Loading...
HomeMy WebLinkAboutPermit Mechanical 1996-8-13 COMMERCIAL/INDUSTRI. PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 ~ ~ JOB NUMBER ~~~~~ INSPECTION LINE: 726.3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORK: ~7 ~~6 ASSESSORS MAP: /7.o3--=z::?~"'3 V ~ _#4::;"~ ,. OWNER: 5y~~;g ~~.z;>, ADDRESS: 7o/~ ""11.:9~ V:;c-C,,-," 47>-^,Lz::>_ . ~, r / DESCRIPTION OF WORK~ ~-e-~A:z' r- /~"'7:.i"'~ "";'7"~~ ~ ~$~",;.......-",,?;, NEW REMODEL ~ ADDITION DEMOLISH OTHER VALUE:_ TAX LOT: -::;> ~ / CITY' c::~ , -/ c::?;r.? PHONF' STATE: ZIP' 9'?Y/? NAME ADDRESS ARCHITECT: CONTRACTOR'S NAME PHONE ADDRESS CONST. CONTRACTOR' EXPIRES PHONE GENERAl' PLUMBING: MECHANICAL:~R"~7" ELECTRICAL: I ,. PLUM81NG MECHANICAL NO. FEE CHA~GE Nn I I Single Fixture Furnace! burner & vent < 100.000 BTUs I Relocaled Bldg. Furnace/burner & vent (new Ilx. addll) > 100.000 BTUs I Water Service Floor furnace and vent II. I bani,ary fiewer Suspended wall or floor It. mounted unit heater I Storm Sewer Appliance Vent , II. separate I Stationary evap. Backflow DevIce cooler I 2- Vent Fan/Single duct I Vent System apart Irom AC or hlg. I .z- Mechanical exhaust hood and duct I I Permit Issuance I TOTAL PERMIT TOTAL PERMIT .I / II I j I J I j J "3 C.--j I I iYo> I ~. -~ I i I I , I S10.00 j /5: -e> I - OFFICE USE _ OUAD AREA: HANDICAP ACCESS: LAND USE' FLOOD PLAIN: , OF BLOGS' OCCY GROUP: , OF UNITF' ZONING' LIGHTING POWER BUDGET: WATER HEATER:_ , OF STORIES: CONSTR. TYPE' HEAT SOURCE: SO. FT. S/SO. FT. SO. FTG MAIN . SO. FTG ACCESS SO. FTG OTHER VALUE x X X PLAN CHECK FE.E TOTAL VALUE OF PROJECT_ RCPT'_ ____ DATE _ BY I BUILDING PERMIT 5% Stale Surcharoe I MECH~_. 5% S~e"--Y:r'" Surcharo~~ PAVING -/ PLUMBING 5% Slale Surcharge I'ot?_ ~ FENCE /~ ~L_ 5-: SIDEWALK CURBCUT DEMOLITION FT. FT. SUBTOTAL PERMITS. SYSTEMS DEVELOPMENT -- TOTAL PERMIT FEES EXCLUDING ELECTRICAL ---:::Z6'. -::;;?c. I J It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, Job address, type of inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same workIng day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. "- REQUIRED INSPECTIONS . UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. .x ROUGH PLUMBiNG, E.J..ECTRICAL & ,,:,~(b:'n)(NIc.;AL:~O work Is to be ...v~..,...~ ......rfthese Inspections have been made and approved. PAVING: Afler grpvel IS In place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and'forms are erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all Inslab bulldfng service equipment, conduit, piping, accessories and other ancillary equl pment Items are In place but before any concrete Is placed. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 PS.!. (306 a.1) STRUCTURAL WELDS: Performed on the lob. (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed accordIng to plans. HIGH STRENGTH 80LTING: During all bolt Ins lallation and lightening operations. (306 a.6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and draInage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B.C. Standards 43.8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved' agency, furnished to the City's Building Division before beams are placed. (2501 U.BC. STDS. 25.10,11). STRUCTURAL MASONRY: (306 a.7) . FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or vertlcals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way. to be made after all excavatIng complete and form work and sub-base material In place. ------------------------------------------------------- ROOF SHEATHING AND NAILING: Prior to Installing any roof coverIng. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. "In addition to the Inspec. tlons specified, the Building OfficIal may make or require other Inspections of any construction work to ensure compliance wllh Ihe Building, City or Development Code. )( FINAL MECHANICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All proleet conditions such as landscapIng, parking lot striping, etc. must be completed before requesting this Inspection. FINAL BUilDING: Requested after the flnal plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL PLUMBING FINAL ELECTRICAL FINAL FIRE DEPARTMENT ADDITiONAL COMMENTS' PLANS REVIEWED BY DAT~ By signature, I state and agree, that I have carefully examined the completed appllcatlon and do hereby certify thflt alllnformatlon herein Is true and correct, and I further certify that any and all work performed shall b~ done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify thai only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. OR Signature (p It... I . Date $'l3~~ RECEI PT .. ~ ~/3 -~ RECEIVED BY' /Z--=~- ''// . / VALIDATION: ~ 7- AMOUNTRECENE~ - 7-z&-")'"? DATE PAID: