Loading...
HomeMy WebLinkAboutPermit Building 1995-12-26 . Page 1 ." . 951545 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 2355 OLYMPIC ST Assessors Map #: 17032541 Tax Lot #: 01002 Owner: OREGON METRO C.U. Address: 862 BETHEL DRIVE Phone #: 688-7149 City/State/Zip: EUGENE, OREGON 97402 Description Of Work: CREDIT UNION NEW Value: 0.00 Name Address Phone Architect: TBG ARCHITECTS 13L ~ 8Y'B4.d.wvj $ie alO ~ ~f' 7- (QI 0 Canst. Contractor Contractor # Expires Phone General: LEE CONSTRUCTIO 0063579 01/16/96 683-3607 PO Box 10367 Eugene OR 9744000.80 Plumbing: HARVEY & PRICE 0000077 10/31/95 746-1621 PO Box 1910 Eugene OR 974400000 Mechanical: HARVEY & PRICE 0000077 10/31/95 746-1621 PO Box 1910 Eugene OR 974400000 Electrical: BUILDERS ELECTR 000~296 12/10/95 485-0922 PO Box 10021 Eugene OR 974010000 --- PLUMBING --- No. 9 Fee Charge 90,00 40.00 55,00 130.00 10,00 Single Fixture Sanitary Sewer Water Service Storm Sewer BACKFLOW DEVICE 118 202 692 ft. ft, ft. TOTAL PERMIT 325.00 - - - MECHANICAl. - - - No. Fee Charge 18,00 12.00 10,00 4 Furnace/burner & vent < 1000,000 BTUs Vent Fan/Single Duct Permit Issuance TOTAL PERMIT 51. 00 HANDICAP ACCESS: Y # OF BLDGS: 1 -- OFFICE USE QUAD AREA: 2CNW ZONING CODE: MRC LAND USE: 5300 OCCY GROUP: B2 Item Square Feet x a/Square Feet Value Job Number: 951545 Page 2 Sq, Ftg Main SITE IMPROVEMENTS 4160 393,000,00 107,000,00 TOTAL VALUE OF PROJECT 500,000.00 Plan Check Fee: 550,55 Rec #: 19136 Date: 09/27/95 Rec By: LORNE PLEGER BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PAVING VALUE 107,000.00 PLUMBING Surcharge/Admin SIDEWALK CURBCUT ADDITIONAL PLAN REV, 1,092.25 87.38 51. 00 3.28 448.75 325.00 26.00 33,40 19.60 159.41 SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 2,246.07 43,98Y.9l& 46,234.0f"' TOTAL PERMIT FEES EXCLUDING ELECTRICAL REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following 11*" work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code, UNDERGROUND PLUMBING - Prior to filling trench. UNDERGROUND ELECTRICAL - Prior to Cover. TEMPORARY POWER FOOTING - After trenches are excavated, FOUNDATION - After forms are erected but prior to concrete placement. SLAB - To be made after all ins lab building service equipment, conduit piping, and other equipment items are in place but prior to concrete ROUGH PLUMBING - Prior to cover, ROUGH MECHANICAL - Prior to cover, ROUGH ELECTRICAL - Prior to cover. ELECTRICAL SERVICE - Must be approved to obtain permanent power. FRAMING - Prior to cover, INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover ,re:M<...I#~~c:.T/4'Y7- 7T"q~r. ~t..t>> ~ # ~ ~ ~4Lrs..... , Job Number: 951545 Page 3 DRYWALL - Prior to taping. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete, FINAL FIRE - When all Fire Department requirements have been met, been met, ROUGH GRADING - After gravel is in place but prior to placing concrete CURB CUT - After forms are erected but prior to placement of concrete, SIDEWALK - After excavation is complete, forms and sub-base material in place. FINAL SITE PLAN - After all requirements have been met for Minimum Development Standards or from the Development Agreement. FINAL BUILDING - When all required inspections have been approved and the building is complete, --- ADDITIONAL COMMENTS DRC #95-08-162, PLANNER IS GARY KARP JOURNAL NO. 95-08-162, GARY KARP PLANNER Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 12/20/95 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. yJ~-_-I ^..~L Signature - -- &.e. ~...,.+ /~ht /9~ Date - -- VALIDATION Receipt Number: ~~$;>.,.. Date Paid: /2- 2?.e; c;-- dt;2"3"'~ Amount Received: Received By: , ~ ,,-~J? //- . .if. I' , . CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL I RESIDENTIAL) Name or Company: OREGON METRO C.U, Location: 2355 OLYMPIC ST Developement Type: C Building Size: 1. STORM DRAINAGE Impervious Sq Ft 22679 X 0.210 Per Sq Ft = 2. SANITARY SEWER - CITY Number Of PFUs 16 X 013.43 Per PFU (see Page 2) 3. TRANSPORTATION Number Of Units 4.160 X X Trip Rate 20.000 X X Cost Per Trip 437.93 = Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 16 X X Per PFU + 18.750 + MWMC Admin Fee 10.00 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2. 3 << 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Job No.: 951545 Lot Size: $36,435.78 Date: 10/05/95 Page 1 Sq Ft $4,762,59 $694.88 $36.435.78 = $310.00 $309.94 $0.06 $41.893.31 $2,094,67 $43.987.9S ....... , .... Job Number: 951545 . FIXTURE UNIT CALCULATION TABLE Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry 'Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS = Number of New Fixture Unit Equivalent Fixture Units o o o o o o o o o o o o o 4 2 o o 2 1 2 3 6 2 6 1 3 2 o o o o o o o o o o o o o 4 12 o o 2 2 1 6 4 16 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: 1969 Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : 89,320 X 3,47 = 309.94 o X 3.47 = 0.00 CREDIT TOTAL = $309.94 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)