HomeMy WebLinkAboutPermit Electrical 1993-8-4
SI'IIINCr-II.;.LO I.....
. ~ ,-' , . " . ..-.....u
Z' ,. .. nd does not require specific land use
sf:.prcv.:l.
225 FIFTH STREET Zonj~? (y&/
SPRINGFIELD, OREGON 97477 0 ~ 4'?:>
INSPEcrION REQUEST: 726.!3769'..v --- .-
OFFICE: 726-3759 AL...,,,nd Signature ~
3. COHPLETE PEe SCHEDULE BELOY
1. LOCATION OP INSTALLATION
ISlJ\(q 'OLVmPI(.. A.'
LEGAL DESCRIPTION 170 "32-i-?:>1 02-700
\<.6tt1/c.'t;.Vc:.-, en o\\~ ( kk ')
JOB DESCRIP1;ION
r.\.\MeolNa:Ito, ('U<~\u~k.-, t"Pov'f>
Permits are non-transferable and expire
if york is not started vithin 1BO days
of issuance or if york is suspended for
1BO days.
2. CONTRACTOR INSTALLATION ONLY
Ele~trical Contractor Palmer/Philips
Address 3170 Meadow Lane
City 'Eugene
Phone 688-6121.
Supervisor License Number 771QS
. Expiration Date 10/92
Constr Contr. .Number 20-179C
Expiration Date 10/92
Signature o~pe:vising Electrician
(/l' .
~ ~h~l~pS .
Ovners Name k.!'='l"""Cll
Address \ 'Is'&"'! OL'f m PIC
Ci ty .;5 P.(-UD Phone 1ZC.-77~
OYNER INSTALLATION
The installation is being made On
property' I OVn vhich is not intended.
for sale, lease or rent.
Ovners Signature:
-----------?r-----------~--
DATE:_ 'is --:{-i-J
RECEIPT I: '7 ,,~,.:::.
RECEIVED ny: ;;:0~
Nev Residential-Single or
Hulti-Family per dvelling unit.
Service Included:
Items Cost
Sum
1000 sq.ft. or less
Each addi t'ional 500
sq. ft or portion
thereof
Each Hanuf'd Home or
Modular Dvelling
Service or Feeder
$ B5.00
$ 15.00
$ 40.00
B. Services or Feeders.
Installation, Alterations or
Relocation:
200 amps or less
201 amps to 400 amps
401 amps to 600 amps
601 amps to 1000 amps
Over 1000 am'ps/vol ts
Reconnect Only
$ 50.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
C. Temporary Services or ,Feeders
Installation, Alteration or Relocation
200 amps or less
201 amps to 400 amps
Over 401 to 600 amps
Over 600 amps or 1000
$ 40.00
$ 55.00
$ BO,OO
volts see "B"
above
D.
Branch Circuits
Nev, Alteration or Extension Per Panel
One Ci.rcui t
Each Addi tional
Circuit or vith Service
or Feeder Permit q
<:,",00
3,)
$ 35,00
$ 2: 00 .....IK.OCl
E~ Miscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation $ 40.00
Sign/Outline Lighting $ 40.00
Limited Energy/Res $ 20.00
Limited Energy/Comm $ 36.00
5. 5'200
SUBTOTAL OP ABOVE '-J
5% State Surcharge ;;I.'"
TOTAL 65 ,,~
.
.
COMMERCIAL/lNDUSTRIAL
PERMIT APPLICATION
~
JOB NUMBER
~'72/
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726,3769
OFFICE: 726,3759
LOCATION OF PROPOSED WORK' /1?8"7 c::?c( .:;.--~ .P>/C
ASSESSORS MAP: ~"Y-~_ _ '2--S---'3" /'
57
- .,
TAX LOT:~~ .;...,-. .-.
~ -<,;::t:C:s
OWNER'
k r c::. ~;;r;z>.
ADDRESS' ?;~ ~.? d::::rA'.
CITY- _~k--.d ~~
o~.
/'
STAT~'
_ PHON~/'7/7'" )4BR - 2';;;/7
. 5.:::-/ r-c .2.-.......
~.
-..
ZIP'
~?e5Y
DESCRIPTION OF WORK: ,/~:rr-~rL.. 1{:"C ~G./'.. ~~ -r ,
NEW REMODEL V ADDITION DEMOLISH OTHER
,
7y..~ <.. /;::--.2>
VALUE: '?~'---
NAME
ADDRESS
PHONE
ARCHITECT'
CONTRACTOR'S NAME
GENERAL: t.~~~ 4-n-l/;
PLUMBING'
~~e-.A..c...p C<.--~,..
MECHANICAl /~~/~r7' _
- . /'
ELECTRICAL~&:<' ~/L(~
, r
CONST.
ADDRESS ~CONTRACTDR # . EXPIRES PHONE
~~~;;''7 :L.,~A>. ~~.-" ~
_. _....."~.~--"'" , 2 '" - -2::..::,... ~ / ., _?e. o/n//, =-
, .. r ,,, r
NO_
FEE
CHARGE
MECHANICAL
Nn ~~~ "HARGE-.
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
./ Vent Fan/Single /fh COD
duCI M~
Vent System apart ,
from AC or hlg,
Mechanical exhaust
hood and duct
Perm It Issuance $10,00
TOTAL PERMIT
PLUMBING
Single Fixture
Relocaled Bldg,
Inew lix. addlll
Water Service
II.
Sanitary Sewer
It.
Storm Sewer
fl.
Backflow Device
TOTAL PERMIT
OUAD AREA-
- OFFICE USE -
LAND USF'
HANDICAP ACCESS:
FLOOD PLAIN'
# OF SLDGS:
# OF UNITS'
ZONING'
OCCY GROUP'
# OF STORIEP'
CONSTR TYPF'
HEAT SOURCE:
LIGHTING POWER BUDGET:
WATER HEATER:
SO. FT.
$/SO. FT,
VALUE
SO. FTG MAl N
x
SO. FTG ACCESS
x
SO. FTG OTH ER
.t4~
-/'
X
TOTAL VALUE OF PROJECT
-:;;;;::~- -
PLAN CHECK FE.E
':1^7~
.
RCPTN
OAF
SY
I BUILDING PERMIT
15% State
Surcharge
I MECH6bUCALI'~.s
/~_.
15% Sfate
Surcharae
1 PAVING
I PLUMBING
CURSCUT
FT.
FT.
I DEMOLITION I
I I
I~~""'F~
'SUBTOTAL -
PERMITS
SYSTEMS
DEVELOPMENT
I
I
~/~I
:Z~7S- 1
I
~o-
L'~.-
5% State
SurcharQe
FENCE
VALUE ~
SIDEWALK
- ;;>.s--
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
""'2 ~;5.:>
.
REQUIRED INSPECTIONS
.
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an Inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner! Contractor during
construction of the following work. A
copy of the special testi ng reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a,1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
d rai nage II nes. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
board interior wall covering is
applied.
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.G.
Standards 43,8.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, Is in
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU,LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C,
STDS. 25,10,11).
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
STRUCTURAL MASONRY: (306
a,7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
.In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
x
FINAL ELECTRICAL
/'
FINAL MECHANICAL
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY ~-"".. ~
, e-' ,,?7 -
DAT~ 7~ --'-7 -:>
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the propertY~an the approved set of plans will remain on the site at all
times during /'jtructio!1' 0 \ !J
Slgnaturo (J/'::'" J/~NI t:1? Jt2...d'c.O'./~ Date ~/2-~/q",
- C /J . /' " 7'
2.. 'J'..FO
')'~/~
RECEIPT ':
DATE PAID' 7/.2. 'l(.'7' 3,
RECEIVED BY: ~'?:, I l
VALIDATION:
AMOUNT RECEIVED: