HomeMy WebLinkAboutPermit Building 1995-12-26
.
Page 1
."
.
951545
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 2355 OLYMPIC ST
Assessors Map #: 17032541
Tax Lot #: 01002
Owner: OREGON METRO C.U.
Address: 862 BETHEL DRIVE
Phone #: 688-7149
City/State/Zip: EUGENE, OREGON 97402
Description Of Work: CREDIT UNION
NEW
Value:
0.00
Name Address Phone
Architect: TBG ARCHITECTS 13L ~ 8Y'B4.d.wvj $ie alO ~ ~f' 7- (QI 0
Canst.
Contractor Contractor # Expires Phone
General: LEE CONSTRUCTIO 0063579 01/16/96 683-3607
PO Box 10367 Eugene OR 9744000.80
Plumbing: HARVEY & PRICE 0000077 10/31/95 746-1621
PO Box 1910 Eugene OR 974400000
Mechanical: HARVEY & PRICE 0000077 10/31/95 746-1621
PO Box 1910 Eugene OR 974400000
Electrical: BUILDERS ELECTR 000~296 12/10/95 485-0922
PO Box 10021 Eugene OR 974010000
--- PLUMBING ---
No.
9
Fee
Charge
90,00
40.00
55,00
130.00
10,00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
BACKFLOW DEVICE
118
202
692
ft.
ft,
ft.
TOTAL PERMIT
325.00
- - - MECHANICAl. - - -
No.
Fee
Charge
18,00
12.00
10,00
4
Furnace/burner & vent < 1000,000 BTUs
Vent Fan/Single Duct
Permit Issuance
TOTAL PERMIT
51. 00
HANDICAP ACCESS: Y
# OF BLDGS: 1
-- OFFICE USE
QUAD AREA: 2CNW
ZONING CODE: MRC
LAND USE: 5300
OCCY GROUP: B2
Item
Square Feet
x
a/Square Feet
Value
Job Number: 951545
Page 2
Sq, Ftg Main
SITE IMPROVEMENTS
4160
393,000,00
107,000,00
TOTAL VALUE OF PROJECT
500,000.00
Plan Check Fee: 550,55 Rec #: 19136 Date: 09/27/95
Rec By: LORNE PLEGER
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PAVING VALUE 107,000.00
PLUMBING
Surcharge/Admin
SIDEWALK
CURBCUT
ADDITIONAL PLAN REV,
1,092.25
87.38
51. 00
3.28
448.75
325.00
26.00
33,40
19.60
159.41
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
2,246.07
43,98Y.9l&
46,234.0f"'
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time, To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following 11*" work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code,
UNDERGROUND PLUMBING - Prior to filling trench.
UNDERGROUND ELECTRICAL - Prior to Cover.
TEMPORARY POWER
FOOTING - After trenches are excavated,
FOUNDATION - After forms are erected but prior to concrete placement.
SLAB - To be made after all ins lab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
ROUGH PLUMBING - Prior to cover,
ROUGH MECHANICAL - Prior to cover,
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAMING - Prior to cover,
INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover
,re:M<...I#~~c:.T/4'Y7- 7T"q~r. ~t..t>> ~ # ~ ~ ~4Lrs.....
,
Job Number: 951545
Page 3
DRYWALL - Prior to taping.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete,
FINAL FIRE - When all Fire Department requirements have been met,
been met,
ROUGH GRADING - After gravel is in place but prior to placing concrete
CURB CUT - After forms are erected but prior to placement of concrete,
SIDEWALK - After excavation is complete, forms and sub-base material
in place.
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement.
FINAL BUILDING - When all required inspections have been approved and
the building is complete,
--- ADDITIONAL COMMENTS
DRC #95-08-162, PLANNER IS GARY KARP
JOURNAL NO. 95-08-162, GARY KARP PLANNER
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 12/20/95
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
yJ~-_-I ^..~L
Signature - --
&.e. ~...,.+
/~ht /9~
Date
- -- VALIDATION
Receipt Number:
~~$;>.,..
Date Paid:
/2- 2?.e; c;--
dt;2"3"'~
Amount Received:
Received By:
,
~ ,,-~J?
//-
. .if.
I'
,
.
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL I RESIDENTIAL)
Name or Company: OREGON METRO C.U,
Location: 2355 OLYMPIC ST
Developement Type: C Building Size:
1. STORM DRAINAGE
Impervious Sq Ft 22679 X 0.210 Per Sq Ft =
2. SANITARY SEWER - CITY
Number Of PFUs 16 X 013.43 Per PFU
(see Page 2)
3. TRANSPORTATION
Number Of Units
4.160 X
X Trip Rate
20.000 X
X
Cost Per Trip
437.93 =
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
16
X
X
Per PFU +
18.750 +
MWMC Admin Fee
10.00
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2. 3 << 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
TOTAL SDC
Reviewed By: TROY MCALLISTER
Job No.: 951545
Lot Size:
$36,435.78
Date: 10/05/95
Page 1
Sq Ft
$4,762,59
$694.88
$36.435.78
=
$310.00
$309.94
$0.06
$41.893.31
$2,094,67
$43.987.9S
.......
,
....
Job Number: 951545
.
FIXTURE UNIT CALCULATION TABLE
Page 2
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry 'Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS =
Number of
New Fixture
Unit
Equivalent
Fixture
Units
o
o
o
o
o
o
o
o
o
o
o
o
o
4
2
o
o
2
1
2
3
6
2
6
1
3
2
o
o
o
o
o
o
o
o
o
o
o
o
o
4
12
o
o
2
2
1
6
4
16
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed: 1969
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
89,320
X
3,47 =
309.94
o
X
3.47 =
0.00
CREDIT TOTAL =
$309.94
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)