Loading...
HomeMy WebLinkAboutPermit Electrical 1999-8-17 The following project as submitted has the following zoning. and does nol require specific land use 225 FIFTH STREET aQproval. f'Vl , SPRINGFIELD, OREGON 9/477 'n '-\../ INSPECTION REQUEST: 726-3~?j\j g f'l..- \ ~ .Gl q OFFICE: 726-3759 Date . Aufhorized Signature~ ? 1. LOCATION OF :!;!!STALLATION ;)r79t) V("",>1 ,,?,r . A. ) j ~GAL DESCRIPTION /70 ( ~42 j,f O/SV/. J...QB DESCRIPTION (' / f(('/1&.(~ 4- fZX;ITy UniT; / . Permits are non-transferable and expire if work is not started within 180.days of issuance or if work is suspended for 180 days. 2. CONTRACTOR INSTALLATION ONLY .B. r Electrical ContractordJ;1::""" Aik: AddressJl'ft".5 St-J /i~:J / . Ci ty !il'/1li~ Phone ~27}J.)$ Supervisor License Number j ') ~t: t-;J \ Expiration Date /~ /0 V . Constr Contr. Number t:ffd7 . EXPira~::n n:Z ~/X-)O C~ign7~uPz::;:.-:;t:cian u;aN~ . , O'l7V:e ~-Ia'l .J- I j Address ;)6"!u i)~'_/> Cityrf,.iJ Phone 736oS-t/{) OlINER INSTALLATION The installation is being made. on property I own which is not intended for sale,. lease or rent. Owners Signature: -----------------------~.~------------- DATE: ~/7/JJ' RECEIPT *: :<. ~A.3..1. '? . RECEIVED IlY: ~V/ ELECTRICAL PERMIT APPLICATION . Ci ty Job Number q 91/23 ':':'JRlLETE FEE SCHEDULE BELOII New Residential-Single or Multi-Family per dwelling unit. . Service Included: 1000 sQ.ft. or less Each additional 500 SQ. ft or portion thereof Each Manuf'd. Home,or Modular, 'Dwelling Service or .Feeder Services or Feeders Installation, Alterations or Relocation: 200 amps or less . 201 amps to 400 amps 401 amps to. 600 amps 601 amps to 1000 amps Over 1000 amps/volts Reconnect Only Items Cost Sum S 85.00 $ 15.00 .$ 4b.00 $ 50.00 $ 60.00 $100.00 $130.00 $300.00 $ 40.00 C. Temporary Services or Feeders Installation, Alteration or Relocation 200 amps' 'OT less 201 amps to 400 amps Over 401 to 600 amps Over 600 amps or 1000 volts D. Branch Circuits $ 40.00 $ 55.00 $ 80.00 see "B" New, Alteration or Extension Per Panel .' One Circuit -I Each Additional Circuit or with Service or Feeder Permit _..3 $ 35.00 ~ $ 2.00 L not included) Miscellaneous (Service/feeder -Each installation . Pump or irrigation. Sign/Outline Lighting Limited Energy/Res Limited Energy/Comm E. 5. SUBTOTAL OF ABOVE 1'bS ta te Surcharge 37. Administrative Fee TOTAL $ $ $ $ . .4/0@ r-' 40.00 40.00 20.00 36.00 1'5./0 ...- ,..~ . COMMERCIAL/INDUSTRIAL PERMIT APPLICATION 225 Fifth Street, :;lpringfield, Oregon 97477 L 2~~ 2S ~1- LOCATION OF PROPOSED WORK' ASSESSORS MAP' J7n~ OWNER' ~TlJX(!-- ?-u ADDRESS: i 1 J. '7 #j?/ t:' r M/'~ - - ,- CITY: / ~ A1AVcd DESCRIPTION OF WORK: A'~tfd: -1 ~ ~l ;o,,tJ ./ J;!J.;., 7J. \. /!JT) 0 1TlQ....&7U , F\ PLAN CHECK FEF RCPTN DATF I BUILDING PERMIT PLUMBtNG I >(;1,Stale /;1" Stale Surcharo.e :surcharQe MECHANI~ $,Q.- FENCE . . #Sru, ~..~ VALUE $ 7%Stale ;;:.