HomeMy WebLinkAboutPermit Fence 1984-7-10
"l(tSI~fIAL"
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
.
eu,.
(n3/q3-
/300 ~f/ 6:tA.u-*
\'1(]3~ S3'~r T=wt#()~
~'
Job Location:
AsoesGors Map #
Subdivision:
CtJrzer:
~ . c. AU)J.)rJJlX
-~
~cL
Address:
City:
n
n
n
n
Mm,)
Addi ticr!
Remodel
,'.fobi La Boma
17- I() -RI.
Date of Application
Phone:
Zip:
Q7'-/77
Describe fl'ork:
~V)d ~I
~oO. ::t
Value ~ J
Address
Contractors ; J ,
GeneraL ~'--/
PZwnbing
Electrical
Mschar.ical
Const1'"Ucti071 Lender
r
Siqr.ed:
Date:
(f lAt~
7 -/(')-tf'7?
Lise. #
Eroires
Phone
It i.s the respontri.bility of ths permit haUler to Bee that azz. incpections are r.:ade at the proper timE, that each o::ddrOS8 is l'ea.dab~e
f1"Ol1/ t'M street, and that ths pe:rrrri.t card is located at the [POnt of the property.
4Buitdi!'lf] Dividor. approved p1.an shall remain on thz Building Sit$ at all times.
PROCEDURE FOR INSPECTION RSpUEST:CAlL 726-3769 {recorder} state YOUI' City design.2ted job nwnber, job adC.:rcss, typo of in3poc~ic~1
requested ar.d when you LJiH be ready for inspection, Contraetors or Owners name end phone number. Requests reeoived befcre 7:001:':'1
~>iZl. be made th€ same day, requests made after 7:00 am will be made the next :.x;rking day.
Reauired Tns~ncticns
O SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be nxzde
after trenches are excavated and
forms are erected, but prior to
pouring ccncret~.
UNDERGROUND PLUMBING) SEWER, W..'1TEF?,
DRAINAGE: To be made prior to fil-
"lir.g trenches.
O UNDERFWDR PLU/.fBING & MECHANICAL:
To be made prior to installation of
floor insu4:tion or decking.
O POST AND BEAM: To be rr.ade prior to
instal."lation of [Zoor insulation or
dsokins .
O ROUGH PLllMRIllG, Er.ECTRICAL & M'eCH__
ANICAL: No work is to be covered
,u.r.til these inspeetions have beer.
made and approved.
O FIR'EPLACE: mol' to pkcir.g facing
materials and before framing inspec-
tion.
o
o
FRAMING: Must be requ.eated after
approval of rough plwr.bing, electri-
.cal & mechanica"l. An roofing
bracing & chinmcys, etc. TTT".lst be
,"comptetcd. No work is to be con-
..cealed until. thiD inspection has
~ bGe.n made and approved.
Your City Deaigr.ated Job Number Is:
u
INSULATION/VAPOR BARRIER INSPECTION:
To be made after aU insul.:rtum ar.d
required vapor b~iers are in place
but before any Lath, gypsum board or
LXlU covering is applied, and before
. any inaul.ation is concealed.
RL/O '-181
DEllOLITION OR l.:OVED BUILDJj~'GS
~ Sani tCU'y se'.Jer ::apped ::.t p:.opo;rty 7.ir:6
.=J Septi:) tank ;r.....?ed and fille~ LJith fj1'a:JaZ
---, Final - ({hen abv"'Ve items are cc..:mtetcd
---1 and when demolition is complete 01' 8t1'U~-
ture moved and premises cleaned up.
Mobile Hemes
:::J Blocking and Set-up
:::J PZumbing connections sewer ar~ Wate~
:::J ElectricaZ Connection - Blocking, set-up
and plwnbing connections rrr.,;.st be approved
before requesting elec~ricat in8p8c~io~
:::J Accessol":1' Buitding
---, Finat - Aft~r p~rcr.es, skirting, decks,
~ etc. are comple;~d.
o
All project conditions, such as the installation of street trees, co~letion of the
l'equired l.andscapir.g, etc., must be satisfied before the BUILDING FINAL can be rrzquest.2d.
D FIliAL PLUIIBIIIG
D FINAL ME'::HANICAL
D FINAL ELECTRICAL
,D
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plwnbi"'3
Electrical, and Mechanical Inspections have been made and approv.:d.
O DRYWALL INSPECTION: Tc be made
after aU drywzt is in place,
but prior to any taping.
