HomeMy WebLinkAboutPermit Building 2000-10-13
.-
\'
..
I Job# 00-00409-01 I
.
Page 1 of4
TRANS#:01-0003472
DATE: OCT 13 2000
AMT RECD:2 $ 5935.11
CHANGE:
CASHIER:061
~
CITY OF SPRINGFIELD~ OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 00-00409-01
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 1910 OLYMPIC ST 12/14 Spr
Assessors Map#: 17032531
Lot: Block: Addition:
Tax Lot #: 07700
Subdivision:
Owner:
McKay Investments
2350 Oakmont Way #204
Phone Number: 541-485-4711
City/State/Zip: Eugene, OR 97401
New Value: $413,453
Address:
Scope Of Work: Retail
This building will include three lease spaces, Most westerly entrance will be 1910 Olympic,
CAntAr Anlrv - Hl12 Olvmnir.. "nri IhA mMI A"slArlv - 1R14 Olvmnir.
Contractor Type Contractor Registration # Expiration Date Phone
General Contr Ordell Construction Co 63030 1/2/02 541-747-8734
360 Shelley St. Springfield, OR
97477-1963
Electrical Contr Alert Electric Inc 12772
1970 N 28Th St, Springfield, OR
97477-3401
Mechanical Contr Harvey & Price Co 77
Po Box 1910, Eugene, OR 97440-1910
5/22/01
541-747-2213
10/31/00
541-746-1621
Office Use
\\lOlICE:
Other RetaillT~~g~ERMITI5R!.~u.!!.~,i'!~!:IFTHE WORK
MRC Occuj:1ancyIGroup.:'IT IS NOT
AUTHORIZE[IIJI~IJo".n II, ::;.....:.r,'vl
Heat Source: OR
COMMENCEDSIlHF'S AtaHI\I~.DONED F
q. 00 ge.
...................,""...u""'nll"'\r"\
1"'\1'" IVV-""" I _'''___
Quad Area: 2CNW
# Of Units:
Constr, Type:
Water Heater:
Land Use:
Zoning Code:
Bedrooms:
Range:
To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7;00
a,m, will be made the same working day, inspections requested after 7;00 a,m. will be made the following
working day,
180 Day Extension
Required Inspections
I' Plan Check '<.,nl';;,1l POj\l:a~arr:lle"J13tiuir3S you to
follow rules adopted by~he Oreqon Utility
" i~,,;:f: alion Cenis... fhose wles .;\r9 S3t 'lorth
I BUlldmll O' T~952-00i-0010ihroughOAR952-il01-
- To be made after excavation but priob~&sS:lli~}Rf!Il;;0bt3in copies OUh9 "'JI3S by
-After trenches are excavated, , IIlncilhecent3r. 'i\Jot.:!: lh.:lt:JI::'llt'OI19
- To be made after all inslab building servrc~ eq,uip.ment"cnnduit pip.ing.j.and/other.l\quipment iter
nlJn1o"( ,fjl U I'" vT.::n.tu1 I ..J.uu, \jut. ,...._.....,-.
-Steel location. bond beams grouting or verticals,lnnacforqahce with 08,542415,
-Before covering sheathing with finish materlalsve l.J '" -<illll-"v~-"_U /"
-Prior to installing any roof covering,
- Prior to cover.
Site
Footing
Slab
Masonry
Shear Wall Nailing
Roofing
Framing
Zoning: MRC
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 1994-04-0068 2:
Comments:
~
~
Drywall
Structural Masonry
Structural Concrete
Bolts installed in
concrete
Roof Sheating/Nailing
180 Day Extension
SUB - InsulationNapor
Barrier
SUB - Final
Final Fire
Final Site Plan
Final Building
Underground Electrical
Rough Electrical
Electrical Service
SUB - Exterior Lighting
Final Electrical
Water Line
Sanitary Sewer Line
Storm Sewer Line
Backflow Device
Rough Gas
Rough Mechanical
Gas Service
SUB - Mechanical
Final Gas
Final Mechanical
Rough Grading
Final Paving
Planner: Lydia Neill
Urban Growth Boundary?D
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
.
.
I Job# 00-00409-01 I
Required Inspections
Buildin!!
Page 2 of4
-Prior to taping,
- To be done during construction by a State Certified Special Inspector. Provide results to City B
-In excess of 2500 psi. To be done during construction by a State Certified Inspector. Provide r
- To be done by a State Certified Special Inspector. Provide inspection test reports to City Buildir
- Before covering sheathing with finish material.
- To be called for at the same time as the SUB framing inspection,
- When all Fire Department requirements have been met.
-After all requirements have been met for Minimum Development Standards or from the Develo~
-When all required inspections have been approved and the building is complete,
,------ Electricaf-~I
- Prior to cover,
- Prior to cover,
-Must be approved to obtain permanent power.
- When all electrical work is complete,
I Plumbin!!
- Prior to filling trench.
-Prior to filling trench,
-Prior to filling trench.
-After device is installed but before backfilling trench,
Mechanical
- Prior to cover,
-After line is installed and line has been connected to a minimum of one appliance. Pressure tel
-When all gas work is complete,
- When all mechanical work is complete.
rPer-mits wlo Srch!! I
-After gravel is in place but prior to placing concete.
-After paving is complete,
Overlay District:
# of Street Trees:
Land Use: Other Retail Trade
Pave Driveway? 0
3:
Additional Requirements:
Glenwood Area? 0 Required Attachments:
Source Locn:
Material:
Flood Plain FEMA:
,
.
Construction Types:
Occupancy Groups:
# Of Buildings:
# Of Bedrooms:
Handicap Access? 0
rArea (Sq. Feet)
I Main: Accessory:
Fee
Commercial Plan Check
Additional Plan Check
Total Plan Check
Building Permit
State Surcharge For Building Permit
Building Administrative Fee
Total Building
Permanent: 201 to 400 Amps
Permanent: 401 to 600 Amps
Branch Circuits With Feeder or Service
State Surcharge For Electrical Permit
Electric Administrative Fee
Total Electrical
Minimum Plumbing Permit Fee
State Surcharge For Plumbing Permit
Water Service Footage
Sanitary Sewer Footage
Storm Sewer Footage
Backftow Prevention Device
Plumbing Administrative Fee
Total Plumbing
One to Four Outlets
Minimum Mechanical Permit
Mechanical Administrative Fee
Less than 100,000 BTU
Each Additional Outlet
Mechanical Issuance
State Surcharge For Mechanical Permit
Total Mechanical
Impervious Surface Area - Storm
SDC Administrative Fee
Total System Development
I Job# 00-00409-01 I
# Of Stories:
Current Units:
Census Code: Does not apply
Total:
Paid On Receipt#
Plan Check
03/16/2000 955
10/13/2000 3472
Buildinll
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
Electrical
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
Plumbinll
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
Mechanical
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
10/13/2000 3472
System Development
10/13/2000 3472
10/13/2000 3472
.
Page 3 of 4
Height (feet):
Proposed Units:
Value/Quantity
I
327,000
97
392.077
3
1
35
67
58
115
2
1
2
3
16.086
Fee Amount
$613.44
$96,52
$709.96
$1.092,25
$76.46
$32,77
$1,201.48
$180,00
$100,00
$70,00
$24.50
$10,50
$385.00
$,00
$9,80
$40,00
$40,00
$40,00
$20,00
$4,20
$154.00
$2.00
$.00
$,47
$12,00
$1,50
$10,00
$1,09
$27.06
$3.731,95
$186.60
$3,918.55
->.
.
Job# 00-00409-01 I
Paid On Receipt#
Permits w/o Srch!l
10/13/2000 3472
.
Page 4 of4
Value/Quantity Fee Amount
Fee
Paving
Total Permits w/o Srchg
Grand Total
Plan Check Type
21,376
$152,50
$152.50
$6,548.55
Checked By
Date Completed
Comment
Initial Review-C/I/P
Lisa Hopper
Steve Templin
04/03/2000
10/10/2000
KEN TO REVIEW STORM DRAINAGE
PRIOR TO ISSUING, Ken OK'd the storm
drainage 10-10-00,
Engineering-C/I/P
Planning-C/I/P
Structural-C/I/P
Fire Marshal-C/I/P
Gary Karp
Lome Pleger
AI Gerard
04/05/2000
06/16/2000
04/18/2000
Plan Review - 10.900 sq ft M - Occupancy with
VN construction - sprinkled
1, 2 extinguishers for each retail space
2, Address #'s front
3, Address #'s rear
4, Provide sign on rear door for electrical,
sprinkler room
5, Knox Box
By signature, I state and agree. that I have carefully examined the completed application and do
hereby certify that all Information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety, I further
certify that only contractors and employees who are in compliance with ORS 701.055 will be used on
this project.
I further agree to ensure that all required inspections are requested at the proper time. that each
address is readable from the street, that the permit card is Icoated at the front of the property, and the
~):~t ~:~~r~ the site at all times during construction, /0 _/,;{ -~c!
Signature (;- Date