Loading...
HomeMy WebLinkAboutPermit Building 1997-1-8 SPRINGFIELD Page 1 RBSIDBNTIAL PBRMIT APPLICATION CITY OF SPRINGFIBLD COMMUNITY SBRVICBS DIVISION BUILDING SAFBTY Job Number: 961669 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 1005 OLD ORCHARD LN Assessors Map #: 17032344 Lot: 1 Block: Tax Lot #: 05000 Subdivision: RIVER GLEN OWner: FUTURB B HOMES Phone #: 485-3176 Address: 3593 RIVER POINTE DRIVECity/State/Zip: EUGENE, OREGON 97408 Describe Work: S.F. RBSIDBNCB NEW Canst. Contractor Contractor # Bxpires Phone General: FUTURE B HOMES 0036499 05/18/97 485-3176 3593 River pointe Dr Eugene OR 9740 Plumbing: CUSTOM PLUMBING 0081994 05/06/00 485-1146 3248 Kentwood Dr Eugene OR 97401000 Mechanical: ROLFS HEATING 0102455 10/04/97 686-4927 PO Box 66 Dexter OR 974310000 Electrical: BOB FISHER ELEC 0096275 01/25/97 689-7973 180 Kingsbury Ave Eugene OR 9740400 QUAD AREA: 2RNW # OF UNITS: 1 CONSTR. TYPE: VN SECONDARY HEAT: P INSUL PATH: P1 OFFICB USB -- LAND USE: 1111 ZONING CODE: LDR # OF BDRMS: 4 WATER HEATER: G SQ FOOTAGE: 2637 # OF BLDGS: 1 OCCY GROUP: R3 HEAT SOURCE: FG RANGE: E To request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a,m, will be made the same working day, inspections requested after 7:00 a,m, will be made the following work day. RBQUIRBD INSPBCTIONS --- FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. UNDBRFLOOR PLUMBING - Prior to insulation or decking. UNDBRFLOOR MECHANICAL - Prior to insulation or decking, ROUGH GAS - after line is installed and capped if not attached to an appliance POST AND BBAM - Prior to floor insulation or decking, INSULATION - Floor; prior to decking wall/ceiling; Prior to cover WATBR LINE - Prior to filling trench, SANITARY SBWER LINE - Prior to filling trench, STORM SBWBR LINE - Prior to filling trench, ROUGH PLUMBING - Prior to cover, ROUGH MECHANICAL - Prior to cover. ROUGH BLBCTRICAL - Prior to cover. BLBCTRICAL SBRVICB - Must be approved to obtain permanent power, SHEAR WALL NAILING - Before covering sheathing with finish materials, FRAMING - Prior to cover, INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping. CURB CUT - After forms are erected but prior to placement of concrete. SIDBWALK - After excavation is complete, forms and sub-base material in place, SPRINGFIELD ~. Job Number: 961669 Page 2 FINAL PLUMBING - When all plumbing work is complete, FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. GAS SERVICE - After line is installed and line has been connected to a minimum of one appliance, Pressure test done at this point. FINAL BUILDING - When all required inspections have been approved and the building is complete, N Lot Sq, Ft.: 9916 Total Height: 24 Lot Type: CORNER Setbacks S W E 39 18 12 12 Lot Coverage: 26,6 % Setbk From NPL: 55 Lot Faces: N Topography: 2 Solar Approved: Y House Garage 18 Item Main Garage Total Value BUILDING PERMIT Square Feet x 1997 640 $/Square Feet 64.66 16.27 Value 129,126,00 10,413,00 139,539,00 Building Permit Fee Surcharge/Admin 523.00 41,84 TOTAL FEE (A) 564.84 --- SYSTEMS DBVELOPMENT CHARGE (SDC) --- (B) 2,921. 73 Systems Development Charge is due on all undeveloped properties within the City limits and the Citys Urban Growth Boundry which are being improved. PLUMBING PERMIT --- Item Residential Bath(s) 3 Fee 192 . 50 Plumbing Permit Surcharge/Admin 192 . 50 15.41 TOTAL CHARGE (C) 207.91 --- MECHANICAL PERMIT --- Furnace Exhaust Hood Vent Fan Dryer Vent GAS LINE & W/H GAS F,P, 4 6,00 4,50 12,00 3,00 5,00 4,50 Mechanical Permit Issuance Surcharge/Admin 35.00 10,00 2,80 TOTAL PERMIT (D) 47.80 --- MISCELLANEOUS PERMITS --- Surcharge/Admin Sidewalk Curb Cut WILLAMALANE SDC 0,00 22,30 14,50 1,000,00 SPRINOFIELD Job Number: 961669 Page 3 ELECTRICAL PERMIT 183,60 TOTAL MISCELLANEOUS PERMITS (E) 1,220.40 (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and E combined) 4,962.68 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: 339,95 Date Paid: 12/16/96 Received By: Plans Reviewed By: DON MOORE Date: 01/08/97 Building Site Reviewed By: LISA HOPPER Receipt Number: 24075 ADDITIONAL COMMENTS --- PATH 1 8 STREET TREES REQUIRED By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project, I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. C Si~ (LYrJ Date --- VALIDATION Date Paid: "2. 42.~ ~ //fi.,/n , I ~2.,"'9 '("~- Receipt Number: Amount Received: Received By: ... . , . . . '. CITY OF SPRINGFIELD SYSTEMS DBVBLOPMENT CHARGE (RESIDENTIAL) Name or Company: FUTURE B HOMES Location: 1005 OLD ORCHARD LN Deve10pement Type: R Building Size: Job No.: 961669 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 3152 X 0,216 Per Sq Ft = 2. SANITARY SBWBR CITY Number Of PFUs 25 X 44.75 Per PFU = (see Page 2) 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1. 010 X X Cost Per Trip 451.26 = $455.77 Transportation Total 4. SANITARY SBWBR - MWMC Number Of PFUs 25 X X Per PFU + 20.690 + MWMC Admin Fee 10.00 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) S. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0,50 TOTAL SDC Reviewed By: DENNIS ERNST Date: 12/20/96 Page 1 Sq Ft $680.83 $1,118.75 $455,77 = $527.25 $0.00 $527.25 $2,782.60 $139.13 $2,921.73 ". . . Job Number: 961669 . l"IXTURB UNIT CALCULATION TABLB Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oi1/So1ids!Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher C10theswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal,' Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS = Number of New Fixture Unit Equivalent Fixture Units 2 o o o o 2 o o o o o 1 o 3 o 3 o 2 1 2 3 6 2 6 1 3 2 4 o o o o 4 o o o o o 2 o 3 o 12 o 2 2 1 6 4 25 CREDIT CALCULATION TABLE: Based on assessed value, If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o X 0.00 = 0.00 o x 0,00 0.00 CRBDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.) . . Job. No. q lo\ ldlJ , , SYSTEM DEVELOPMENT CHARGE WORKSHEET NAME: HIUlll Q ) ~ ~Q(Y'.Q() PHONE: 4~ 'S, 3\ 1 Je ADDRESS: ~~~q3 [l OIQy""'\N~ STATE: a'-ZIP: ltik1I LOCATION OF PROPOSED BUILDING SITE: L1 Street Address: \O{)5 ((](i _ (Q r(\~'nta..llJL> Plat Name: ~x6l.ox\ Tax Lot Number: \1Q~44 ()fffi) 1. DEVELOPMENT TYPE, (Check appropriate dwelling(s), SDC calculations and dwelling t ype definitions are on the back,) A, f)innIA-FRmilv DAtRr:hAd '" Single FamUy home NO. OF UNITS \ Manufactured home not in a park c..u X $1 ;000 per unit = $ \ ()t)U - B. SinnlA-FRmilv Att;:lr.hflO NO. OF UNITS X $924 per unit = $ C. Multi-Familv Aoartment NO. OF UNITS X $692 per unit = $ D. ,Manufactured Home Park NO, OF UNITS X $699 per unit = $ . WILLAMALANE SDC $ 2. SDC CREDIT (if applicable)SDC-payer must furnish proof of Willarnalane Credit approval. See SOC Credit Worksheet. $ 3. TOTAL WILLAMALANE NET SDC ASSESSED en.? (if SDC reduced for Credit) $ \ UVD- ~~~~~~ Development Services Department City of Springfield \)!}. I \~ I <;'ro Date .' . . CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY ~~~ s.. ~\<tS 5 JJJf \ 'd/J'S# AUTHORIZATION TO PROCEED AGREEMENT THIS AGREEMENT is entered into this ~ \ <;t day of ~~t(N\~y' ,19C\L"by and between the City of Springfield, a municipal corporation of tne State~ Oregon, hereinafter called Ci ty, and ec:;' ,hereinafter called the Applican t. VHEREAS, the applicant has applied to the City Community Services Building Division for issuance of certain constructio permits f r development improvements to be located at I~C; ~ Springfield, Oregon or within the City's Urban Growth Juris ictlona Area; Lane County Assessor's Map and Tax Lot number L29~ 2~ 1-.4 t'?~a:J . VHEREAS, the applicant has asked the City to authorize the Applicant to immediately commence development improvements without a completed plan review or subsequent approval as required by the Springfield Building Safety Code Administrative Code section 303(a). \IHEREAS, the Applicant has submitted to the City a completed permit application, 3 (three) sets of construction drawings, specifications, and other data required for the City to complete the necessary plan review of the proposed development improvement. \IHEREAS, the intended development improvement is of a nature that requires no other review approval from other State or local agencies and is exempt from the criteria established by the Building Safety Division, attached as Exhibit A of this Agreement. \IHEREAS, the City has not reviewed or approved the submitted materials for the development improvement, the City is therefore unable to confirm at this time whether the permit applicatic~ submitted vill be approved, and vnether the ~equired construction permits can be issued. \IHEREAS, the applicant has requested the City to provide expedited authorization to proceed with certain phases of construction prior to the completion of the City's review of the permit application. \IHEREAS, the City's fee for the administrative services rendered in providing expedited authorization is $150.00. NOV, THEREFORE, in consideration of the foregoing recitals and of the mutual promises contained herein, the City authorizes immediate commencement of the development improvement specified in the permit application subject ,to the following terms and conditions: l' . " . . .. " , . Authorization to Proceed Agreement Page 2, 1. City agrees that the Applicant may immediately commence with the development improvements set forth in the permit application. City'S authorization to proceed is conditionep hovever~ upon Applicant's agreement that the project vill be constructed as set forth in the attached submitted drawings and specifications, except as may be modified by City, and will comply with all applicable laws and ordinances. Applicant's immediate commencement of constnlC.tion i""t Applicant's Olm risk. The City makes no assurance that the 3evelopment-or-construction improvements vill be approved or the required construction permits vill later be issued. 2. City agrees to review Applicant's permit application in the normal reviev process and to thereafter: . a) issue Applicant the appropriate construction permits; or b) advise Applicant of deficiencies in the proposed construction which must be remedied before permits can be issued; ~ c) advise Applicant of any statutes, ordinances or code provisions vith which Applicant must comply vith before City can issue the permit. 3. Applicant agrees that if City finds Applicant's permit application and submitted materials inadequate or deficient 1n any manner including but not limiteQ to, the application or the proposed construction do not comply vi'th all applicable statutes, ordinances or code provisions, Applicant viII expeditiously cure the deficiencies so that the City may issue the required permits. Should Applicant fail.to expeditiously correct submitted materials, or should correction prove impossible, City may in it's dis~retion, take any or all of the following actions: a) stop all further construction of the project in the manner prescribed in the Springfield Building. Safety Code Administrative Code (aSCAC), SECTION 201 (d) , b) order disconnection of serving utilities in a manner as prescribed'in, BSCAC, SECTION 201 (f) c) issue a NOTICE 12\J O~E~ for removal of all such v~rk in a manner as prescribed in BSCAC, SECTION 204. ABATE~ENT OF u~SAFE, SUBSTM~DARD OR DANGEROUS BUILDINGS, STRUCTURES OR BUILDING SERVICE EQUIPMENT. Upon receipt of such notice, Applicant shall immediately remove the work specified in the Notice and Order. 4. Applicant agrees, if the issuance of the permit is denied: - a) to remove, at the Applicant's sole cost and expense, all completed construction or improvements; and b) to restore the site or structure to it's pre-agreement condition and free of all hazards . . . . . .' Authorization to Proceed Agreement Page 3, 5. Applicant agrees that until Applicant's permit application is approved, construction will not to proceed beyond the point of authorization approved by the City's Building)lOfficial. Applicant's P01nt of Authorization is \\0 "V , f\f'\ 6. Applicant agrees that all ~ork p~formed under this agreement shall be accessible and exposed for inspection purposes and that neither the Building Official nor Cit~ shall be liable for the expense entailed in the removal or replacement of any material necessary to allov inspection, 7. Applicant agrees that any or all'deficiencies identified during the necessary inspections will be promptly remedied, at Applicant~s sole cost and expense before proceeding with any further construction. Applicant also agrees that these inspections do not replace the required plan review nor do they imply any approval of the submitted materials. 8. Applicant agrees that no work shall be done on any part of the building or structure beyond the point indicated in each successive inspection wi thout first obtaining the approval of t'he Building Official. Such approval shall be given only after an inspection has been made of each successive step in the construction as indicated on the attached Exhibit B. 9. Notwithstanding any other provisions of this Agreement, this Agreement shall terminate upon issuance of a building permit or" thirty (30) days from the date of this Agreement, whichever first occurs. Applicant understands that all work on the project shall imm~diately cease without any notice from the City if this Agreement terminates before F bU\'l~,g permit is issued. This agreement shall terminate on I - ~ -L{'1 10. Applicant agrees to defend, indemnify and hold City harmless from any and all costs (including attorney fees), liability or damages of any kind or nature whatsoever, for personal injury and property damage arising from the Applicant's early commencement of construction and the work undertaken or , completed. 11. The terms of this Agreement shall extend to and be binding upon the parties hereto and t:,eir heirs, successors and assigns. 12. If any suit, action or other proceeding, or an appeal therefrom, is instituted to obtain, establish, enforce, or compel any right or obligation resulting from this Agreement, the prevailing party shall be entitled to recover from the adverse party, in addition to costs and disbursements, such additional sums as the courts, both trial and appellate, may judge reasonable attorney fees. - . . " Authorization to Proceed Agreement Page 4. BEFORE SIGNING THIS AGREEMENT, PLEASE READ AND UNDERSTAND THE MEANING OF EACH PARAGRAPH OF THIS AGREEMENT. IT AFFECTS YOUR INTEREST~ IN THE PROFERTY AND, IN THE EVENT,OF DEFAULT, IT PLACES YOU PERSONALLY AT RISK AND THE SUBJECT PROPERTY AT RISK OF FORECLOSURE FOR COSTS AND EXPENSES INCURRED BY THE CITY IN ENFORCING THE TERMS OF THIS AGREEMENT. IN THE EVENT THAT YOU DO NOT UNDERSTAND ANY TERMS OR CONDITIONS OF THIS AGREEMENT, PLEASE SEEK ANY LEGAL OR OUTSIDE OPINIONS YOU MAY.DESIRE. CITY " APPLICANT: Ci ty of s,..'~"6GeTd ----.... -(" =:::::::::::::, ./ By.:....\_ ~\'-^~ Contractor ~~ ~ ~~ Business Name Building Official Address 3~ 1?1!WlH 1b1.uT6-~. CC Registration # ','}&4-'7CJ LAND/PROPERTY O\INER(S) I/YE HAVE READ THE ABOVE AUTHORIZATION TO PROCEED AGREEMENT. I/YE UNDERSTAND YHAT IT EXPRESSES AND THE RESPONSIBILITIES IT PLACES UPON US AS THE LAND/PROPERTY OYNERS. I/YE AGREE TO BE BOUND BY ALL TERMS AND CONDITIONS OF THE :::EME~>---~~ ~~ Address ~~ ~~_ ~ ~ ~ ~ \ 6'R. <f7 tf-Dg . F:EV;~\'/:[~ [;~ P.??r::C'VcD ~'):~:~':~['" j L~~.(___ U:!-E:~:O" ,"\\~"\~ ~ CfFi~~ c;:- Ci7'/ ATTO;:-;:.~~r::\' c~.:.~. _. ~':"::;r.~::::::-1::::L!) . . EXHIBIT A Purpose The purpose of this agreement is to allow 'certain d~elopment improvements to occur prior to obtaining plan reviev approval from the Springfield Community Services Division. Scope The use of this agreement shall be limited to certain one and tvo-family dwellings not complex in nature as determined by the Building Official and minor alterations or'modifications to existing commercial and industrial buildings which are of a non-structural"type and do not adversely affect any structural member of the building or any part of the building havi~g fire resistant construction. One and two-family dwelling plans for structures that are complex in nature that have been prepared by an Oregon licensed architect or engineer and accompanied by a letter of review'prepared by said architect or engineer, stating that the submitted material is in compliance vith the One and Two-Family Q.'elling Specialty Code, may be considered eligible fo~ this agreement. The following items include but are not limited to certain conditions of development identified as ineligible for this agreement: a) development requiring site approval vhich has not been obtained; b) new development located on land vith over six-percent slope; c) lots having expansive (clay) soil; d) 'development located within flood hazard areas; e) development located vithin vetland areas; f) pole buildings or other such type of structure that is not of conventionai construction. - , , , . EXHIBIT B RequireB Inspections To request an inspection, you must call 726-3769. All inspections requested before 7:00 a.m. will be Inspections requested after 7:00 a.m. will be made v v/ v/ ~ v/ c/ v/ ~ v / Temporary Electric . ~ This is a 24 hour recording. made the same working day, ~ , the fo11ow~ng work day. site - To be made after excavation, but prior to setting forms Footing - After trenches are excavated Foundation - After forms are erected but prior to concrete placement Underfloor Plumbing - Prior to filling trench Underf~oor Mechanica1 - Prior to insulation or decking Post & Beam - Prior to floor insulation or decking Underfloor Insulation - Prior to decking Sanitary Sewer - Prior to filling trench Storm Sewer - Prior to filling trench Water Line - Prior to filling trench . . .' PUBLIC II'OnKS DEPARTMENT /l.1}/tI,INIS 1 riAl/ON [NGINEEh/NG D/\'IS/(lN MAINTENANCE 2?5 Flrnl :;1, SP'~}NG{jr UJ. (Iii' . 11'-" AP~'L1CA'f10;FOR~ SEC~ND D~IVEW~-Y '-~VERW;DTH DR"VEWA'y I DATE:~ Oc.<... q(P APPLICANT (PROPERTY OWNER): h.l:hJ..\"e 13, .l-k.wu:L<.. I ADDRESS OF PROPERTY FOR' DRIVEWAY PERI.lIT: looc:; 6[,& 1')V"eMava. ~~ I APPlICANrs TELEPHONE I~UMBER: ~~. ~17(... ---_J Please sketch the proposed drive\'Jay. Include the following applicable ilems: house or building. proposed driveway. existing driveway, and street names. Include dimensions and measurements to plopcr1y lines, road intersections and bordering driveways. (See attachment (or an example.) ~u- ~ f'li%M.<O..: -:;;0' J. Yl \I'WJO. 'i Wi J. #\ ""^"'''\~ .1 I ,I II I -.," ALL APPLICATIONS OUTSIDE THE CITY LIMITS OF SPRINGFIELD THAT ARE WITHIN THE URBAN G:WWTIlIJOUNDARY REOUIRE A lJINE COUNTY PERMIT. Noie: The City of Springfield will not grant a second dfiveway per mil on an Arteria) or Collcctof Strccl. II /l.!lMIfI1/srr~ll1fn^,lf=fV~IfVFrrm\,r; (.r.n,?1 7::'(j..17!i.1 rAX {'in11 7.'lr..3r;.'1~ . . 1. Property type: Single f amil)' Residence _ OuptcK ~ Other_ 2. The proposed driveway will lake access from which street 3. Tha disl~nce from lhe ~dge of the dlive-way to tho nc;ucst cower (mcasUfcd to lhe.cJrlJ fcturn) is fcet. ... "-<<.llhe second drivc'"Yay will give access to: garage_ carport_ side yard_ Other ;' I I I Ii . 6. V'JiU the propOsed park.ing I storage area create 3. vision obstfUdio.n to adjacent propec:ty driveways or. to any vehicular movem~nt on a publ'ic street? (See vision clearance attachmentl , S. The dislance from (he plOper1y line 10 the garage, carport, fence. wall. or olher, (where 1I1c vehicle"is to be parked) is feel. . . Approeant hereby agrees 10 mstan U.e requested driveway 10 C~y 01 Springfoeld standaros. The applicantlurUler ~grees,toJuVe ,.. of concrete in the sidewalk area (adjacent to the drivew.y)";and to pave the area behind Ule ~ck edge of the sidewalk. Of driveway apron. with a niU;imym depth ~f 3~ asphattiC concrete Of ,- of portland cement concrete. The area behind the sidewalk shaD be paved a minimum of 18 feeL The apprtCant agrees that it he/she does not pave the area behind the sidewalk wiU1in' 30 days of cutting the curb opening, the City of Springfield has the authority to close tlle drive,^,'3Y access by removal of the cum cul An incUm!d costs shan be assumed by the apprfCant and if unpaid. said cost shalt become a rten of the property. ~l;J When this app6cation is approved by the City, the applicant must obtain a curbcut/drivcway permit from the Public Works Department, Engineering Division. Curbcu11 Drivewav Permil Fee 3. On 3n imp(oved street (existing curb): S10.00 plus S.tS per lineal foot of curb cut. b. On an unimproved street (no curb): St2.00 c. On currently unimproved streets that are under construction: S12.00 ,"w"rr ~0~ru~; ~.. APPROVED BY: \ ~ ~ '-"'" ([RAFflC DIVISION - i~hl DATE: 00\ .D/'TE:~(,... BUILDING PERr~IT NO,: 9(~/~(09 ,DATE: TRA 9,1 AITACHMENT: Vision Clearance, Example 1:1 . or I I I i 1\ I I I ! I , I I I II I I II _~J