HomeMy WebLinkAboutPermit Building 1992-9-29
.
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
225 'Fifth Street, Springfield. Oregon 97477
~
-JOB NUMBER 9//:;;>~
INSPECTION LINE: 726.3769
OFFICE: 726.37S9
LOCATION OF PROPOSED WORK' 7// O~Z4f:Z/~~.
ASSESSORS MAP: /7~..."z;;! -~.3
OWNER:-#.c-'~2~.~~~.~~r:s-
A'DDRESS: JI / ~ ~ G"" ~.dv&:
#~rL:Ar~- ;
hv~&.e:.
I -
CITY:
DESCRIPTION OF WORK'
NEW \t REMODEL
ADDITION
NAME
ARCHITECT:
CONTRACTOR'S NAME
GENERAL:qE//- .*L ..,~
PLUMBING:
,a:::>:z C>a>
TAX LOT'
PHONE: .-7?C/-g.y~
STAT'" ~..
ZIP:3?2t::SY
?~.~k~/~ .
VALUE: /Pr -'.;>--
. /
~/~,..,~ ""'--
- . ~ -",
I
CHARGE I
I
1
1
1
I
/~-I
1
1
1
1
I
/.s: -I
. OF UNITS'
CONSTR, TYpo.
HEAT SOURCE:
$/ SQ. FT.
X
PLAN CHECK FEF.ZSJl. 5''3
RCPP 6 "7'1'5
DEMOLISH
I BUILDING PERMIT / '2B... S'c:> PLUMBING
lS% State ~.Y'3 5% State
Surcharoe Surcharae
I ME~ICAL/-''> ~.Z 1 FENCE
..... VALUE $
15% State . _/5'" SIDEWALK
Surcharoe FT.
I PAVING CURBCUT
FT.
OTHER
ADDRESS
PHONE
CONST.
ADDRESS CONTRACTOR' EXPIRES PHONE
~,~~~~~~ ::73'3'4!G ~""Z'9'Y' ';<}(t:-/-"=>_r
, -... ~, -" / /
MECHANICAl'
ELECTRICA" ~~ E~_
PLUMBING
NO.
I FEE
1
1
I
I
1
~,W
1
1
1
I
I
Single Fixture
Relocated Bldg.
(new lix. addtl)
Water Service
It.
Sanitary Sewer
It.
Storm Sewer
It.
l/"
Backflow Device
TOTAL PERMIT
MECHANICAL
I
~HAB.GL
101"
"""
Furnace/burner & vent
<100.000 BTUs
Furnacel burner & vent
> 100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
Irom AC or htg.
Mechanical exhaust
hood and duct
I Ji...4: fEn' ~p~ Mat
,$__
Permit Issuance
$10.00
TOTAL PERMIT
QUAD AREA: \ Q. S\ ')uJ
- OFFIC~S~ -
LAND USE: \ \,~
FLOOD PLAIN'
ZONING' ill 'f.L..J
. OF BLDGS:
OCCY GROUP'
. OF STORIEf"
SQ. FT.
SQ. FTG MAIN
SQ. FTG ACCESS ,__
SQ. FTG OTHER 7~L
x
.
~ tFd?~/'p:
HANDICAP ACCESS:
LIGHTING POWER BUDGET:
WATER HEATER'
VALUE
./~.~C>>
TOTAL VALUE OF PROJECT
DATE
d'~
..,...../"./-
:>
/:? "'" I DEMOLITION
-
,
?- 2'9- ~2-sY
.Ar
I
I
I
17~.~ I
~~~<E>~ I
SUBTOTAL
PERMITS
I SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
z-5"~ 97
..
REQUIRED INSPECTIONS
.
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 B.m. will be made the same working day, requests made after 7:00 B.m. will be made
the following work day. ~
SITE INSPECTION: To be ROUGH PLUMBING,
made after excavation, but ELECTRICAL &
prior to setup of forms. MECHANICAL: No work is to
be covered until these
inspections have been made
~.ve~
ATTIC DRAFT STOPS &
CURTAIN WALLS
PAVING: After gravel Is in
place but prior to placing
asphalt or concrete.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
/" CONCRETE SLAB: To be
made after all Inslab building
serv(ce equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a sRecial inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
d ral nage II nes. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board interior wall covering Is
applied.
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.S.G.
Standards 43.8.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor Insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 US.C.
STDS. 25.10,11).
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
STRUCTURAL MASONRV: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
USC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material In
place.
"In addition to the Inspec-
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
-------------------------------------------------------
~ FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
/"FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
V FINAL ELECTRICAL
,../"'
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
....., ---
PLANS REVIEWED BY #~)ld ~ -? DATE At' ?f9-9?
By signature, I state and agree, that I have carefUlly examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with OAS 701.055 will be used on this project.
I further agree to ensure that all r~quired Inspections are requested at the proper time, that project address Is readable from the
street, that the ,~~ card Is located at the front of the property, and the approved set of plans will remain on the site at all
~:::t~:urlng Co(()~ 0., ' r---." Date \ 0, \ <\. qQ I
U~ - -: "n ,~,~ ,
VALIDA 'ON: AMOUNT RECEIVED:~, {) ~ .~. L DATE PAID: Il ) .~ y '\./k-Y
RECEIPT" I_Or x::x \ RECEIVED
r
.
