RESIDENTIAL PERMIT APPLICATION
CITY OF SPRINGFIELD
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
Job Number: 980581
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 872 OLD ORCHARD LN
Assessors Map #: 17032343
Lot: 57 Block:
Tax Lot #: 03100
Subdivision: RIVER GLEN 1
Owner: FUTURE B HOMES
Address: PO BOX 7425
Phone #: 744-2660
City/State/Zip: EUGENE, OREGON 97401
Describe Work: S.F. RESIDENCE
NEW
Canst.
Contractor Contractor # Expires Phone
General: FUTURE B HOMES 0036499 05/18/00 485-3176
PO BOX 7425, ','
Plumbing: CUSTOM PLUMBING 0081994 05/06/00 485-1146
3248 KENTWOOD DR EUGENE OR 97401000
Mechanical: ROLFS HEATING 0102455 10/04/98 686-4927
PO BOX 66 DEXTER OR 974310000
Electrical: BOB FISHER 0096275 01/25/00 689-7973
,
180 KINGSBURY AVE EUGENE OR 9740400
-- OFFICE USE --
QUAD AREA: 2RNW LAND USE: 1111
# OF UNITS: 1 ~~NING CODE: LDR
CONSTR, TYPE: VN ' r/t, -i7~}lDRMS: 3
SECONDARY HEAT: FP Vs ,(iIf'i~ HEATER: G
INSUL PATH: PI -1l1rlt~(/4f~~GE: 2404
001,1. vlj/~t::l' '-1ll ~
To request an inspectioft&,yd!1:2lIoti" C;Wo#~u0',lfI1,!:'ording at 726-3769.
lOOn DOlT "/of/S /t::,,/t,
All inspections requested be~d1~~'06S4~ WO~A).>.e~~ the same
inspections requested after 7: 00 a;lj>~wfi4'~~:({{e'srv;e ~ollowing
. Dt::Q Or
REQUIRED INSPECTIONS ~-
# OF BLDGS: 1
OCCY GROUP: R3
HEAT SOURCE: FG
RANGE: E
working day,
work day.
TEMPORARY POWER
FOOTING - After trenches are excavated,
FOUNDATION - After forms are erected but prior to concrete placement.
POST AND BEAM - Prior to floor insulation or decking.
UNDER FLOOR MECHANICAL - Prior to insulation or decking.
UNDER FLOOR PLUMBING - Prior to insulation or decking.
SANITARY SEWER LINE - Prior to filling trench,
STORM SEWER LINE - Prior to filling trench,
ROUGH GAS - after line is installed and capped if not attached to an
appliance
STORM SEWER LINE - Prior to filling trench.
POST AND BEAM - Prior to floor insulation or de9king.,
INSULATION - ' Floor;," prior :to 'dei::k'ing' Wall/Ceiling ;p'rior, to cover
ROUGH MECHANICAL - Prior to cove~.
ROUGH PLUMBING - Prior to cover,
ROUGH ELECTRICAL - Prior to co;:er.. ....,'.. . ,..""
'ELECTRICAL SERVICE :-..Must-be' a'f'proved 'to" obtain permanent, power':
FRAMING - Prior to cover. .'- ,
SHEAR. WALL NAILING ;<-' ..Be'fo~e (:/avering sheathing with finish materfals".'
INSULATION - Floor ; "i>I'ior to:, decking' wall/Ceiiing; Prior to "cover'
DRYWALL - Prior to' taping;.' . .: J
GAS SERVICE,,- After line is:installed'and line has been' connected:to'a
minimum .o~ one ~PP~'iaIlte. Pressure test. done' at this. poin,.t. .:....
}~'. .'
"
:- ..
)
.;.....
.. "
.' ..'
. :.~ .....
~'" .
ri,PR ^~~A,C:FIE,_L_D,--:I"_",,, 1 , .
L,~ ~ (!1jij)J' (El;i ~.iHJJ..Ii!.M.;I/:j [J 0 ~ Co l~ I
: ~ ~(,j
Job Number: 980581
CURBCUT - After forms are erected but prior to placement of concrete.
SIDEWALK - After excavation is complete, forms and sub-base material
in place.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL GAS - When all gas work is complete.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
Page 2
','
Lot Faces: S
Setbk From NPL: 75
Lot Sq. Ft.: 9779
Solar Approved: Y
Total Height: 22.5
Lot Type: INTERIOR
N
Setbacks
S W
E
9
House
Garage
30 9
Item
Main
Garage
Total Value
BUILDING PERMIT ---
Square Feet x
1841
563
$/square Feet
64.66
16.27
Building Permit Fee
Surcharge/Admin
TOTAL FEE
(A)
PLUMBING PERMIT ---
Item
Residential Bath(s)
2
Plumbing Permit
Surcharge/Admin
TOTAL CHARGE
(C)
--- MECHANICAL PERMIT ---
Furnace
Exhaust Hood
Vent Fan
Wood Stove/Insert/Fireplace Unit
Dryer Vent
GAS LINE & W/H VENT
3
Mechanical Permit
Issuance
Surcharge/Admin
TOTAL PERMIT
(D)
MISCELLANEOUS PERMITS
Surcharge/Admin
Sidewalk'
Curb Cut
WILLAMALANE S/D/C',S
SPLFD S/D/C'S.
, ELECTRICAL'PERMIT
.... '
.......
....u~ ",
TOTAL ,MISCELLANEOUS: PERMItS
(EL
"
'. ,
1~.. .'
'. i
/.
J
':";.
, -
~'" .
Value
119,039,00
9,160,00
128,199,00
498.25
39,86
538.11
Fee
160.00
160,00
12.80
172.80
12.00
4,50
9,00
4.50
3.00
5.00
38,00
10.00
3.04
51.04
0,00
20,.65
14,35
", '1,000.00
2,598..60
140,40
3,774.00
"
C,S~~~,FIELD,' ..' Jw~"u'), (OlJtw I
:, ~:!1('O 1
, ~ "-J
Job Number: 980581
Page 3
(Excluding Electrical)
unless otherwise noted
TOTAL AMOUNT DUE
(A, B, C, D, and E combined)
4,535.95
--- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT ---
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Development Code, regulating the construction and
use of buildings, and may be suspended or revoked at any time upon violation
of any provisions of said ordinances.
"
Plan Check Fee: 323,86 Date Paid: 05/15/98
Received By: AL WARD
Plans Reviewed By: BOB BARNHART Date: 06/12/98
Building Site Reviewed By: LISA HOPPER
Receipt Number: 29856
--- ADDITIONAL COMMENTS ---
PATH 1
DRIVEWAY REQUIRED TO BE PAVED
2 STREET TREES REQUIRED
By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all information hereon
is true and correct, and I further certify that any and all work performed
shall be done in accordance with the Ordinances of the City of Springfield,
and the Laws of the State of Oregon pertaining to the work described herein,
and that,NO OCCUPANCY will be made of any structure without'permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that each address is readable from the street, that the permit
card is located at the front of the property, and the approved set of plans
will remain on the site at all times during construction.
}~\J. 11.-1 ~~
(Sl1Jtu~
"/''1- /9Y'
Date
Date Paid:
fbO~LIDATION
to . \~ .C{<&
~~Gt
Receipt Number:
Amount Received:
Received By:
t._,
,-. . : . - -. ...... .- ,~.
';':
. ,~J
......
,," .'
.',,'
.:.<: .'
I
,
.'.
." .,'
". ...
~'" .
. . JOB NO. q;'0S81
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
NAME OR COMPANY:
Fd-rUR.6 B /-10_ 5"'>
LOCATION:
g 7 2..... IJLO I"'JI2D.J.4U) LA-Uo
.
DEVELOPMENT TYPE:
< F /2-.
BUILDING SIZE
lOT SIZE
<;0 Ft,
1. STORM nRAINAr:;:;:
IMPERVIOUS SO, FT,
z,.4-/9
"
x $0.226 PER SO, FT, $ 772,{.q
2, SANITARY SF~FR-rrTY
NO, OF PFU'S ~c)
(See Reverse Side)
x $46,86 PER PFU
$ 937.2()
3, TRANSPORTATION
'NO OF UNITS X TRIP RATE X COST PER TRIP
X 1,01 X $47249
$ 4- 77. z.1
X
X $472,49
$
X
X $472,49
$
4. SANITARY SFWFR-MWMr
, f)V/~
NO. OF fEtJ'S 1 } 27.7. it. PER FEU + $10 MWMClADM FEE $ 2f1,7.7,..;;
MWMC CREDIT IF APPLICABLE (SEE REVERSE) $
TOTAL -MWMr. SOr. $ 287. 7c:;;.
SUBTOTAL (ADD ITEMS 1.2.3 & 4) $ 2/1-74-, 8b
5, ADMINISTRATTVF FFF<;
BASE CHARGE (SUBTOTAL ABOVE) X .05
'$ 12..3, 74
Date:
SDC Coordinator
TOTAL snr. $ 7.SQS.r;.O
,I '^' vn... VI~'I,",H"',",VLH IIUIII I J-\DLC; Number 01 New Fixt. X Unit Equivalent" Fixture Units.
(NOTE: For remodels. calculate on. NET additional fixtures) ,
, NUMBER OF 'UNIT FIXTURE
FIXTURE TYPE NEW FIXTURES EQUIVALENT UNITS
Bathtub..........................,...",................................... ..
Drinking. Fountain.......,."".,...,.".".,.,.......,..,.."..."....
Floor Drain. ............,..............,....".,."............. ,...........
Interceptors For Grease/Oil/Solids/Etc......,..........
Interceptors For Sand/Auto Wash/Etc..................
Laundry Tub/Clotheswasher..................... ..............
Clotheswasher - 3 Or More..........,.....................,....
Mobile Home Park'Trap (1 Per Trailer)..................
Receptor For Refrigerator/Water Sration/Etc........
Receptor For Commercial Sink/Dishwasher/Etc..
Shower, Single Stall....., '.........., ,.........,......:............,
Shower. Gang............,..".......""",.......,...................
Sink: Bar, CommerCial. Residential Kitchen...............,....,..,
Urinal, Stall/Wall........."""....""".,....,.,..,..................
Wash Basin/Lavatory, Single..,...............................
Toilet. Pubiic Installation.........., ..,.. ....,.........,....,....
Toilet, Private............,.. ......, ",........................'.....
Miscellaneous:
'2-
2
1
2
3
6
2
6
6
1
3
2
i/Head
2
2
1
6
4
"2.-
'2-.
TOTAL FIXTURE UNITS
=
z..o
, .
"2-
4.
'2-.
2-.
'Z..
8'
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occurred after annexation date in table,
calculate credits separates.
Year
Annexed
Rate per $1,000
Assessed Value
Year
Annexed
1979 or before
1980
1981
1982
1983'
1984
1985
1986
$3.97
3.B9
3:83
3.70
3.55
3.39
3.20
2.91
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
Rate per $1,000
Assessed Value
.I
$2.56
2.17
1.73
1.31
0.92
0.74
0.61
0.45
0.31
0.17
Credit for Parcel or Land Only If Applicable
=
- -,
--
X $
IRate X Assessed Value)
X $
, (Rate X Assessed Value)
Improvement (if after annexation datel
=
CREDIT TOTAL = $
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
(For Estimating Purposes Only)
fiesidential...:....................... 0.4
Commerical......................... 0.9
Industrial............................ 05
Governmental....................., 0.5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT
I..
.
.
Job. No.
~~tJ~~ \
.,
.,
SYSTEM DEVELOPMENT CHARGE
WORKSHEET
NAME: ~\ \\u.1l ~ . ~O 0 ' PHONE: _'144 .WeD
ADDRESS:\..~ ~ ~~ flA-'l.~ - STATE:tJfL ZIP: Q l40J
LOCATION OF PROPOSED BUILDING S,R~:_~ _ '
Street Address: R~Q _ ~(\ ~r\ ~ fit---
Plat Name: W< ~\o I"' "'Tax Lot Number: '\~'LYt~03l00
1. DEVELO.PMENT TYPE (Check appropriate dwelling(s). SOC calculalions and dwelling I
ype definiliolls are on Ihe back.)
A. Sinole-Familv DetacheQ
L
Single Family home
NO. OF UNITS
t
Manufactured home not in a park
X $1,000 per unit = $ !100 ~
B. Sinole'-Familv Attached
NO. OF UNITS
X $924 per unit = $
C. Multi-Familv ADartment
NO. OF UNITS
X $692 per unit = $
D. Manllfactllreo Home PR~
NO. OF UNITS
X $699 per unit = $
$ I ()OO .00
ff
$ 1O(DQJ
\0 I~~
Date
WILLAMALANE SDC
2. SDC CREDIT (If applicable) SOc-payer must furnish proof of
Willamalalle Credit approval. See SOC Credit Worksheet. $
3. TOTAL WILLAMALANE NET SDC ASSESSED
(If SOC reduced for Credit)
'i.~p~t , ;" epa"m,",
City 01 Springfield
e
.
SPRINGFIELD
DEVELOPMENT SERVICES DEPARTMENT
225 F.IFTH STREET
SPRINGFIELD. OR 97477
(541) 726-3753
FAX (541) 726-3689
CITY OF SPRINGFIELD
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
AUTHORIZATION TO PROCEED AGREEMENT .
THIS AGREEMENT is entered into this d-.7 day of ~r " ,19 oj by and
betv~en the Ci ty of~pringfiel.9,. a munif.f.paL,corpo!;il'tj,on ~t the St~te -1t Oregon,
herelnafter, called, Clty, ,and ~ililJlSl',,,)\ 'j~ . ,'herelnafter calle,d
the' Applicant., " " ' ,
VHEREAS, the applicant has applied to the
Division ,for issuance of certai~~~st c
improvements to be located at X'Iz...
Oregon or vi thin, the Ci ty' s Urban Gr vth
Assessor's Map and ~ax Lot 'number
City communit~y Services Building
i p mi ts.1 f development '
ftr, ' ' Springfield,
Juns lctlOnal~ ea; Lane 'County,.' ,
IN')" ,
VHEREAS, the applicant has asked, the Ci ty to authorize the Applicant to
immediately commence development improvements vi thout a completed 'plan r,eviev or
subsequent approval as required by the Springfield Building Safety 'Code, '
.Adm~lIistrative Code section 303(a) ,
\(HEREAS, . the Applicant has ,submitted to, the Ci ty a completed permit application,
3' (three) sets,of-constructjon dravings, specifications, and, other, data required
for the City to ,complete the necessary, plan'reviev of the proposed development
improvement. , , '
VHE~AS, the intended development improvement is of a 'nature that 'requires no
other reviev approval from other State or local agencies and is 'exempt from the
criteria established by the.-Building Safety Dixision, attached' as Exhibit A of
this Agreemen t.' , ,
VHEREAS, the City has 1I0t revieved or approved the submitted materials for the
development improvement, the ,City is, therefore unable to confirm at this time
'vhether the permit applicati~~ submitted vill be approved, and "'nether the
,equired, construction permits can be issued.
'VHEREAS, the applicant ha; req~ested the City to ,provide expedited authorization
to proceed vith certain phases of construction prior to the completion of 'the
City's reviev of the permi t application;
li'HEREAS, the City's fee for the administrative services rendered in providing
expedited authorization is $150.00.
,NOV, THEREFORE, in:consideration of the foregoing recitals and of the mutual
promises contained herein; the City authorizes immediate commencement of the
development improvement specified in the, permit application subject to the'
folloving terms and conditions:
-.
e
.
Authorization to ,Proceed Agreement
Page 2.
1. City agrees that the Applicant may immediately commence vith the
development improvements set forth in the permit application. City's
authorization to proceed is conditione~ 'however, upon Applicant's, agreement
,that the project will be constructed as set forth in the attached submitted
drawings and specifications, except as may be modified by City, and will
comply with all'applicable laws and ordinances. Applicant's' immediate
commencement of construction is at Applicant's ovn risk. The City makes no
assurance that the development or construction improvements vill'be approved
or the required construction permits vill later be issued.
2. City agrees to review Applicant's permit application in the normal reviev
process and to thereafter: .
a) issue Applicant the appropriate construction permits; ~
b) advise Applicant of deficiencies in the proposed construction which
,must be remedied before permits can be issued; or
c) advise Applicant of any stat~tes, ordinances or code provisions with
which Applicant must comply with before City can issue the permit.
3. Applicant 'agrees that if City finds Applicant's permit' application and
submitted materials inadequate or deficient in any manner including.but not
limi ted to, 'the application or the, proposed construction do not comply vi th
all applicable statutes, ordinances or code provisions, Applicant viII
,expeditiously cure the deficiencies so that the City may issue the required
permits. Should Applicant fail'to expeditiously' correct submitted'materials,
or should correction prove impossible, City may in it's discretion, ,take any
or 'all of the'jolloving actions: '
a) stop,all further ,construction of the project in the manner prescribed,
in ~he Springfield Building Safety Code Administrative Code (BSCAC),
SECTION 201 (d)
b) order disconnection of serving utilities in a manner as prescribed in
BSCAC, SECTION 201 (f)
c) issue a NOTICE J~\J ORDER for removal of all such york in a manner as '
prescribed in BSChC, SECTION 204. ABATEMENT OF UNSAFE, SUBSTANDARD O~
DANGEROUS ,BUILDINGS, STRUCTURES OR BUILDING SERVICE EQUIPMENT. Upon
receipt of such notice, Applicant 'shall ' immediately' remove, the work
specified in the Notice and Order.
4. Applicant agrees, if the issuance of, the permit is denied:'
a) to remove, at the Applicant's sole cost and expense, all completed
construction or improvements; and
b) to restore the si te or structure 'to it's pre-agreement condition and
free of all hazards
e
.
Authorization to Proceed Agreement
Page 3_
5. Applic~t agrees that until Applicant's permit application is approved,
construction viII not to proceed beyond the point of authorization approved
by the City's ~uilding Official. Applicant's Point of Authorization is ~
(,\0,,\,-,:\, , , .
6. Applicant ag;:e;:h~t all york performed under this agreement shall ~e
accessible and exposed for inspection purposes and that neither the Building
Official nor City shall be liable for the expense entailed in the removal or
replacement of, any material necessary t,o allov'inspection.
7. Applicant agrees that any,or all'deficiencies identified during the
necessary inspections will ,be promptly remedied, at Applicant's sole cost
and expense before ,proceeding with' any further construction. Applicant also
agrees that these inspections do not replace the required plan review nor do
they imply any approval of' the submitted materials.
8. Applicant agrees that no work shall be done on any part of the building
or structure beyond the point indicated in each successive inspection
without first obtaining, the approval of the Building'Official. Such approval
shall, be given only after an inspection has been made of each successive
step in the construction ,as indicated ,on the attached Exhibit B. ,
9. Notvith~tandiQg any other provisions of this Agreement, this Agreement'
'shall terminate upon ,isSuance of a building permit or thirty (30) ,days from
the, date of this Agreement, yhichever first occurs. "Applicant understands
that all york on the project shall immediately cease yithout any ,notice from
the City if this Agreement terminates before a building per~it'is issued.,
This agreement shall terminate on . '
'10. Applicant agrees to defend, indemnify and hold 'City harmless from any
and all costs (including attorney fees), liability or damages of 'any'kind or
nature whatsoever, for personal injury anq,property damage arising from the
Applicant'S early commencement of construction and the york undertaken or
completed. '
11. The terms of this Agreement shall extend to and be binding upon the
parties h~reto and their heirs, successors and assigns.
12. If any suit, action or other pro'ceeding,or' an appeal therefrom, is
instituted to obtain, establish, enforce, or compel any right or'obligation
resulting from this Agreement', the prevailing party shall be entitled to
recover from the adverse party, in addition to costs and disbursements, such
additional sums as the courts, both trial and appellate, may judge
reasonable attorney fees.
e
.
Authorization to Proceed Agreement
Page 4
BEFORE SIGNING THIS AGREEMENT, PLEASE READ AND UNDERSTAND THE
MEANING OF EACH PARAGRAPH OF Tius AGREEMENT. IT 'AFFECTS ,YOUR
INTERESTS IN THE PROPERTY AND, IN THE EVENT OF,DEFAULT, IT PLACES
YOU PERSONALLY AT RISK AND THE SUBJECT PROPERTY AT RISK OF
FORECLOSURE ,FOR COSTS AND EX~ENSES INCURRED BY THE CITY IN
ENFORCING THE TERMS OF THIS AGREEMENT. IN THE EVENT THAT YOU DO
NOT UNDERSTAND ANY TERMS OR CONDITIONS OF THIS AGREEMENT, PLEASE
SEEK ANY LEGAL OR OUTSIDE OPINIONS YOU MAY DESIRE.
CITY
APPLICANT
~UQ. ~( ~On
city of Springfield
,contractor
By:
Business Name
Building Official
Address ~~~ f\41L~IQ1~'
CC Registratio'n # ~LMq
LAND/PROPERTY OWNER(S,
I/WE HAVE READ THE ABOVE AUTHOlUZATION TO PROC.EED AGREEMENT. I/WE.
UNDERSTAND WHAT IT EXPRESSES AND THE RESPONSIBILITIES XT PLACES
UPON US !\S THE LAND/PROPERTY ""..AM;. X/WE AGREE TO BE BOUND BY ALL '
TERMS AND CONDITXONS OF THE AGREEMENT.
:::ees~c?~~D.<t ~ ~
~_.
VALIDATION:
RECEIVED BY
t1~O:J~.1
3&01r'
c;-;)..7-'ti
.$K7), -
-KJ
CITY JOB #
~ECEIPT NUMBER
DATE PAIn
AMOUNT RECEIVED
e
.
EXHIBIT A,
Purpose
The purpose of this agreement is to allov 'certain development improvements to
occur prior to obtaining plan reviev approval from the Springfield Community
Services Division.
;~ope
e use of this agreement shall be limited to certain one and tvo-family
dvellings not complex in nature as determined by the Building Official and
minor alterations or modifications to existing commercial and industrial
buildings vhich are of a non-structural'type and do not adversely affect any
structural,memb~r of the building or any part of the building having fire
'resistant const'ruction.
One and tvo-family dvelling plans for structures that are complex ,in nature that
have been prepared by an Oregon licensed architect or engineer and accompanied.
by a letter of reviev prepared by said architect or engineer, stating that' the'
, submi tted material is in compliance' vi th the One and I'vo-Family Dvelling
Specialty Code, may be considered eligible for this agreement.
Thefolloving items include but are not limited to certain conditions of
develQpment identified as ineligible ,for this agreement:
a) development requiring site approval vhich,has not been obtained;
b) nev development located on land vith over six-percent slope;
c) lots having expansive (clay) soil;
d) development located vithin flood hazard areas;
e) development located within wetland areas;
f) pole buildings 'or other such type of structure that is nqt of conventional
construction.
,
-
EXHIBIT B
.
Required Inspections
To request an inspection, you must ,call 720-3769.
All inspections requested before 7:00 a.m. will be
Inspections requested after 7100 'a.m. will be made
Xemporary Electric
.
This is a 24 hour recording_
made'the same working day,
the following, work day.
site'- To be made after excavation, but prior to setting forms
Footing - After, trenches ,are excavated
Foundation
After forms are erected but prior to concrete placement
Underfloor Plumbing'- Prior ,to filling trench
Underfloor Mechanical -'Prior to insulation or ,decking .,
Post,& Beam - Prior to floor insulation or decking
Underfloor Insulation - Prior to decking
.
sanitary Sewer - Prior to filling trench
storm Sewer - Prior to filling trench
WateroLine - Prior, to ~iliing,trench
,." ."