HomeMy WebLinkAboutBuilding Compliance Report 2009-12-9 ~ftJ ..."",..""II,"'hl,\~,,,.. Geo;.,..\..:...oJ & Construction Services ~~ Page 1 of 1 Report of Inspection Services WeldinQ/HiQh-StrenQth BoltinQ Client: Mr, Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 L TO Fleet Building Remodel Expansion 3500 E, 17'" Ave, Eugene, Oregon Date: Project No,: Report No,: Inspector: 10 No.: Project: Inspection of: Fabricator or Erector: Contractor: Welding Metalsome Fabrication Fortis Construction Shop: Ii!! Weather: BPNo,: 12-09-09 2097153 E-24747 M, Meyer 0899705-85 ICC Field: 0 Inside COM 2009-1164 Performed visual inspection on two (2) HSS cross-brace frames, Completed welds were checked for size, length, profile and location, Jeff (Metalsome) was asked to notify our office when additional services are needed, To the best of our knowledge, the work checked is in conformance with shop drawing 04 dated 10-23-09 and applicable AWS 01,1 code, except if noted above, Reviewed By: ;J1, ~/Jur- Michael L Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report and/of enclosed test data is the confidential property of the cUent to whom it is addressed and pertains to the specific process and/Of material evaluated. As such. information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed withoul FEI Testing & Inspection. Inc.'s written authorization. 750 WJ ComellAvenue' Corvallis, Oregon 97330' phone (541)757-4698' fax (541) 757-2991 29540 B Airport Road 'Eugene, Oregon 97402, phone (541)68<h3849 'fax(541)684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 ~ ~ftl ".,,,,,..'."."...1..."'.. Geotechnical & Conslrudion Services ~ Page 1 of 1 Report of Inspection Services Weldina/Hiah-Strenath Boltina Client: Mr, Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 L TO Fleet Building Remodel Expansion 3500 E, 17'h Ave, Eugene, Oregon Date: Project No,: Report No,: Inspector: 10 No.: Project: Inspection of: Fabricator or Erector: Contractor: Welding Metalsome Fabrication Fortis Construction Shop: Ii1f Weather: BP No,: 12-08-09 2097153 E-24750 C, Walpole 01040131 AWS CWI Field: 0 Inside COM 2009-1164 Performed visual inspection on the following fabricated structural steel headers: 2C, 20, 2E, 3C, 3D, 3E, 3F (2 pieces), 4E (2 pieces), 5B (6 pieces) and 50, Completed welds were checked for size, length, profile and location. Fabricator was asked to notify our office when additional services are needed, To the best of our knowledge, the work checked is in conformance with shop drawings dated 12-01-09 and applicable AWS 01,1 code, except if noted above, o ~~~D~~ !! DEe 1 5 2009 Reviewed By: A,'I.~ Michael L Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (em ail) Pivot Architecture - John Stapleton (em ail) Hohbach-Lewin - Vikki Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc -::n .:J This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andfor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, lnc.'s written authorization. 7fIJ t-NV Cornell Avenue' Corvallis, Oregon 97330 ' phone (541) 757-4698 ' fax (541) 757-2991 29540 BAirport Road, Eugene, Oregon 97402, phone (541)684-3849 'fax(541)684-3851 62979 NE Plateau Drive, Suite 3 'Bend, Oregon 97701 'phone(541)382-4844' fax (541) 3824846 \:Q SfEJ Page 1 of 1 ",~~'l\.\ ,f..'_,l~,i.;:'q~""".lht,. Gedeaulcal & CalsIrucfun Serials Daily Field Report Client: Mr, Joe McCormack Project: L TO Fleet Building Date: 12-07-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E, 17th Ave, Report No.: E-24725 Eugene, Oregon 97401 Eugene. Oregon Inspector: A, Fenstermacher 10 No.: 5258882-49 ICC Inspection of: Epoxy Dowels Weather: Clearllnside Continuous Inspection: 0 Contractor: Fortis Construction BPNo,: COM 2009-1164 Periodic Inspection: 0 Performed continuous inspection during the' installation of horizontal and vertical dowels as follows: forty (40) #5 x 40" for CMU infill into CMU wall on line C, from 15 to 16; forty (40) #5 x 40' into concrete slab for new slab tie-in between 17 and'18, from A.8 to A,9; seventeen (17) #5 x 40' and four (4) #4 x 32- into concrete slab and CMU wall for new CMU wall tie-in on A.8. from 17 to 18, Prior to installation. the predrilled holes were cleaned with compressed air and a brush, Verified minimum embedment depth of 8 bar diameters. Dowels into CMU were installed with Hilti Hit - Hy 150 max (ICC - ES ESR 2262 and 1967/ expiration date 0612010), Dowels into concrete were installed with Hilti Hit RE 500SD (ICC - ES ESR 2322/ expiration date 0712010), , Kean Rager (Fortis Construction) was asked to notify our office when additional services are needed, To the best of our knowiedge, the work inspected was in accordance with plans dated 09-30-09; RFI 69 dated 12-02-09 and applicable workmanship provisions of the I.B,C,. except if noted above, Reviewed By: j?1. 'i, fAr-- Michael L Meyer Technical Manager c: Fortis Construction - Kean Rager (em ail) Fortis Construction - Tim Sissel (email) Fortis Construction - Conan Doherty (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikkl Bourcier (em ail) Balzhiser Hubbard Engineers - Janet Spriggs (em ail) City of Springfield MLM:sc This report and/or encJosed test data is the confidential property of the client to whom 'it is addressed and pertains to the specifiC process and/or material evaluated. As such, infonnation contained herein shall nol be reproduced in part or full and/or any part thereof be disclosed without FEl Testing & Inspection, Inco's written authorization. 7fiJ rm CanelAverue' CavaIis, OEgl197330' Jhre(5'l1) 757-4696' fax(5'l1) 757-2991 29540 BAipat Rood . Eugene. 0Egl1974a2 'JYme (541) 684J849 ,fax (541 )~1 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 ' phone (5'11) 382-4844 ' fax (5'11) 382-4846 ~ftt IkC 20n9 ~ Page 1 of 1 ~"~ & 0Jnstrudi0n SeMces Daily Field Report , ~I~nl\ Lr.';'.n.'~~lfllhl. .'1'... Client: Project: L TO Fleet Building Remodel Expansion 3500 E. 17'" Ave, Eugene, Oregon Date: Project No,: Report No,: Inspector: 10 No,: Mr, Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 12-03-09 2097153 E-24696 M, Meyer 0877905-88 ICC Inspection of: Reinforced Concrete, Epoxy Anchors Contractor: Fortis Construction Weather: Clear Continuous Inspection: 0 BP No,: COM 2009-1164 Periodic Inspection: 0 Performed inspection on the reinforcing steel in wash building footing and stem wall on line 2,B, from line 2,3 to 2,3 +12', Rebar was checked for size, grade, quantity, lap, spacing, ties and supports, where applicable, Observed the placement of 2.5 yards of Knife River 3000 psi-concrete (mix 2430NE7200), Concrete was placed directly from truck and was mechanically consolidated, Cast four (4) 4" x 8" compressed test cylinders and performed field tests as follows: slump - 23/4"; concrete temperature - 56'F; air temperature - 41'F. Also observed installation of six (6) #5 x 3'8" rebar dowels into existing footings at lines 19C and 170.4 (three (3) at each location) for new continuous footing connection, Prior to installation, the pre-drilled holes were cleaned with a brush and compressed air, Verified minimum embed depth of 5", Dowels were secured with Hilti RE500SD epoxy (ICC-ES ESR 2322/expiration date - 09/2010), Bill Henderson (McKenzie - Commercial) was asked to notify our ofFice when additional services are needed, To the best of our knowledge, the work inspected was in accordance with conformed drawings dated 09-30-09 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: /h . 'f.. f}..... ./ Michael L. Ml;er Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (em ail) Fortis Construction - Conan Doherty (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:/d This report andlor enclosed test data is the confidential property of the client to Ylhom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FE\ Testing & Inspection, Inc.'s written authorization. 7fIJ WI CaneII Averue ' CavaIIis, Oeg:n 97331' p'rre (541) 757.4698' fax (541) 757-2991 29540 B Aipat Rm:I' Eugere, Oeg:n 97402 . p'rre(541) 684-3849' fax (541) 684-3851 62979 NE Plateau Drive, Surte 3 ' Bend, Oregon 97701 . phone (541) 382-4844 ' fax (541) 382-4846 ~fEI "'''''''''.'''''''''''''IllIlI ~ , .;...aJ & ConslrucIion Services ~ Page 1 of 1 Field Density Test Results - ASTM D 2922 Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene. Oregon 97401 Project: L TD Fleet Buildin9 Remodel Expansion 3500 E, 17'" Ave, Eugene,Oregon Date: Project No,: Report No,: B,P, No,: 12-03-09 2097153 E-24695 COM 2009-1164 MOISTUREIDENSITY DATA: ASTM D698 - Maximum Dry Density of 129,8 pcf, at 10,6% moisture, is from our sample no, 2138 dated 11-17-09 for 3/4"-0 crushed gravel (Delta Sand and Gravel), Near lines 18D.4 Near lines 19D,2 I Approx. Elev. FG FG Wet Density (pet) 132.5 132.4 Percent Moisture 5.5 7,2 Dry Density (pet) 125,6 123,5 Percent Compaction 97,O 95,0 Compaction Requirement I 95,0 I 95,0 Test No, I_L Approximate Location Tests performed at finished grade of base rock under continuous footings, Remarks: Bill Henderson (McKenzie - Commercial) was advised of test results, Reviewed By: I?'li,~ Michael L Meyer Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Geoff Miller (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (em ail) City of Springfield MLM:ld This report and/or enclosed test data is the confidential property of the client to whom it is addressed and penains 10 the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part offul! and/or any part thereof be disclosed without FEI Testing & Inspection. Inc:s written authorization. 701:) NW CcrnelI A\61"" Cav.ll1i>, OI~ 97330' phme(541) 7574(f}8' fux(541) 757-2991 29540 B AiqxJt RmI. Euga1e, 0Ryn 974m 'J:Ime(541 )684-3849' fux (541 )684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 ' phone (541) 382-4844 ' fax (541) 382-4846 ~ ~ftl Page 1 of 1 1f1~'tII\lfl;.II'~I;'l'.IIIl.W!II ~ . ~ & Construcfun Services Daily Field Report Client: Mr. Joe McCormack Project: L TO Fleet Building Date: 12-01-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box 7070 3500 E, 17'h Ave, Report No,: E-24692 Eugene, Oregon 97401 Eugene, Oregon Inspector: M, Meyer 10 No.: 0877905-88 ICC Inspection of: Epoxy Anchors Weather: Overcast Continuous Inspection: 0 Contractor: Fortis Construction BP No.: COM 2009-1164 Periodic Inspection: 0 Performed continuous inspection during instaliation of fifty (50) #4 x 30" rebar dowels at :t16" on center into existing floor slab for connection of south and west 4" CMU training room walls, Prior to installation. the pre-drilled holes were cleaned with a brush and compressed air. Verified embedment depth of 4', Dowels were secured with Hilti Hit RE500SD epoxy (ICC-ES ESR 23221expiration date: 07/2010), Also, witnessed installation of two (2) #7 x 22' and three (3) #5 x 23' rebar into existing footing and stem wall in wash building at lines 2,B2,3 for connection of new foundation, Pre-drilled holes were cleaned as noted above and embedment was verified at 8" for #7 bar and 6" for #5 bar. Rebar was secured with same epoxy as noted above, Kean Rager (Fortis Construction) was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected was in accordance with conformed drawings dated 09-30-09 and applicable workmanship provisions of the I.B,C" except if noted above, Reviewed By: Ih.'i.~/ Michael L M~er Technical Manager c: Fortis Construction - Kean Rager (email) Fortis Construction - Tim Sissel (email) Fortis Construction - Geoff Miller (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:ld This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s wriUen authorization. 7ffJ NVV CarelAverue' CavaIIis, Qeg:x19733J' p'1cre(541) 757-1696' fax (541) 757-2991 29540 B Aipat RcOO ' Eugene, Qeg:x197402 ' p'1cre (541) 684-3849 ,fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 ' Bend, Oregon 97701 'phone (541) 3824844 ' fax (541) 3824846