Loading...
HomeMy WebLinkAboutPermit Correspondence 2006-11-1 FROM :SUB ELECTRIC . FRX NO. :5417262399 ~ov. 01 2006 03:38PM P1 Sprinl!field Utility Board Electric Service Center 100 I Main StrOM Springfhl/d, OR 97477 54'-726-2395 54' ... 744-3752 Fax T(); Lisa, City of Springfield, OR FAX COVER SHEET Date; J//JI2006 Fax #; 541-726-3676 h()m; Nick Anu:J/lIl Number of pages (including cover sheel); 1 If you do "ot receive all the material hei"K h'an,mille,1, ple,.,e call; Mes.,age.,; Lisa. I wish to extend the exnirat;oll date of Snrin.meld Utilitv Board's oermit number COM2005-00573 for our new substation lit 2&20 Olvmnic Street to December 29. 2006. I wn reauestinu this extension becausc of thc tinal undcrl!round conduit eetawavs that mlLqt be iPstalled on the west side urthe nronertv will not he ;nirtalled lmtil the middle of November 2006 and these 2etawavs arc Dlaced in the same location that linallandscauim! is reauired. Althouuh the ~etawavs are not nart oHhe site develonment. the landscaDin!! is. and thc landscaniDI' win bc the fmal obase of the oroiect that will need City annroval. Installation of getaways lifier or durinu the landscaDinl! will ~tlyJ!it14'~ ollr orOl!ress and ultimatelv make a bill mess. r took t'ltword to vour resoonse. NickAmann (744-3711) FRI!.1'1 : SUB ELECTR I C . FAX NO. :5417262399 ~n. 06 2006 10:54AM Pi --:.;, ~: .. :_' -~.'/ Springfield Utility Board Electric Service Celller 100/ Main Street Sprillgfield, OR 97477 54/.726.2395 541 - 744-3752 Fax / ';[2\P ~ J\~' ~ ~V ~ ~ ,- .~~ ~~~ ~,~ r:f ~ ~y~V\#' if",. do ~ -'" '" "" -."".... .~,.;".. pJ- ,./, tqq - J7/1-;j ~ ~ Messages: \}.I' \ , ~ ~.\9.vY FAX COVER SHEET Date: 6/6.12006 To: Lisa, City of Springfield, OR Fax #: 54/-716.3676 From: Nick Amann Number of page. (including cover sheet): 1 Lisa 1 wish to extend the exoiration dn.te of Sorinlltield Utility Roan!'s ocnnil numhe{ COM2005-00573 for our new substation at 2820 01vmoic Street. to Oecembe{ 29. 2006. I am ~lIestinll this extension because the transmission nole. that must be In..talled on the west side of the orooertv will not be installed until late summe{/earlv fall and thesc Doles are nlaced in the same location th...t final landscaoinl' is rec)\med. Althnut'h the noles arc not "art of the site develonment- the landscanine is. and the Jandscaninl! will 1:xJ the Anal oha'lC of the ornicct that will need City annnwaL InstJlllation of transmission Doles after or durin" the landscalline will ,/Headv hinder our orol!1'ess and ultimatelv !Oake a hi go mess. I look forward to Your resoonse. Nick ~ iF~ ,~ . City of Springfield . Building Permit & Inspection Summary 6/6/2006 12,50,35PM Job #: COM200S-00S73 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Job Address: 2820 Olympic St Springfield Scope of Work: Site Work Only Description of Work: Marcola Substation. Accept plans for foundation for metalclad switchgear enclosure 03/29/06. Project Status: Issued Owner & Contractor(s) Address PO BOX 11735 Name CON 2G INC ELC OWNER OWN SPRINGFIELD UTITLlTY BOARD Citv. State. Zi~ Phone EUGENE OR 97440 541-689-3850 1001 MAIN STREET SPRINGFIELD OR 97477 541-746-8451 Valuation of Proiect Occunancv Construction Tvne Cost Per So Ft So Ftl!, Bid Amoullt Bid Amount Use Bid Amount Use Bid Amount Descrintion Amount Paid Temp Power 200 amps or less + 7% State Surcharge + 10% Administrative Fee Plan Review Conun/Illd/Public Storm Sewer - 1st 50 Feet Storm Sewer Each Addtl 100' Fixture Inspectiolls - Investig. Plumb + 10% Administrative Fee Encroachment Pemrit Storm Drainage Impervious Area Site Work + 10% Administrative Fee + 7% State Surcharge + 10% Administrative Fee + 7% State Surcharge Foundation Pemrit + 8% State Surcharge + 10% Administrative Fee Total Amoullt Paid $50.00 $3.50 $5.00 $1,098.60 $45.00 $56.00 $14.00 $45.00 $4.50 $130.00 $3,526.24 $1,690.15 $169.02 $8.06 $7.00 $4.50 $177.60 $14.21 $17.76 $7,066.14 $ 1.00 $ 1.00 446,000.00 18,040.00 Date Valuation Calculated Staff $446,000.00 2005/07/14 TDI $18,040.00 2006/04/21 DLM $464.040.00 Fees Paid Date Paid lof4 Receint # ~- 05/16/2005 05/16/2005 05/16/2005 07/14/2005 07/15/2005 07/15/2005 07115/200:; 07/15/2005 07/15/2005 07/29/2005 07/29/2005 07/29/2005 07/29/2005 08/02/2005 08/02/2005 05/11/2006 05/11/2006 05/11/2006 05/11/2006 2200500000000000586 2200500000000000586 2200500000000000586 1200500000000000998 3200500000000000435 3200500000000000435 3200500000000000435 3200500000000000435 3200500000000000435 2200500000000001014 2200500000000001014 2200500000000001014 2200500000000001014 3200500000000000464 3200500000000000464 1200600000000000640 1200600000000000640 1200600000000000640 1200600000000000640 Plans Reviewed Denartment F.eceived Due Date Comnleted Result Reviewer Comments Initial Review Planning Review 07/14/2005 07/14/2005 07/16/2005 07/17/2005 07/14/2005 APP 07/20/2005 APP SKG EMM To be built per approved Final Site Plan - DRC2004-00015 .. .