O ~SONRY: Stee l location, boYzd
beamG, grouting or verticals in
accordance LJith U.B.C. Section
2415.
O WOODSTOVE: After instatl.ation is
completed.
O CURB & APPROACH APRON: After foms
are erected bu t prior to pouring
eonerete.
. 0 SIDEWALK & DRIt'EWAY: For all. con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & form work & sub-
base material in place.
When compl~te -- Provide
se~tions through
"'AiL MANHOLES AND CLEANOUTS llUST BE ACCESSIBLE, ADJUST!fEllT TO BE MA.DE AT liD COST TO CITY I Page 1 of 2
: JOB NO. ~L/(J--}r:l1
Oc::a~~"G_~'- ~
WT TYPE
Zone:
Lot Sq. Ftg.
S of Lot C~erag~
#- of Stories
Total Height
Topography
Interior>
Corner
Panhandle
Cut-de-sac
I
lITEM ISQ.FTG X Value
Ifthin I
I GcPaae I
I Carool"t I
I ACCeS801"U I
I
TOTAL VAWE
Is.D.c. tVCl.UC)
1.5", ;
Building Permit
StatB Surcharge
Total Cha......ges
lITEM
I Ft.:rtuJ.es
I Residential (1 bath)
I Sanitary Sewer
I Water
NO'1
I
FEE
CHARGE
Plumbing Pemi t
Stats Surcr.arge
Total Charaes
!ITEM
I NO.
FEE
CHARGE
Res. So. ftQ.
NmJ/Extend Circui ts
I Temporary Service
I
I
I
I
I
I
Electrical Permit
State Su:rchara8
Total ChaI'qes
lITEM
I PuMtaCl'2' ETU' S
I Exhaust Hood
I Vent Fan
I WOodstove
I
Permit Issuance
I
I
I
I
I
I
I
I
I
I
I
I
, ;
I,
I
I
I
I
I;
,
I
/~I
I
I
I
I
11 /r.OO I
NO.
FEE
CllARGE
Mechanical Permi t
State Surcharae
Total ChartTIJ9
-- ENCROACHME:NT --
I Seau.ri tu D20031. t
I Storage
I Maintenan.ce
Permit
Total Cha1'QCB
I Curb",,;
I SideLIa lk
I Fen::e
I Electrical Label
! Mom lo Home
I
TOTAL AMOUNT DUE:;
. ~:1'" ~
P,L.
INorth
lEast
ISouth
IWest
Type/Cor..t: ,
II Enerau So:aoces
Setbacks Heat
. House . Carage . Access. I I Water> Hp.atl?T'
I I Range
I I Firer; lace
I I Wood:; tove
II
TiJ'Oe
Beaoor.:s:
Lot Faces -
Fees
Building Value & Permit
This pe:rmit io gronted on the express condition that the sf:iid construction
shall~ in all respects, confonm to the Ordinar~e adopted by the City of
Springfield~ including the Zoning C'rdinance, regulating the construction
and UGe of buildings~ and ma.y be sUGpended or revoked at cny time upon vio-
lation of any provisions of said Ordinances.
I
I ;
Iplan Check Fee:
Date Paid:
IRec~ipt #:
ISignsd:
Plumbing Permit
No person chalt CDnBtruct~ install~ alter or change any new or e=isting
plumbing or drainage syst~ in whole or in part~ unless such person is the
legal possessor of a valid plumber's license~ except tr~t a pe~son may do
plwnbing work to property which is o:.med, leased 01' operated by the appli-
cant.
l ;
I
I
I
I
I
I
I
I;
Electrical Permit
Where State La1.J requires tr.at the electrical work be done by an Ele~triaal
Controctor~ the eleatrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
Mechanical Permit
Pl-an E:rarm.ner UGt:e
I HAVE CAREFULLY EXANINED the completed application for pe1'11fit~ and do
hereby certify that all information hereon is true and corrcct~ and I
further certify that any ar.d all !JOrk pcrf01":1led shall be done in acO'or-
dance with the Ordinances of the city of Springficld~ and the: La'..;s of tho
State of Oregon p$rtaining to the work described herein~ and that NO OCCU-
PANCY will be rrr::r.de of any structUI'e withou.t permission. of the Building Di-
vision. I further certify that o~ly contractors ar~ empl~yees who are in
~pliance with ORS 701.055 will be used on this project
(lr~,-g~
Sign(;l
Dats