Loading...
HomeMy WebLinkAboutComments SUB 12/8/2009 12/08/200~ 0~:57 FAX 7477348 WSC FAX I4J 0011002 SPRINGFiELD UTiLITY IlOARD ... . VV:\T EKSt::KVI C I:: C 1::1\"1"1:: R .2,02 South. 18th St.reet Springfiald.. OR '97477-5240 Tel 541.726.2396 Fax 541. 747 .7348 www.5ubutil.com December 8, 2009 Molly Markarian City of Springfield 225 N. Sill Street Springfield, OR 97477 Dear Molly: SuBJECT: DEVELOPMENT ISSuEs MTG #ZON2009-00025 ST VINCENT DE P AULIKNIGHT 17c03-27-13 TLl0900 2080 LAURA STREET 17-03-27-10 TL 4200 Listed below are our cOrnn'l.ents for the'abovc referenced development proposal: \. The proposed deveiopment is within the Springfield city limits and will receive water service from the Springfield Utility Board (SUB). 2. All new watei' system facilities and modifications to water system facilities both inside and adjacent to the proposed development shall be placed in street right-ot~way at' a location and depth of bury that meets the standards ofthe SUB Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications, 4. All workmanship shall be performed to meet or exceed SUB Water Division construction standards. 5. Sizc ofwaterlinc and other facilities, including water meters, must meet the needs ofthe SUB Water Division and the long-range needs of the City. These needs include, bLit are not limited to, meter location and'access~ sizes of water distribution and transmission lines, pumping facilities, and communication lines. . 6. Please ask the developer to contact the SUB Water Division for detailed inforination on the materials and construction standards, detailed costs for iristalling SUB water facilities, and a , schedule of construction. Construction expenses may be reduced with good planning of required w~ter facilities, good timing of facilities installation, andjoinl trench oppo~ities. 7. All water meters will be placed iri public right-ofcway ata location identified ,by the developer. Each lot or parcel must have its o'fTI water, service. S:\SlTEPLAN\2080 Laura Street St Vincent de Paul developnl:ent issues 12-8-09.docx ' I . " Date Received: /2/8(0/ Planner: MEM 12/08/2008 08:58 FAX 7477348 . WSC FAX IilI OOU002 8. Water service facilities will be install cd upon collection of development charges. Development policies and charges identified in this letter are subject to change. Actual charges will be those in effect at the time water service is requested. 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinlcing water comes from wells. In evcryinstance, care shall be taken to prevent grouridw~ter contamination. , Contractors/developers/owners shall be responsible for the safe handling and 'storage of 'chemicals, petroleum products, fertilizers, 'and the prevention of groundwater and storm water runoff contamination. 'Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at SpringfieldUtility Board Water Division for details at 726-2396. 10. Backflow prcwntion devices will be required for this service. Please contact Scott Higley at 726- 2396 prior to installing water service. Scott can help in the selection of the most economical device and location., Water service will not be provided until a backflow plah has been submitted to SUB Water Engineering and approved for installation. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division. Sincerely, GJz:- (\/\d~ Bart E. McKee, P.E. Senior Civil Engineer - Water Division BEM:mt cc: Kristen Karle, St Vincenl de Paul of Lane County, PO Box 24608, Eugenc OR 97402 Anne DeLaney, Bergsund DeLaney Architecture, 1369 Olive Street, Eugene OR 97401 S:\SITEPLAN\2080 Laura Street St Vincent de Paul development issues' 12-8-09,docx ~."''''.Iv'\;U:' r'lanner: MEM, 17- (6[ 01