Loading...
HomeMy WebLinkAboutPermit Building 1994-7-20 ..- ' '.\. . COM M ERCIALIIN DUSTRIAL PERMIT APPLICATION ~ 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK' 27c:::;r; 19!..y~/I/C- ?C: 4.-/ ASSESSORS MAP' J/7 /'? ~ OWNER: -1_1'11 'UL"!. ADDRESS: ? ~ <:" C ITV' '5),;& p.-;) L . i.4~~ ,FLA;AA/~)~,r; AI/F. STATE: . JOB NUMBER 14/'??tGO INSPECTION LINE: 726.3769 OFFICE: 726.3759 0}(. . TAX LOT: WMr sr Ld- ~ PHO~r:) 11/- -'/17 /.~41-(dO~ (If) 97477 ZIP: DESCRIPTION OF WORK' NEW / REMODEL fij,U ~ J]').i4---T7/br ) I ADDITION DEMOLISH A"rk OTtER I I Nn I I I I I I I I I I I , Permit Issuance I TOTAL PERMIT NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME ADDRESS GENERA' ' 6&AJ..u 4i'il '1 PLUMBING' MECHANICA' ' " ELECTRICA' ' " PLUMBING NO. FEE CHARGE Single Fixture Relocated Bldg, (new fix, addtll Water Service ft. ~anltary Sewer Storm Sewer It, It, Backflow Device TOTAL PERMIT OUAD AREA:~W - OFFICE USE.- 7 LAND USE: 3 <=7,g,g':;: . OF UNIT~' . OF BLDGS: OCCY G RO U p' . OF STORIES' CONSTR. TYPF' HEAT SOURCE: SO. FT. $/SO. FT, SO. FTG MAIN SO, FTG ACCESS SO, FTG OTHER x X x PLAN CHECK FF~ RCPTN DAT~ I BUILDING PERMIT 15% State Surcharn.e I MECHANICAL 15% State Surcharae I PAVING ~~.'50 .....- ;0." - ,,,_ I.SS!> ..i'l: 5% State Surcharge FENCE VALUE $ SIDEWALK I PLUMBING CURBCUT FT, FT, VALUE: PHONE CONST, CO NT RACTO R . EXPIRES PHONE MECHANICAL I CI:IAJiGi I I I I I ~~~ Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or hlg. Mechanical exhaust hood and duct $10,00 HANDICAP ACCESS' FLOOD PLAIN' ZONING:_/ .-/2-II LIGHTING POWER BUDGET: WATER HEATER' VALUE ~PM?>>".J 0/4 TOTAL VALUE OF PROJECT ~4t/f') ,I#-<) BY I DEMOLITION SUBTOTAL PERMITS SYSTEMS DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICA' &7,S"/ . . J"', _--...ill. REQUIRED INSPECTIONS It Is the responsibility of the permit holder to see that all Inspections are made at the proper time, To request an Inspection, call 726-3769 (recorder), state your City designated job number, Job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day. requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms, UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. '\./FOOTINGS & FOUNDATIONS: (' -- ~o be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these Inspections have been made and approved, PAVING: After gravel Is In place but prior to placing asphalt or concrete, CONCRETE SLAB: To be made after all Inslab building servIce equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner I Contractor during construction of the following work, A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS STRUCTURAL CONCRETE: In excess of 2500 PS,I. (306 a,1) STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor Insulation, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all Insulation and requIred vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied, ~~-'-'! "-I~I:' & SEPARATION WALL: Located and constructed according to plans, HIGH STRENGTH BOLTING: Ourlng.all bolt Installation and tightening operations, (306 a,6) UNDERGROUND: Plumbing, electrical. gas, sanitary sewer, storm sewer. water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B,C, Standards 43-8, SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished, GLU.lAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B,C. STDS.25-10,11), STRUCTURAL MASONRY: (306 a,7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415, SIDEWALK & DRIVEWAY: RequIred for all concrete paving within street right of way. to be made after all excavating complete and form work and sub-base material In place. 'In addition to the Inspec. tlons specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code, ROOF SHEATHING AND NAILING: Prior to Installing any roof cover! ng. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. ------------------------------------------------------- FINAL PLUMBING FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project conditions such as landscaping, parking lot striping, etc, must be completed before requesting this Inspection. FINAL MECHANICAL FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' ~4J/~,'/t',J;;..) ~~ / PLANS REVIEWED BY C::\~/hn< DATE '?-28 -5'../ - 1- By signature, I state and agree, that I have carefUlly examined the completed application and do hereby certlfy that alllnformatlon heretn Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project, I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during co~ct1on, y .. ' Slg~e ;;:.a.......-- c;><< A Date ? - 2...0 -?v VALIDATION: /. 7 - AMOUNT RECEIVED: (L?" 5, ( l4-0{) / RECEIPT N' DATE PAID' RECEIVED BY' 7/20/){- ~~ ....---.. "," ., . , , , .' '.' ':".: ..; ......... ,'; .- .::." " ,,'. " '.".~ :.~~~~.. :: .... , City of Spr'illgficld 225 Fifth Street Sppingficldi OR 97'77 (503) 72f..-3'?S3 ..; t Tp;:H\SiJct :~on nllll.her' 01,1tOOl Jul~ 2G~ 1994 LO;3i A~\ Rccc) vpc~ T(':):ll: 1..0NN':: MOFSE .:., C:ontr'::Jcl'/O\JJn : 'Addr'css~ 555 FLAMINCO , , " :-e , .... .... , , . : , ' ..' . Cit.,..~ SPFD St :; OR Z:tp: ~':;74T/ -Huili.iil'\q- Job ~. ,1010960 [lcscr':ll)\;'i.on ;;;'. ,'. BlJi.ll~!i,rHJ S~;;:it.C Slwch;)('\}c :. : ..' 3~~ r~(llnH\ FQ0 Tot.,),l: '..';' r:..: t.. ."".-- . .,~ t"Uf,t ~:e('ci '-Ied-: .' ~~ ,.., I t':',{ . 'wi.. Chfi'ck :~: 7 Th~n~ you, Don M. 62.~O ~L 13 ,i..liB t,:'\f.:C:~ r{'\(:'! , :',..:::;'. .... , " '" .' .:.... ''-'l...:'::' '. "::':. ". . . /,:' .....1 '..... ;'. ;.-...,'.,.. .,-.' ........ '. .... .... '.:. .; -.' -' ':" .: :~ .:. .... , '" .~..;. ~ . .... .... . . J08 NO. 9~~9~o CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET (PROFESSIONAL OFFICES ~USTR~ NAME OR COMPANY: '.1~ $~ - , LOCATION: .21.ro cJ.L. #'! 4d. / ,- DEVELOPMENT TYPE: ~,~L/ (.-uH~d~.) BUILDING SIZE: LOT SIZE SQ. Ft. 1. STORM DRAINAGE IMPERVIOUS SQ. FT. 0.5 x ... ~01~ X SO.203 PER SQ. FT~;t/..2'.'iJ'?J ............ .-' 27 SANITARY SEWER-CITY NO. OF PFU'S 0.5 X (See Reverse) 3. TRANSPORTATION NO OF UN~P RATE X COST PER TRIP JoMNVt:,.4c.TtJIUNfr THouSAND 5~. FT. 0.5 X O. '1s X J.1$ X S424.31 ~ X S42.08 PER PFU rs-/OS".2~ '-- -- 0.5 X 0.5 X X X X $424.31 X $424.31 r;-r..o~. r,.~ ............ "./ S s 4. SANITARY SEWER-MWMC NO. OF PFU'S S- x $15.125 PER PFU + $10 MWMC ADMIN. FEE S ~~.~ 3 (Use PFU Total From Item 2 Above) I:. . . (. . ....,.'.:. S 48,/S' TOTAL-MWMC SDC ~ MWMC CREDIT IF APPLICABLE (SEE REVERSE) "::. :,' SUBTOTAL (ADD ITEMS 1,2,3 & 4) L/4r..o:/.s- -5. ADMINISTRATIVE FEES BASE CHARGE (SUBTOTAL ABOVE) X .05 ~ 13.0;) -...... .-/ 4.' :~. ~~....l '. 7~ ....?c:' -9'fl TOTAL SDC S IS' 3.J./~ oordinato _,~ ,\',... _I ':..... ~.. ~ ....... . _ ,.. - FIXTURE UNIT,CALCU ~ION TABLE: Number 01 New Fix1ure Unit Equivalent = Fix,urc Units (NOTE: For remodels. calculate only the ~lddi:ional fi'1ures) NUMSER OF UNIT fiXTURE fiXTURE TYPE NEW fiXTURES EOUIVALENT UNITS Bathtub..................,........,.."",...""".." "..", ..........,.., Drinking Fountain,..,."", ",' """,' '.', .'"" ...."."..',., ..".. Aoor Drain.......,....,..,.,.....,.,...,."'., .,., '" ,....'."....,.".". Intercepto~ For Grease/Oil/S.olids/Etc................. Intercepto~ For Sand/Auto Wash/Etc.................. Laundry Tub /Ootheswasher............ ....................... Ootheswa~er - 3 Or More..................................... MobUe H6me Park Trap (1 Per Trailer)....:...:.::.....:- '" Recep~or FiJr Refrigerator /Water Station/Etc........ Receptor For Commercial Sink/Dishwasher/Etc.. Shower. Single' Stall...... ................ ........................... _ Shower. Gang...................,....................................... Sink. Bar, COmmercial............................................. . Urinal, StallfWali.:..................................................... Wash Basin/Lavatory. Single.................................. Water Ooset, Public Installation............................. Water Ooset, Private............................................... Miscellan.eous: " 2 1 2 3 6 2, 6 6 1 3 2 I/Head 2 2 1 6 4 / ';.. 4 TOTAL FIXTURE UNITS c , ~ CREDIT,CALCULATION TABLE: calculate credits separates. II . . ,"",.4 .~!. . " , .", .~", ' Based on assessed value. If improvein~nts occurred, alter annexation date in table, Rate per $1,000 Assessed Value S 2.24 1.93 1.57 1.18 0.79 0.44 I 0.28 , I = ..,~./ 5- = ,;--- = $ 46,/S- Year Annexed Rate per S 1,000 Assessed Value Year Annexed 1979 or before 1930 1981 1982 1983 1984 '1985 $3.21 3.13 3.08 2.95 2.82 2.68 2.51 ,1986 1987 1983 1989 1990 1~1 1~2 ~ed;j (or Parcel or Land Only If Applicable 3..2. / X $ /5'. ~ (Rate X Assessed Value) X $ (Rate X Assessed Value) CREDIT TOTAL Improvement Cd alter annexation date) 0, .' '.,. RUNOFF COEFFICIENTS FOR STORM DRAINAGE . _.~ ." ~ . .~. <. . Residential........................................................ 0.4 COmmercial...................................................... 0.9 Industrial.......................................:..:................ 0.45. Governmental..................................:................ 0.5 . IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT