HomeMy WebLinkAboutPermit Building 1988-10-25
....,'l
.
CITY UF SPRINGFIELD
COMBINATION APPLICATION/PERMIT
EIIERGY SOURCES:
Heat
I~ater Heater
INFDRl1ATlON LlNl
726-3753
Sq. Ftg. '.Iain
~q. Ftg. Access.
Sq. Ftg. Other
!lew Add Alter Rep.
Range Fence__Demo__Change/Use
ValuE of 1-11/: 0; Of) [) _Other
BUlltiinQ Permit info: Descr,be Work(i.e., Build Single
Fam~)I nesidence I-lith Attached Garaael
1VA11~oLe)I oj /lduA./
-;tf~.L -
~ (1;cs. na,l lexoiresl lohooe 00. ~
.
. !
INSPECTION LINE
,726-3769 _
I:
Job Address 20 SO U. ""- '.f'--""
Legal Description 17"l1P3-'2.~?/. h~
/
D\)
d
~
/) / ; 0 f/Q1.) ~iUu,~ )
Address 5 Lief -S!~'/J1"117~tM ~ ./I/;6aoe ~f/r~
(:A~ '01/< ~ / ZZz,
coostruct~o~Lender / q7~ /
Address/~ ~ /!;;JJdA<-r-;!; ~(!P :oe
DESIGN lTE ~ name t (address)
Owner.
I
Primary
Structura 1
c.6 J I ;-)VV
Electrical
Mechanical
CONTRACTORS
Genera 1
(name) I
r1l diA1t/d
"
~
~5
(address)
Lt /If /1 rot If
(lie.;. no.'
(pxnirpc;,)
(ohnnp nn. ,
-719/~/
/(;/R<j
..q~ V'"No I
,
Plumbino
Electrical
1(.....1,
/
~1echanical
PLUIIB I NG
ELECTRICAL
I
I=I=~ rl.lJ1RG.E. ..liQ.....
MECHANICAL
NO.
FEF rHARt,F Nn
/
Each single fixture
Residence of
n~ ru~
SQ. FT.
furnace/burner to
BTU's
Relocated building
(new fix. additional)
/ -New circuits alts.
or extensions
o"'2.",s;;;?~ne
SERVICES
~
Floor furnace
and vent
S.F. Residence
(1 bath 1
Duplex (1 bath) each
Additional bath
Recessed wall
~nArp hp~tpr ~nrl vpnt
~Iater servi ce
Appliance vent
!=.pni"r;at".
Stationary evap.
cooler
Vent fan wi th
sinale duct
Vent system apart from
heatinq or A.C.
Mechanical exhaust
hood itnd durt
Temporary Construction
Change in existing
, rPs. i rtPJH~P
Imultifamily, comm. or
Indll~triitl
IOf amps.1
ICO~1./IND. FEEDERS I
l'Install/alter/relocate I
rli~t_rih_ fpprlpr~
IOf amps.1
I
I
I I SSUANCE OF PFRIIIT
TOTAL CHARGES )??rl""/ ./.'::: ~ TOTAL CHARGES ~,5i> TOTAL CHARGES
WHERE STATE L"l~ REQUIRES that the Electrical work be done by an"Electrical Contractor, the electrical portion of this pernit
shall not be vali~ until the label has been signed by an Electrical Supervisor and returned to the Building Division
Sewer
Storm Sewer
Wood stove/heater
I HAVE CAREFULLY EXAMINED the completed application for permit. and do hereby certify that all information hereon is true
and correct, and I further certify that any and all work oerformed shall be done in accordance with the Ordinances of the City
of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that UO OCCUPAllCY will be made
of any structure without the permission of the Building Division. I further certify that my registration with the Builder's
Board is in full force and effect as required by ORS 701.055, that if exempt the basis for exemption is noted hereon, and that
only subcootractors ::l)p~:~es :ho\aAre:~O:~i~nce with ORS 7nl. il1\Abe~S:ud a~ thiS, p p~ 10:::
1lAt-IE(please print) .L.Jl.-' <...:::> '^-' 1<:' Y~'-'-- SIGIlATU !.l'/C/I }rJV?:V~ DATJL)Qs-cB2>
FOP. OFFICE USE
Sq. Ftg.
Sq. Ftg.
Sq. Ftg.
Tyae/Const. ~?7/P Units
Bedrooms Occy Load
Stories I Occy Group
Zone L /'?? .z?
PLUliB ING PERMIT
Charges and_..... ...:-.
Surc~arges ~
ELECTRICAL PERIHT
Charges and t..-{
Surcharges
--~~--
/ :Y~~
" ~--J~~__
-7S-
~Z~SO
------------
/-0'
'ff - "'2..
(T)
Plan Ck. Comm/Ind
65%/Bldn P~r F..
Plan Ck. Res
30%/Blda Per Fee
r1ain )( Value
Access x Value
Other ~~ ~,f..,... <<:"<'481ue
TOTAL VALUATION
~~
>
~
Fire Zone
Flood Plaio
BUILDING PERfllT
Charges anrl .,
Surcharges ,..
/0 -..25-?f
lNS~, /2b5'{o
Systems Development
Charqe tI.5~) .
/14-
MECHANICAL PERMIT
Charges and
Surcharges
.
COMBINATION APPLICATION/PERMIT (CAP)
I. Applicant to furnish
A. Job Address
B. Legal Oescription
1. example- Tax Lot 100, Lane County Map Reference
17 03 43
2. exam~le- Lot 1. Block 3, 2nd Addition to
~pringtield Estates
C. Name. etc. of owner and construction lender
o. Energy Sources
1. exam~le- heat/electrical ceilinq/or forced air Qas
2. exa~le- waterheater/electrlcal/or solar
E. Square footage or valuation, etc.
1. examole- 1250 sq. foot house, 500 sq. foot garage
2. example- if new project, check new - if addition.
check add, etc.
F. Building pennit information:
1. exam~le - construct single family house with an
attached garage
2. examele - remodel existing garage into family foam
3. example - convert single family residence into
restaurant (change of use)
G. Value of work as defined in Section 303 (a) of the
Structural Specialty Code
H. DESIGN TEAM ANO CONTRACTORS
To avoid design or construction delays. Building
Division Staff must be able to contact appropriate
persons regarding design information or job site
corrections, etc.
II. Abbreviated Plumbing, Mechanical, &. Electrical Schedules
A. Except where blank spaces occur in the description
portion of the Mechanical and Electrical Schedules,
the applicant need fill-in only the No. Boxes adjacent
to the appropriate item(s) to be installed
B. Full Plumbing, Mechanical, and Electrical Schedules
are available at the Building Division
1. To conserve space on the permit form the schedules
have been abbreviated
2. If the item(s) to be installed are not covered on
the abbreviated schedules you should consult the
full schedules
C. BUILOING OIVISION STAFF WILL FILL OUT ALL FEES ANO
CHARGES ON THE SCHEDULES
D. As noted on the CAP, the label must be delivered to the
electrical contractor for Signature by his electrical
supervisor. The general contractor is.not authorized
to sign the electrical label. ---
III. Applicant to sign and date
Whenever possible, the initial application will ba used as
a worksheet only. Where possible, Building Division Staff
will prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
signature.
IV. Fees and Charges
Plan check fees are due and payable at the time of the
application, and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable when the permit is issued.
V. FOR OFFICE USE ONLY
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPANCY:
.
PERMIT VALIDATION
)~7(f{)
/(-/,--f%
Permit Clerk
('1/
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information:
'. . ~.'
PLANS REVIEWED 8Y:
name LdR //€ ~~~
signature ~~
'r
. .
:~..
-'t-..J
,
.\
~,
. ~--r.> date /.0-25" 88
,
,>~~
..
.. Required
.
IT IS THE RESPONSIBILITY OF TilE PER.'lIT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT THE
THAT EACII ADDRESS IS READABLE FROII TI'E STRF.ET, ANn THAT TilE PER....lT CARD IS LOCATED AT TilE
PROPERTY. BUILDING DIVISION APPROVED PLANS MUST BE ON JOB SITE AT ALL TIllES.
Inspections ..
.
PROPER TIl.IE,
FRONT OF THE
PROCEDURE FOR REQUESTING INSPECTIONS: Call 726-3769 (recorder) state you CITY DESIGNATED JOB Nu}IBER,
job .:lddrcss, type of inspection ret]uested and \olhcn you will be re.:dy for the inspection. Contracto:-s
0= O\n1ers name and phone n~~ber. Rcquest~ received before 7:QO am will be ~ade the same day, requests
received after 7:00 am will be ~de the followin~ work d~y.
Your City Designated Job Number Is: ~~9:>?
Job Address: -:Zt?,-::;-~ r'?.::: Y'/?'7'p/c ~r
~~ lr0aoG/4.#RY'S
Contractor: !?..,,/--J,s:; W~i');e=cL.':::
o
o
D
SITE INSPECTION: To be made
after excavation. but prior
to setup cf forms.
UNDERSLAB PLUlIBING. EI.ECTRICAL
& ~ECHANICAL: To be made before
any work is covered.
CONCRETE SLAB INSPECTION: To be
made after all ins lab building
service equipment, conduit, piping,
accessories and other ancillary
equipment items are in place but
before any concrete is poured.
D
~
FOOTINGS ~ FOUNDATIONS: To be made
after trenches arc excavated and
forms are erected, all steel in
place. but prior to pouring concrete.
UNDF.RGROUND: Plumbing, Electrical.
Gas, Sanitary Sewer, Storm Sewer,
Water and Drainage lines. To be
made prior to covering or filling
trenches.
D
D
UNDERFLOCR:. Plumbing. Electrical,
Mechanical. To be made prior to
install3~ion of floor insulation,
decking or floor sheathing.
POST & BEAM: To be made prior to
inStallation of floor insulation,
decking or floor sheo:.ting;.
FLOOR INSULATION ~ VAPOR BARRIERS:
To be made prior to inst311~tion
of decking or floor sheating.
~~SONRY: Steel location, bond beams
grouting or verticals in accordance
with U.B.C. Section 2415.
D
D
D
o
1EJ
ROOF SHEATHI~G k~D NAILING: Prior
to installing any roofing. ~ 0
ROUGH PLL~IBING. ELECTRICAL ~ , '2, '.
Ll~("Il^"ICl U: No ~ork is to be cm'ered
until these inspections have been
made and approved.
-::l"l
~ FINAL PLUM91NG
1../")
[Xl FI~AL ELECTRICAL
o
)'1
[E]
o
o
o
o
[ZJ
II
o
o
o
Phone:...J99-/-::?:::<"2 ;;-~E/?7
"'
Phone: 7r.::-Y-;7C/?5/
---- -
ATTIC DRAFT STOrS ~ CURTAIN WALLS.
FIREPLACE: Prior to placing facing
materials and before framing
inspection.
INSULATION ~ VAPOR BARRIER: To be
made after all insulation and
required vapor barriers arc in place
but before any lath or gypsuc board
interior wall covering is applied.
FRAMING: To be made after thc roof,
all framing, fire blocking and
bracing arc in place and all pipes,
chimneys and vents are complete and
the rough electrical, plumbing and
heating wires, pipes and ducts arc
approved.
:J
LAm AND/OR GYPSlll-I BOARD I~SPECTION: :J
To be made after all lathing and
g)~sum board, interior and exterior,
is in place but before any Plastering:J
is applied or before gypsum bo~rd
joints,and fasteners are taped and
finished.
FIRE ~ SEPARATION WALL: Located ~
censtructerl according to plans.
WooDSTOVES:
completed.
SIDEWALK & DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURS AND APPROACH APRON: After forms
are erected but prior to pouring
concrete.
After installation is
PARKING LOT: After gravel
place but prior to placing
or concrete.
is in
asphalt
SPECIAL INSPECTIONS: In accordance with
Section 306 of the Building Code a special
inspector shall be employed by the Ownerl
Contractor during construction of the
following work. A copy of the special
testing reports shall be furnished to the
Building Division.
:J
:J
:J
STRUCTURAL CO~CRETE: In excess of 3000
'P.S.I. (306 a.1)
STRUCTUR~L WELDS: Preformed on the
job. (2722 f)
HICH STRENGTH BOLTING: During all _
holt installation and tighting
operations (306 a.S)
SPRAYED ON FIREPROOFING: (U.B.C.
Standards 43.8) -
SPECIAL GRADING. EXCAVATION AND
FILLING: l)o.Jring earthwork. (3063.11
&- Chapter 29)
:J
GLU-LAM BEA!'5: I:\spection Certificate,
by an approved 3ge:\cy, furnished to
the City.s Building Division before
beams are placed. (2S01-U.B.C. STD5.
2S-10,11) .
*In addition to the inspections
specified hereon, the Building
Official ~ay ~ake or require other
inspections of any construction
work to ascertain coopliance with
the Building, City or Zoning Codes.
CITY.S SITE PLAN REVIEW BOARD INSPECTION: Must be requested 2 days in advance of the date you
wish inspectio:\. All project conditions such as landscaping, parkinc lot striping etc. must
be co~~lcted hefore requesting this inspection.
FINAL BUILOING: ~lust he requested after the final Plumbing, Electric31, ~lechanical and Fire
Dcpartm:nt inspections are made and approved. No Occupancy of the premises can he made until
a Certificate of Occupancy has been issued by the Building Division and post cd on the premises
o FINAL ~lECHANICAL
v'-/
[2] FINAL FI RE DErARTIlE~rr
SIGNATURE
DATE
WALL HAXIIO!.ES :\NIl CLEMWUTS ~IUST BE .\CCESSIBLF.., AIlJUSTHENT TO AE M'\()E AT ~O COST TO TIlE CITY.