HomeMy WebLinkAboutPermit Building 1998-6-14
,.. e .
SPRINGFIELD -_
.k-"..- r!}#111(IJN'1i1l"P'f11.'}{/~' ,
..... ,.,
.
NOTICE:
THIS PERMIT SHALL EXPIRE IF THE WORK
AUTHORIZED UNDER THIS PERMFf&P'~NTIAL PERMIT APPLICATION
COMMENCED ~tY OF SPRINGFIELD
OR IS ABANDONED rwRMuNITY SERVICES DIVISION
ANY 180 DAY PERIOD, BUILDING SAFETY
Page 1
Job Number: 980580
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 908 OLD ORCHARD LN
Assessors Map #: 17032343
Lot: 60 Block:
Tax Lot #: 03400
Subdivision: RIVER GLEN 1
OWner: FUTURE B HOMES
Address: PO BOX 7425
Phone #: 744-2660
City/State/Zip: SPRINGFIELD, OREGON 97477
Describe Work: S.F. RESIDENCE
NEW
Canst.
Contractor Contractor # Expires Phone
General: FUTURE B HOMES 0036499 05/18/00 744-2660
PO BOX 7425 EUGENE, OREGON 97401
Plumbing: CUSTOM PLUMBING 0081994 05/06/00 485-1146
3248 KENTWOOD DR EUGENE OR 97401000
Mechanical: ROLFS HEATING 0102455 10/04/98 686-4927
PO BOX 66 DEXTER OR 974310000
Electrical: BOB FISHER 0096275 01/25/98 689-7973
180 KINGSBURY AVE EUGENE OR 9740400
/,',
OFFICE USE ""
LAND USE: 1111
ZONING CODE: LDR
# OF BDRMS: 3
RANGE: E
# OF BLDGS: 1
OCCY GROUP: R3
HEAT SOURCE: FG
INSUL PATH: P1
QUAD AREA: 2RNW
# OF UNITS: 1
CONSTR, TYPE: VN
WATER HEATER: G
SQ FOOTAGE: 2278
To request an inspection, call the 24 hour recording- at 726-3769.
All inspections requested before 7:00 a,m. will be made the same working day,
inspections requested after 7:00 a.m. will be made the following work day.
REQUIRED INSPECTIONS ---
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement,
ROUGH GAS - after line is installed and capped if not attached to an
appliance
UNDERFLOOR PLUMBING - Prior to insulation or decking,
UNDERFLOOR MECHANICAL - Prior to insulation or decking.
POST AND BEAM - Prior to floor insulation or decking.
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
STORM SEWER LINE - Prior to filling trench.
WATER LINE - Prior to filling trench,
SANITARY SEWER LINE - Prior to filling trench,
SHEAR WALL NAILING - Before covering sheathing with finish materials.
ROUGH MECHANICAL - Prior to cover.
ROUGH PLUMBING - Prior to cover,
ROUGH ELECTRICAL - Prior to cover,
ELECTRICAL SERVICE - Must be approved to obtain permanent power,
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
DRYWALL - Prior to taping,
SIDEWALK - After excavation is complete, forms and sub-base material
in place,
. .;"~~,.~~. :h
. ~ tit. , tlJi/J.YU(f/Nrf;/:ti/P,h.(o)N=( 0 :'
Job Number: 980580
CURBCUT - After forms are erected but prior to placement of concrete.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete,
FINAL ELECTRICAL - When all electrical work is complete,
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
Page 2
Lot Faces: S
Topography: 2
Solar Approved: Y
Lot Coverage: 30 %
Setbk From NPL: 65
Lot Sq. Ft.: 7492
Total Height: 22
Lot Type: INTERIOR
Setbacks
S W E
10 8
N
House 42
Garage
18
Item
Main
Garage
Total Value
BUILDING PERMIT ---
Square Feet x
1802
476
$/square Feet
64.66
16.26
Building Permit Fee
Surcharge/Admin
TOTAL FEE
(A)
PLUMBING PERMIT ---
Item
Residential Bath(s)
2
Plumbing Permit
Surcharge/Admin
TOTAL CHARGE
(C)
--- MECHANICAL PERMIT ---
Furnace
Exhaust Hood
Vent Fan
Dryer Vent
GAS LINE/WH VENT
3
Mechanical Permit
Issuance
Surcharge/Admin
TOTAL PERMIT
(D)
--- MISCELLANEOUS PERMITS ---
Svrcharge/Admin
sidewalk
Curb Cut
WILLAMALANE
SDC
ELECT. PERMIT
TOTAL MISCELLANEOUS PERMITS
(E)
, (Excluding Electrical)
unless otherwise noted
TOTAL AMOUNT DUE
(A, S, C, D, and E combined)
Value
116,517.00
7,740.00
124,257,00
489,25
39,14
528.39
Fee
160.00
160,00
12,80
172 . 80
6.00
4.50
9,00
3.00
5.00
27,50
10.00
2.21
39.71
0.00
19.90
14.05
1,000,00
2,514,36
140,40
3,688.71
4,429.61
. 'S~RINGFIELD., e .
. .~...-.. ~fI);t1.'f[./rf/A'[rfd/:tU'.klt1}((:{ 11 ;:
~~
Job Number: 980580
Page 3
.
--- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Development Code, regulating the construction and
use of buildings, and may be suspended or revoked at any time upon violation
of any provisions of said ordinances.
Plan Check Fee:
Received By:
Plans Reviewed By: TOM
Building Site Reviewed
318.01
Date Paid: 05/15/98
Receipt Number: 29857
MARX Date: 06/10/98
By: LISA HOPPER
--- ADDITIONAL COMMENTS ---
DRIVEWAY REQUIRED TO BE PAVED
2 STREET TREES REQUIRED
~y"signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all information hereon
is true and correct, and I further certify that any and all work performed
shall be done in accordance with the Ordinances of the City of Springfield,
and the Laws of the State of Oregon pertaining to the work described herein,
and that NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety, I further certify that only
contractors and employees who are in compliance with ORS 701,055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that each address is readable from the street, that the permit
card is located at the front of the property, and the approved set of plans
will remain on the site at all times during construction.
~Q-\tk~~~
. 19na~ <l
1
b/tz.-/rrf
Date I
-- - VALIDATION
Date Paid:
6S(50)
~ In-l q r
I...f L!2q H
02Nvf
Receipt Number:
Amount Received:
Received By:
, .
JOB NO. ttBCl.5BO
. AITACHMENT A .
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
NAME OR COMPANY:
~\ft.JdLcS
1-1 OM E--:'
B
LOCATION:
qoR en{) "'I2CHel.fZ.,O C.AAJIS-
.
DEVELOPMENT TYPE:
S FIZ-
BUILDING SIZE
lOT S[7F
SO, Ft,
1 , STORM ORA !NAGF
IMPERVIOUS SO FT, :<:6c,4
X $0,226 PER SO. FT, $ tR2. 4(.,
2. SANITARY SFwER-CITY
NO, OF PFU'S 20
(See Reverse Side)
X $46,86 PER PFU
$ Q37. 2J2
3, TRANSPORTATION
.NO OF UNITS X TRIP RATE X COST PER TRIP
J
X /'0 I X $472.49
$ 477.2.1
X
X $472,49
$
x
X $472,49
$
4. SANITARY SFWFR-MWMr
Du,,>
NO. OF FEU S
X 277."N. PER FEU + $10 MWMC/ADM FEE $ 2"7. 7b
MWMC CREDIT IF APPLI~ABLE (SEE REVERSE) $
TOTAl -MWMC sor $
SUBTOTAL (ADD ITEMS 1.2.3 & 4) $z:z,c:r4 C.)
,
5. AQMlNISTRATIVF FF~
BASE CHARGE (SUBTOTAL ABOVE) X .05
, $ lit(, 7~
&.
Date: _~-Z.t).,.9!)
TOTAL sor $? '7/4. ~
SDC Coordinator
, I '^ I un... UI~' ,', ....M.......U...M' IVIII I HOLe; Number ot New Fi_s X Unit Equivalent = Fixture )In,its
(NOTE: For remodels, calculate o.e NET additional fixtures). '
, NUMBER OF UNIT FIXTURE'
FIXTURE TYPE NEW FIXTURES EQUIVALENT UNITS
Bathtub......................,......".,...""".....,....,...",......" ...
Drinking. Fountain.,.....,..,.,...,.",...,.",.....".,........"."..
Floor Drain,........,..,....,....".....,...".,.,..,.....,......,..... .....
Interceptors For Grease/OiI/SolidsiEtc.................
Interceptors For Sand/Auto Wash/Etc..................
Laundry Tub/Clotheswasher...""..,...,...............",...
Clotheswasher - 3 Or More.....................................
Mobile Home Park Trap (1 Per Trailer)..................
Receptor For Refrigerator/Water Station/Etc........
Receptor For Commercial SinkiDishwasher/Etc..
Shower, Single Stall..,.............."..............................,
Shower, Gang............,.."., .."", ,.., ""."... .., .......,..",..
Sink: Bar. CommerCial. Residential Kitchen.......................,
Urinal, Stall/WaiL...;,..,.",...."........".,..,..,......"..."..".
Wash Basin/Lavatory, Single...."............................
Toilet, Public Installation,..,.."", ...., ........................
Toilet, Private..................., ,...... ............................
Miscellaneous:
7-
2
1
2
3
6
2
6
6
1
3
2
l/Head
2
2
1
6
4
'2
:z-.
4-
-z..
.......
2-
.....
e,
TOTAL FIXTURE UNITS
=
20
CREDIT CALCULATION TABLE: Based on assessed value,
calculate credits separates,
'i
If improvements occurred after annexation date in table,
1979 or before
1980
1981
1982
1983-
I 1984
IL' 1985
1986
,
$3.97
3.89
3.83
3.70
3.55
3.39
3.20
2.91
Year Rate per $1,000 r
Annexed Assessed Value
1987 $2.56
1988 2.17
1989 1.73
1990 1.31
1991 0.92
1992 0.74
1993 0.61
1994 0.45
1995 0.31
1996 0.17
Year
Annexed
Rate per $1,000
Assessed Value
Credit for Parcel or Land Only If Applicable
X $
(Rate X Assessed Value)
X $
_ (Rate X Assessed Value)
=
Improvement (if after annexation date)
=
CREDIT TOTAL = $
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
(For Estimating Purposes Only)
Residential,..:......,................ 0.4
Commerical............,............ 0.9
Industrial............................ 05
GovernmentaL..................... 0.5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT
~ . '
SYSTEM DEVELOPMENT CHARGE
WORKSHEET
NAME:~\l}\~&'~ PHONE: _\44-.0-,,&\1)
ADDRESS: ~ ~ ~ \4~ ~ I fOr-STATE: iQK.ZIP: qr\()(
LOCATION OF PROPOSED BU~,D1NG *E: _ _J lj
Street Address: (\ D9J \~\c\ N, ~nM ~ U)l1ILt-
Plat Name: ilt1,Q{ Cll\f1\ . Tax Lot Num~er: Vl0~~4~004ro
,....
.
Job. No.
..
.,
Q~(jtj~)
1. DEVELOPMENT TYPE (Check appropriate dwelling(s). SDC calculations and dwelling I
ype definitions are on the back.)
A. Sinolp.-F~milv Dp.f~chp.d
l Single Family home
NO. OF UNITS I
Manufactured home not in a park
X $1,000 per unit = $ (000 p~)
B. Sinole'.Familv Attached.
NO. OF UNITS
X $924 per unit = $
C. Multi-Familv Aoartment
NO. OF UNITS
X $692 per unit = $
D. MaPlJfAcflJred Home PAris.
NO. OF UNITS .
WILlAMALANE SDC
X $699 per unit =
$
2. SDC CREDIT (if applicable) SOG-payer must furnish proof of
Willamalane Credit approval. See SOC Credit Worksheet. $
3. TOTAL WILLAMALANE NET SDC ASSESSED
(if SDC reduced for Credil)
\lli\J t) It
Development S Date
City of Springfiel
$
I {2 I
$
I {]()O .dJ
f)
low .0 ()
7Y
..~
.
.
SPRINGFIELD
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
SPRINGFIELD. OR 97477
(541) 726-3753
FAX (541) 726.3689
CITY OF SPRINGFIELD
COMMUNITY 'SERVICES DIVISION
BUILDING SAFETY
AUTHORIZATION TO PROCEED AGREEMENT,
.
THIS AGREEMENT is entered into this d.7 day of 'iY\"-,,,~ ' ,'19GlOl by and
betveen the Ci ty ofSpringfielj1. a mun ifli pal. f:orpora tion 015 the Sta te ~ Oregon,
'hereinafter called, Ci ty ,'and -t\lfullL \..,' \ ~O[) , ,'hereinafter called
the' Applicarlt: '
YHEREAS, the applicant has applied to the City community Services Building
Division ,for issuance of certainl\colllstR'ac;,t~n permitsJor development '
improvements to be located at \..\()~ \\Uf\ t\)r(\~J\(\ :\\Ilno---, Springfield,
Oregon ()r vithin, the City's. Urban Gro~th JJlri,SQiV1!lrfArea; Lane 'County' , ,
Assessor's Map and .Tax Lot number . \'1l)~"~ r (), " .
YHEREAS, 'the applicant has asked, the City to authorize the Applicant to
immediately commence development improvements vithout a completed 'plan reviev or
subsequent approval as required by the Springfield Building Safety 'Code, '
.Administrative Code section 303(a) ,
. , ,
\!HEREAS, .the Appli~~t has submitted to the City a completed permit application,
3 (thr~e) sets, of-construct,ion dravings, specificaUons, and, other, data required
for the City to ,complete the necessary plan'reviev of the proposed development
improvement. , ,
\1HE~AS, the intended development improvemeilt is of a nature that 'requires no
other reviev approval from other State or local agencies and is 'exempt from the
criteria established by the 'Building Safety Diyision, attached' as Exhibit A of
this Agreement. ", . ,',' ',' , ' ,
YHEREAS, the City has not revieved or approved the submitted materials for the
developDierit improvement, the ,Ci ty is, therefore unable to confirm a t this time
' 'vhether the permit applicati~~ submitted viII be approved, and vnether the
J;;equired construction permits can beisstied.
'YH,EREAS, ',the !1Pplicimt has' req~ested the Ci ty to ,provide expedi ted authorization
to proceed vith certain phases of construction prior to the completion of 'the
City'S ,reviev of the permit application;
IlHEREAS, the City's fee for the administrative services rendered in providing
expedited authorization is $150.00.
,NOV, THEREFORE, in,consideration of the foregoing recitals and of the mutual
promises contained herein; the City authorizes immediate commencement of the
development improvement specified in the, permit application subject to the, '
folloving terms and conditions:
~
.
.
Authorization to Proceed Agreement
Page 2.
1. City agrees that the Applicant may immediately commence vith the
development improvements set forth in the permit application. City's
authorization to proceed is conditionep 'hovever, upon Applicant's agreement
that the project viII be constructed as set forth in the attached submitted
dravings and specifications, except as may be modified by City, and viII
comply vith all'applicable lays and ordinances. Applicant's' immediate
commencement of construction is at Applicant's ovn riSK. The City makes no
assurance that the deve~opment or construction improvements vill 'be approved
or the required constructlon permits vi~l later be issued. '
2. City agrees to reviev Applicant's permit application in the normal reviev
process and to thereafter: .
a) issue Applicant the appropriate construction permits; ~
b) advise Applicant of deficiencies in the proposed construction vhich'
,must be remedied before permits can be issued; ~
c) advise Applicant of any statutes, ordinances or code provisions vith
vhich Applicant must comply vith before City can issue the permit.
3. Applicant 'agrees 'that if City finds Applicant's permit application and
submitted materials inadequate or deficient in any manner including.but not
limited to, ',the application or the,proposed construction do not comply vith
all applicable statutes, ordinances or code provisions, Applicant viII
,expeditiously cure the deficiencies so that the City may issue the required
permits. Should Applicant fail',to expeditiously' correct submitted'materials,
or should correction prove impossible, City may in it's discretion, 'take any
or all of the jolloving actions:
a) stop,all further ,construction of the project in the manner 'prescribed,
in the Springfield Building Safety Code Administrative Code (BSCAC),
SECTION 201 (d)
b) order disconnection of serving utilities in a manner as prescribed in
BSCAC, SECTION 201 (f) ,
c) issue a NOTICE J~\? ORDER for removal of all such york in a manner as,
prescribed in BSCAC, SECTION 204. ABATEMENT OF UNSAFE, SUBSTANDARD O~
DANGEROUS,BUILDINGS, STRUCTURES OR BUILDING SERVICE EQUIPMENT. Upon
receipt of such notice, Applicant 'shall'immediately' remove, the york
specified in the Notice and Order.
4. Applicant agrees, if the issuance of, the permit is denied:'
a) to remove, at the Applicant's sole cost and expense, all completed
construction or improvements; and
b) to restore the site or structure to it's pre-agreement condition and
free of all hazards
.
e
Authorization to Proceed Agreement
Page 3.
5. Applicant agrees that until Applicant's permit application is approved,
construction will not to proceed beyond the point of authorization approved
by the City's Building Official. Applicant's Point of Authorization is '
" (\U\l( 1[\'\ ' ,~
6. Applicant agrees that all work ~erformed under this agreement shall be
accessible and exposed, for inspection purposes and that neither the Building
Official nor City shall be liable for the expense entailed in the removal or
replacement of, any material necessary to allow 'inspection.
7. Applicant agrees that any or all'deficiencies' identified during the
necessary inspections will ,be promptly remedied, at Applicant'S sole cost
and expense before ,proceeding vith' any further construction. Applicant also
agrees that these inspections do not replace the requ{red plan review nor do
they imply any approval of' the submitted materials.
8. Applicant agrees that no work shall be done ,on any part of the building
or structure beyond the point indicated in each successive inspection
without first obtaining, the approval of the Building'Official. Such 'approval
shall, be given only after an inspection has been made of each successive
step in the construction',as indicated on the attached Exhibit B.
9. Notvith~tandiDg any otber provisions of tbis Agreement, tbis Agreement'
'shall terminate upon ,isSuance of a building permit or thirty (30) ,days from
tbe, date of tbis Agreement, wbichever first occurs. ,Applicant understands
that all work on tbe project shall immediately cease without any notice from
the City if this Agreement terminates before a building pe~it'is issued.,
This agreement shall terminate on . '
'10. Applicant agrees to defend, 'indemnify and hold 'City harmless from any,
and all costs (including attorney fees), liability or damages of any' kind or
nature vhatsoever, for personal injury anq,property damage arising from the
Applicant'S early commencement of construction and the work undertaken or
completed. '
11. The terms of this Agreement shall extend to and be binding upon the
parties hereto and theiF heirs, successors and assigns.
12. If any suit, action ,or other pro'ceeding, ,or an appeal therefrom, is
instituted to obtain, establish, enforce, or compel any right o~obligation
resulting from this Agreement', the 'prevailing party shall be entitled to
recover from the adverse party, in addition to costs and disbursements,' such
additional sums as the courts, both trial and appellate,may judge
reasonable attorney fees.
.
e
Authorization to Proceed Agreement
Page 4
BEFORE SIGNING THIS AGREEMENT, PLEASE READ AND UNDERSTAND THE
MEANING OF EACH PARAGRAPH OF THIS AGREEMENT. IT AFFECTS ,YOUR
INTERESTS IN THE PROPERTY AND, IN THE EVENT OF. DEFAULT, IT PLACES
YOU PERSONALLY AT RISK AND THE SUBJECT PROPERTY AT RISK OF
FORECLOSURE ,FOR COSTS AND EJq.'ENSES INCURRED BY THE CITY IN
ENFORCING THE TERMS OF THIS AGREEMENT. IN THE EVENT THAT YOU DO
NOT UNDERSTAND ANY TERMS OR CONDITIONS OF THIS AGREEMENT, PLEASE
SEEK ANY LEGAL OR OUTSIDE OPINIONS YOU MAY DESIRE.
city of Springfield
APPLICANT \ \ \~ ~
Contractor ~\ ~O ,~_~)
CITY
By:
Business Name
Building Official
Address ~ \\ (~\ '\\fl C)' (r~
cc Registration # ~ ~(O ~C\
LAND/PROPERTY OWNERCS'
I/WE HAVE READ THE ABOVE. AUTIIORI:ZATION To PR~EED AGREEMENT. X/WE',
UNDERSTAND WltAT IT EXPRESSES AND THE RESPONSIBILITIES IT PLACES
OPONUS ~S TilE LAND/PROPERTY OWNERS. I/WE AGREE TO BE BOUND BY ALL'
TERMS AND CONDITIONS OF THE AGREEMENT.
~:::ess ~-,::;~ ~':;JJ'. ~<-
V-, ' ,'~Q ,
VALIDATION:
CITY JOB #
C1 ~tF:l6D
I<ECEIPT NUMBER .3 00 (7
<5-.:z.1-4i
AMOUNT RECEIVED .$ I~ .-
~
DATE PAID
RECEIVED BY
.
.
EXHIBIT,A,
Purpose
The purpose of this agreement is to alloy 'certain development improvements to
occur prior to obtaining plan reviev approval from the Springfield Community,
Services Division.
s~ope
T e use of this agreement shall be limited to certain one and tvo-family
dvellings not complex in nature as determined by the Building Official and
minor alterations or modifications to existing commercial and industrial
buildings vhich are of a non-structural'type and do not adversely affect any
structural,member of the building or any part of the building having fire
,resistant const'ruction.
One and tvo-family dvelling plans for structures that are complex ,in nature that
have been prepared by ari Oregon licensed architect or engineer and accompanied.
by a letter of reviell prepared by said architect or engineer, stating that the'
,submitted material is in' compliance lIith the One and Two-Family Dvelling
Specialty Code, may be considered eligible for this agreement.
Thefollolling items include but are not limited to certain conditions of
development identified as ineligible for thiS agreement:'
a) development requiring site approval IIhich,has not been obtained;
b) nell development located on land vith over six-percent slope;
c) lots having expansive (clay) soil;
d) development located vithin flood hazard areas;
e) development located IIi thin vetland areas;
f) pole buildings ~r other such type of structure that is not of conventional
construction.
,
,
.
.
e
EXHIBIT B
,
Required Inspections
To request an inspection, you 'must ,call 726'-3769.
All inspections requested before 7:00 a.m. will be
Inspections requested after 7;00 'a.m. will be made
This is a 24 hour recording.
made'the same working day,
the following. work day.
Temporary Electric
site'- To be made after excavation, but prior to setting forms
Footing - After, trenches ,are excavated
Foundation
After forms are erected but prior to concrete placement
Underfloor Plumbing ,'- Prior ,to filling trench
Underfloor Mechanical - Prior to insulation or ,decking .,
Post,& Beam - Prior to floor insulation or ~ecking
Underfloor Insulation - Prior to decking
.
sanitary Sewer - Prior to filling trench
storm Sewer - Prior to filling trench
...:
Water'Line ,- Prior, to ~iliing,trench
'.'