- I SIOEWALK Surcharae FT. I PAVING I CURBCUT FT. NEW REMODEL ~ ADDITION NAME ARCHITECT' CONTRACTOR'S NAME ADORESS GENERA' . PLUMBING: )( MECHANICAl' ,4 k/ -;;:;-7'" /Z'tri. 7/lr . . / . <:;::;,.,,,.. , , >( ELECTRICA' . PLUMBING NO, FJ:=~ r."I\RGE Single Fixture Relocated Bldg. lnew fix. addU) Water Service It. Sanitary Sewer fl. Storm Sewer fl. Backflow Device TOTAL PERMIT OUAD AREA' LAND USF' . OF BLDGS: . OF UNIT~' OCCY GROUP' CONSTR. TYPF' HEAT SOURCE: . OF STORIE~' So. FT. SO. FTG MAIN SO. FTG ACCESS SO. FTG OTHER x x X . ~ 99//2.3 JOB NUMBER INSPECTION LINE: 726.3769 OFFICE: 726.3759 t"J~~..v'/(,_ / ' (') J 58 / TAX LOT: PHONE: ~/o- ~.2.7 -?, '3~ STATF' LA- . ZIP: q n ~C)/ DEMOLISH OTHER VALUE: ADDRESS PHONE CONST. CONTRACTOR' EXPIRES PHONE .::JHf5" ScI (!dbr.....ifCc:! !;;/..~r//? ttP~ P?Cl7C1 J / I ~I 141 I I I I I I I I I I I I I I I I I I TOTAL PERMIT fI,IFr.HeNIr.ef I FF~AliCiI 70S-ole' 11.~ I . I I I I I I I I Furnace/burner & vent < 100.000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or I1lg. Mechanical exhaust hood and duct I $10.00 I I ~o)-I Permlllssuance - OFFICE USE - HANDICAP ACCESS' FLOOD PLAIN' ZONING: LIGHTING POWER BUDGET: WATER HEATER: $/SO. FT. VALUE TOTAL VALUE OF .PROJECT BY DEMOLITION I SUBTOTAL PERMITS I SYSTEMS OEVELOPMENT TOTAL PERMIT FEES I EXCLUOINGELECTRICAI "",,3Jif) , --' REQUIRED (j/lU ~#; INSP~CTION" 99//2.3 ';).t) ., t:) OL.Vp(A.le I .. -- It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, lob address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these inspections have been made and approved. PAVING: Alter gravel Is In place but prior to placing asphalt or concrete. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. FIREPLACE: Prior to placing facing materials and before Iramlng Inspection. FRAMING: To be made after the roof, all framing, lire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanIcal are approved. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Perlormed on the job. (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYEO ON FIREPROOFING: U.B.C. Standards 43.8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made alter all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25.10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In place. Oln addition to the Inspec. tlons specified, the Building Official may make or require CURB AND APPROACH other Inspections of any ROOF SHEATHING AND APRONS: After forms are construction work to ensure NAILING: Prior to Installing erected but prior to placing compliance with the Building, any roof covering. concrete. City or Development Code. ------------------------------------------------------- FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. x FINAL ELECTRICAL FINAL BUILDING: Requested alter the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the BuildIng Division FINAL FIRE DEPARTMENT and posted on the premises. ADDITIONAL COMMENTS: ~J">JJT"'d.J' .FiJW. Tt+E. NBJJ UNtTS ,'ilti!!rLL ~tr LU~7JI ,I1,((~ti'T CO~E A!€fjUIKe~<l'- {A!' (.J}~,r6AA;m,,~LE. ~armr~. y FINAL MECHANICAL , PLANS REVIEWED BY DAT~ By signature, I state and agree, that I have carefUlly examined the completed application and do hereby certify that aI/Information herein is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be mage of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card ts located at the front of the property, and the approved set of plans will remain on the site at all times during construction. "/< ~ Signature Dat~ VALIDATION: AMOUNT RECEIVEO: ??:!j ./0 ~ .... 24S RECEIPT .. DATE PAID: RECEIVED BY: g,ij ?/ 5' 5' ,~~n,~