,.~ \-I~t NO. q, I z,.g'O
~, ~
CITY OF SPRINGFIELD SYSTEMS DEVELOPMEN CHARGE
WORKSHEET
(COMMERCIAL & RESIDENTIAL)
NAME OR COMPANY: ,,^c.K-E.~-z..,F-. ME.ADO,^,' /wI'=>.
LOCATION: III OPl~p.,L.E:: S.:
t--:D~'27.-+~ - OO-z..OO
DEVELOPMENT TYPE: Mt>~ - ~lX'> <;..wlMM,\J& 1/0-<> L-
BUILDING SIZE:
1. STORM DRAINAG~
IMPERVIOUS SQ. FT.
.lOT SIZE
.SQ. Ft.
. X $0.192 PER SQ, FT.
c: -.)
--- ---
2. SANITARY SEWER-CITy
NO. OF PFU'S ~
(See Reverse)
. X $39.78 PER PFU
C;-'9 5('~
---- --'
3. TRANSPORTATION
NO OF UNITS X TRIP RATE X COST PER TRIP
X
X $401.05
X $401.05
X $401.05
~)
X
X
$
$
$ lQ"',,!:::
SUBTOTAL (ADD ITEMS 1,2, & 3) ,
4. ADMINISTRATIVE FEE2
BASE CHARGE (SUBTOTAL ABOVE) X .05
TOT Al- C ITY SDC,
~
- ----
$ "b? <:oj.
5. SANITARY SEWER-MWMC
NO. OF PFU'S JV.~ x $13.62 PER PFU + $10 MWMC ADMIN. FEE $
(Use PFU Total From Item 2 Above)
.~~~L~
\J Kip Burdick
SDC Coordinator
\ 0 11/<1.2--
J;
TOTAl-MWMC SDC~ )
- ---'
TOTAL SDC $ 8"".:> <:o~
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
~~ .
FIXTURE UNIT CALCULA:;I~ TABLE: Number of New Fixtures X un;;~'valent ~ Fixture Units (NOTE:
For remodels, calculate only the NET additional fixtures)
NUMBER OF
NEW FIXTURES
UNIT
EQUIVALENT
FIXTURE
UNITS
FIXTURE lYPE
Bathtub. -..-- --------.------.----..-- ,-------. ---------------.---..-- --..----
Drinking Fountain-- ------- --.-- --- -- ---, --- ------ --,.-- --- --. --. .----.
Floor Drain_._____.____________.__,__.____.'.._____._________...__.__..____
Interceptors For Grease/Oil/Solids/Etc---.----,----.---
Interceptors For Sand/Auto Wash/Etc__---------,--..--
laund ry Tub /Clotheswasher ----- --. ------ -- ----,-- -.--. -------
Clotheswasher - 3 Or More,________________.______,________..__
Mobile Home Park Trap (1 Per Trailer)_______________.__
Receptor For Refrigerator JWater StationJEtc--------
Receptor For Commercial Sink/Dishwasher JEtc--
Shower, Single Stall,._____.__._,__.__.....__.__._..__.______....__..
Shower, Gang__----.-,--,--__.---..--..-..--.--.--.--.__.__.-__..'--...
Sink, Bar, Commercial.--....-.--..-..--.--.-.--..--......--..-.-..
Urinal, StaIlJWaIL..-----.--.-.----.--...-..-.--'. ......-...-..--...---.
Wash Basin/Lavatory, Single___________.______.__.___._______.
Water Closet, Public Installation.__________.____._______.___.
Water Closet, Private..______..__...._.....__,__...._..____..__.____
Miscellaneous:
2
1
2
3
6
2
6
6
1
3
2
I/Head
2
2
1
6
4
'7..
TOTAL FIXTURE UNITS
'Z-
CREDIT CAlCUU\TION TABLE: Based on assessed value_ If improvements occurred after annexation date in table,
calculate credits separates. . ~-
Year Rate per $1,000 .--- - - Year Rate per $1,000 -1
Annexed Assessed Value Annexed Assessed Value ]
~
1979 or before
1980
1981
1982
1983
1984
$2.83
2_76
2_71
2.60
2.46
2.33
1985
1986
1987
1988
1989
1990
1991
$2.16
1.90
1.60
0.25
0.87
0.50
0.16
Improvement (if after annexation date)
X $
(Rate X Assessed Value)
X $
(Rate X Assessed Value)
CREDIT TOTAL ~ $
Credit for Parcel or Land Only 11 Applicable
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
Resid entiaL ___,__. ___ ___ __'__' __ ____' _____., __.. _..,.,. -. -- ---, -- 0_4
CommerciaL-----------,-------,----,--------------------,.--.-- 0_9
I nd ustrial__ ___. ._____ ,__ ________ ____ ____, _____ __ --- --' -- -- --, --. --.. 0_ 45
GovernmentaL- __. __ ____ __ _ ___ ___.. ___ __ __ __.... -- -- -- --' ---... 0.5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT