin" the landscalline will
,/Headv hinder our orol!1'ess and ultimatelv !Oake a hi go mess.
I look forward to Your resoonse.
Nick
~
iF~
,~
. City of Springfield .
Building Permit & Inspection Summary
6/6/2006
12,50,35PM
Job #:
COM200S-00S73
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Job Address: 2820 Olympic St Springfield
Scope of Work: Site Work Only
Description of Work: Marcola Substation. Accept plans for
foundation for metalclad switchgear enclosure
03/29/06.
Project Status: Issued
Owner & Contractor(s)
Address
PO BOX 11735
Name
CON 2G INC
ELC OWNER
OWN SPRINGFIELD UTITLlTY BOARD
Citv. State. Zi~ Phone
EUGENE OR 97440 541-689-3850
1001 MAIN STREET
SPRINGFIELD OR 97477 541-746-8451
Valuation of Proiect
Occunancv
Construction Tvne
Cost Per So Ft So Ftl!,
Bid Amoullt
Bid Amount
Use Bid Amount
Use Bid Amount
Descrintion
Amount Paid
Temp Power 200 amps or less
+ 7% State Surcharge
+ 10% Administrative Fee
Plan Review Conun/Illd/Public
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtl 100'
Fixture
Inspectiolls - Investig. Plumb
+ 10% Administrative Fee
Encroachment Pemrit
Storm Drainage Impervious Area
Site Work
+ 10% Administrative Fee
+ 7% State Surcharge
+ 10% Administrative Fee
+ 7% State Surcharge
Foundation Pemrit
+ 8% State Surcharge
+ 10% Administrative Fee
Total Amoullt Paid
$50.00
$3.50
$5.00
$1,098.60
$45.00
$56.00
$14.00
$45.00
$4.50
$130.00
$3,526.24
$1,690.15
$169.02
$8.06
$7.00
$4.50
$177.60
$14.21
$17.76
$7,066.14
$ 1.00
$ 1.00
446,000.00
18,040.00
Date
Valuation Calculated Staff
$446,000.00 2005/07/14 TDI
$18,040.00 2006/04/21 DLM
$464.040.00
Fees Paid
Date Paid
lof4
Receint #
~-
05/16/2005
05/16/2005
05/16/2005
07/14/2005
07/15/2005
07/15/2005
07115/200:;
07/15/2005
07/15/2005
07/29/2005
07/29/2005
07/29/2005
07/29/2005
08/02/2005
08/02/2005
05/11/2006
05/11/2006
05/11/2006
05/11/2006
2200500000000000586
2200500000000000586
2200500000000000586
1200500000000000998
3200500000000000435
3200500000000000435
3200500000000000435
3200500000000000435
3200500000000000435
2200500000000001014
2200500000000001014
2200500000000001014
2200500000000001014
3200500000000000464
3200500000000000464
1200600000000000640
1200600000000000640
1200600000000000640
1200600000000000640
Plans Reviewed
Denartment
F.eceived Due Date Comnleted Result Reviewer Comments
Initial Review
Planning Review
07/14/2005
07/14/2005
07/16/2005
07/17/2005
07/14/2005 APP
07/20/2005 APP
SKG
EMM
To be built per approved
Final Site Plan -
DRC2004-00015
..
.~
Wit ..
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Public Works Review 07/1412005
Structural Review 07/14/2005
Structural Review 07/2912005
Public Works Review 03/2912006
Structural Review 03/29/2006
. City of Springfield.
Building Permit & Inspection Summary
6/612006
12:50:35PM
Job #:
COM2005-00573
Job Address: 2820 Olympic St
Scope of Work: Site Work Only
Description of Work: Marcola Substation. Accept plans for
foundation for metalclad switchgear enclosure
03/29/06.
0711712005 0712012005 APP SB
07/24/2005
07/21/2005
WE
IMP
08/0812005
07/29/2005
APP
lMP
04/01/2006
03/2912006
APP
SB
04/08/2006
04/18/2006
APP
RWC
20f4
Springfield
SOCs added for impervious
surface. Application for
Encroachment Permit
required before tapping
Stormwater line in Olympic
Street. Encroachment fee
added. LOAP already issued.
See attached document for
request for special inspection
form completion faxed to
Raymond Meduna.
Received the Special
Inspection forms.
Add'l fdn for switchgear encl.
Impervious area for this slab
already illcluded in plall alld
SOCs
Add'l foundation for
switchgear ellcl.
.
~~
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Fire Department Review
03/29/2006
. City of Springfield .
Building Permit & Inspection Summary
6/6/2006
12:50:35PM
Job #:
COM200S-00S73
Job Address: 2820 Olympic St
Scope of Work: Site Work Only
Description of Work: Marcola Substation. Accept plans for
foundation for metalclad switchgear enclosure
03/29/06.
04/03/2006 04/28/2006 OK AG
Springfield
Add') fdn. for switchgear
encl.Plan Review
COM2005-00573. Marcola
Substatioll - Additional
switchgear ellclosure.
Spill control for hazardous
materials liquid. Secondary
containment to hold largest
amount of hazardous liquid
and be compatible with
liquid. Spill control for
hazardous material liquids.
Rooms, buildings or areas
used for the storage of
hazardous material liquids in
individual vessels having a
capacity of more than 55
gallons, or ill which the
aggregate capacity of multiple
vessels exceeds 1,000 gallolls,
shall be provided with spill
cOlltrol to prevent the flow of
liquids to adjoining areas.
Floors in illdoor locations and
similar surfaces in outdoor
locations shall be constructed
to contain a spill from the
largest sillgle vessel by one of
the following methods: I.
Liquid-tight sloped or
recessed floors in indoor
locations or similar areas in
outdoor locations. 2.
Liquid-tight floors ill indoor
locations or similar areas in
outdoor locations provided
with liquid tight raised or
recessed sills or dikes. 3.
Sumps and collectioll
systems. 4. Other approved
engilleer systems. Except for
surfacing, the floors, sills,
dikes, sumps and collectioll
systems shall be constructed
of 1I0ncombustible material,
and the liquid-tight seal shall
be compatible with the
material stored. When
30f4
...
~
~
. City of Springfield .
Building Permit & Inspection Summary
6/612006
12:50:35PM
Job #:
COM200S-00S73
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Job Address: 2820 Olympic St Springfield
Scope of Work: Site Work Only
Description of Work: Marcola Substation. Accept plans for
foundation for metalclad switcbgear enclosure
03/29/06.
liquid-tights sills or dikes are
provided, they are not
required at perimeter
openings having an
open-grate trench across the
opening that connects to an
approved collectioll system.
2004 SFC 2704.2.1
Insoections Conducted
Insoections
Special - Plumbing
Filial Site Plan
Commeots
Date
Result
Iosoector
Oil interceptor
Call Mel Oberst at 726-3783 for
final site inspection.
Erosion/Grading Inspection
Ufor Electrical Ground
Foundation
Bolts IlIstalled ill COllcrete
Filial Building
Slab
Temporary Electric
Storm Sewer Line
Storm Sewer Line
Storm Sewer Line
Storm Sewer Line
Slab
sub-called 05117/2005 OK DNG
Perf drains located in gravel 07/26/2005 POK SKG
containment area OK
Pendillg approval of final 08/0812005 POK SKG
08/09/2005 10 SKG
Final 12/02/2005 OK SKG
foundation for switchgear OS/2512006 OK RWC
enclosure
4of4