~ Wit .. 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Public Works Review 07/1412005 Structural Review 07/14/2005 Structural Review 07/2912005 Public Works Review 03/2912006 Structural Review 03/29/2006 . City of Springfield. Building Permit & Inspection Summary 6/612006 12:50:35PM Job #: COM2005-00573 Job Address: 2820 Olympic St Scope of Work: Site Work Only Description of Work: Marcola Substation. Accept plans for foundation for metalclad switchgear enclosure 03/29/06. 0711712005 0712012005 APP SB 07/24/2005 07/21/2005 WE IMP 08/0812005 07/29/2005 APP lMP 04/01/2006 03/2912006 APP SB 04/08/2006 04/18/2006 APP RWC 20f4 Springfield SOCs added for impervious surface. Application for Encroachment Permit required before tapping Stormwater line in Olympic Street. Encroachment fee added. LOAP already issued. See attached document for request for special inspection form completion faxed to Raymond Meduna. Received the Special Inspection forms. Add'l fdn for switchgear encl. Impervious area for this slab already illcluded in plall alld SOCs Add'l foundation for switchgear ellcl. . ~~ 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Fire Department Review 03/29/2006 . City of Springfield . Building Permit & Inspection Summary 6/6/2006 12:50:35PM Job #: COM200S-00S73 Job Address: 2820 Olympic St Scope of Work: Site Work Only Description of Work: Marcola Substation. Accept plans for foundation for metalclad switchgear enclosure 03/29/06. 04/03/2006 04/28/2006 OK AG Springfield Add') fdn. for switchgear encl.Plan Review COM2005-00573. Marcola Substatioll - Additional switchgear ellclosure. Spill control for hazardous materials liquid. Secondary containment to hold largest amount of hazardous liquid and be compatible with liquid. Spill control for hazardous material liquids. Rooms, buildings or areas used for the storage of hazardous material liquids in individual vessels having a capacity of more than 55 gallons, or ill which the aggregate capacity of multiple vessels exceeds 1,000 gallolls, shall be provided with spill cOlltrol to prevent the flow of liquids to adjoining areas. Floors in illdoor locations and similar surfaces in outdoor locations shall be constructed to contain a spill from the largest sillgle vessel by one of the following methods: I. Liquid-tight sloped or recessed floors in indoor locations or similar areas in outdoor locations. 2. Liquid-tight floors ill indoor locations or similar areas in outdoor locations provided with liquid tight raised or recessed sills or dikes. 3. Sumps and collectioll systems. 4. Other approved engilleer systems. Except for surfacing, the floors, sills, dikes, sumps and collectioll systems shall be constructed of 1I0ncombustible material, and the liquid-tight seal shall be compatible with the material stored. When 30f4 ... ~ ~ . City of Springfield . Building Permit & Inspection Summary 6/612006 12:50:35PM Job #: COM200S-00S73 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Job Address: 2820 Olympic St Springfield Scope of Work: Site Work Only Description of Work: Marcola Substation. Accept plans for foundation for metalclad switcbgear enclosure 03/29/06. liquid-tights sills or dikes are provided, they are not required at perimeter openings having an open-grate trench across the opening that connects to an approved collectioll system. 2004 SFC 2704.2.1 Insoections Conducted Insoections Special - Plumbing Filial Site Plan Commeots Date Result Iosoector Oil interceptor Call Mel Oberst at 726-3783 for final site inspection. Erosion/Grading Inspection Ufor Electrical Ground Foundation Bolts IlIstalled ill COllcrete Filial Building Slab Temporary Electric Storm Sewer Line Storm Sewer Line Storm Sewer Line Storm Sewer Line Slab sub-called 05117/2005 OK DNG Perf drains located in gravel 07/26/2005 POK SKG containment area OK Pendillg approval of final 08/0812005 POK SKG 08/09/2005 10 SKG Final 12/02/2005 OK SKG foundation for switchgear OS/2512006 OK RWC enclosure 4of4